| Date |
Event/Location |
Agenda |
Minutes |
Misc. |
| October 23, 2012 |
Richmond, VA
Hosted by Dominion
With Web Conferencing |
10:00am - 4:00pm (Eastern) |
|
|
| August 21, 2012 |
Colorado Springs, CO
Hosted by El Paso Western Pipeline
With Web Conferencing |
10:00am - 4:00pm (Mountain) |
|
|
| May 1, 2012 |
Carmel, IN
Hosted by ACES Power
With Web Conferencing |
10:00am - 4:00pm (Eastern) |
|
|
| February 21, 2012 |
Phoenix, AZ
Hosted by SRP at the PERA Club
With Web Conferencing |
10:00am - 4:00pm (Mountain) |
|
Transcripts from the meeting can be ordered from Jill Vaughan, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807
Hotels with SRP Rates
SRP PERA Club Street Map
SRP PERA Club Directions
PHX Airport Facility
SRP PERA Club Grounds Map
SRP PERA Club Meeting Room Locations for NAESB Meetings |
| January 24, 2012 |
WEQ EC Single Topic
Review Session
Conference call
With Web Conferencing
Topic: Network Service on OASIS(NITS) |
Announcement and Agenda with links to meeting materials |
|
NITS General Overview 1/24/12 |
| January 20, 2012 |
Joint WGQ and WEQ EC Notational Ballot
Due February 3, 2011 |
|
Notational Ballot Due February 3, 2012 |
|
| October 25-27, 2011 |
Richmond, VA
Hosted by Dominion
With Web Conferencing |
Agenda with links to meeting materials |
WEQ 10/25/11
Draft Minutes
WEQ 2011 Annual Plan as approved by the WEQ EC (clean)
WEQ 2011 Annual Plan as approved by the WEQ EC (redline)
WEQ 2012 Annual Plan as approved by the WEQ EC (clean)
WEQ 2012 Annual Plan as approved by the WEQ EC (redline)
Retail 10/26/11
Draft Minutes
Retail 2012 Annual Plan as approved by the Retail EC (clean)
Retail 2012 Annual Plan as approved by the Retail EC (redline)
Retail 2011 Annual Plan as approved by the Retail EC (clean)
Retail 2011 Annual Plan as approved by the Retail EC (redline)
RGQ Notational Ballot due November 2, 2011
Revised Retail EC 2012 Annual Plan
WGQ 10/27/11
Draft Minutes
WGQ 2012 Annual Plan as approved by the WGQ EC (clean)
WGQ 2012 Annual Plan as approved by the WGQ EC (redline)
WGQ 2011 Annual Plan as approved by the WGQ EC (clean)
WGQ 2011 Annual Plan as approved by the WGQ EC (redline) |
Transcripts from the meeting can be ordered from Jill Vaughan, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807
Nearby Hotels
Proposed Redlines to the August 16, 2011 WEQ EC Draft Minutes, Submitted by E. Skiba, Midwest ISO
BPS EC Update - 10/25/11
SRS EC Update - 10/25/11
WEQ EC Meeting Materials Assembled
WEQ EC Agenda Cross Reference
Retail EC Meeting Materials Assembled
Retail EC Agenda Cross Reference
WGQ EC Meeting Materials Assembled
WGQ EC Agenda Cross Reference |
| October 3-4, 2011 |
FERC Order 1000 Task Force
Houston, TX
Held at the NAESB office
With Web Conferencing |
Announcement and Agenda
Day 2 CANCELLED |
Meeting Notes
FERC Order 1000 Matrix |
Order 1000 Determination Matrix |
| August 16-18, 2011 |
Colorado Springs, CO
Hosted by El Paso Western Pipeline
With Web Conferencing |
Agenda with links to meeting materials |
WEQ 8/16/11
Final Minutes
WEQ 2011 Annual Plan with Redlines approved by the WEQ EC
Retail 8/17/11
Final Minutes
Retail 2011 Annual Plan with Redlines approved by the Retail EC
Retail 2011 Annual Plan Item 8(c) / R10008 as revised/approved by the REQ EC - Redline
Retail 2011 Annual Plan Item 8(c) / R10008 as revised/approved by the REQ EC - Clean
Retail 2011 Annual Plan Item 7 as revised/approved by the REQ/RGQ ECs - Redline
Retail 2011 Annual Plan Item 7 as revised/approved by the REQ/RGQ ECs - Clean
WGQ 8/18/11
Final Minutes
WGQ 2011 Annual Plan with Redlines approved by the WGQ EC |
Transcripts from the meeting can be ordered from Jill Vaughan, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807
Meeting Arrangements
Suggested Changes to June 30, 2011 WEQ EC Draft Minutes Submitted by E. Skiba, Midwest ISO (Redline)
WEQ Standards Review Subcommittee Update
WEQ BPS Subcommittee Update
Two-Tier Firm Curtailment Cover Letter
Attachment 1: Two-Tier Firm Curtailment Overview
Attachment 2: Procedural History of Two-Tier Firm Curtailment
Attachment 3: Policy Concern Position Paper
Attachment 4: No Policy Concern Position Paper
WEQ EC Meeting Materials Assembled
WEQ EC Agenda Cross Reference
Retail EC Meeting Materials Assembled
Retail EC Agenda Cross Reference
WGQ EC Meeting Materials Assembled
WGQ EC Agenda Cross Reference
Supplemental Material:
WEQ 2011 Annual Plan - OASIS Subcommittee Revisions Submitted 8/11/11
Two-Tier Support
BPS Two-Tier Firm Curtailment
NITS on OASIS Summary EC Presentation
WEQ OASIS Progress Report as of 8/11/11 |
| June 30, 2011 |
WEQ EC Single Topic
Conference call
With Web Conferencing
Topic: SAMTS |
Announcement and Agenda with links to meeting materials |
Final Minutes
Meeting Motions
SAMTS Recommendation as revised by the WEQ EC on June 30, 2011
WEQ EC Notational Ballot due July 8, 2011
Results |
Transcripts from the meeting can be ordered from Jill Vaughan, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807 |
| May 20, 2011 |
WEQ EC Single Topic
Review Session
Conference call
With Web Conferencing
Topic: SAMTS |
Announcement and Agenda with links to meeting materials |
Meeting Notes |
Example of a Coordinated Group
SAMTS Flow Diagram Example of Coordination Process
How SAMTS Recommendation Addresses FERC Guidance
How SAMTS Recommendation Addresses WEQ EC Scope Document |
| May 6, 2011 |
WEQ EC Notational Ballot
Due May 20, 2011 |
|
Notational Ballot Due May 20, 2011
Results |
|
May 4-5, 2011
The May 3 WEQ EC meeting is cancelled |
Carmel, IN
Hosted by ACES Power
With Web Conferencing |
Agenda with links to meeting materials |
Retail 5/4/11
Final Minutes
Retail Meeting Motions
2011 Retail Annual Plan as approved by the Retail ECs on 5/4/11 (redlined)
WGQ 5/5/11
Final Minutes
WGQ Meeting Motions
2011 WGQ Annual Plan as approved by the WGQ EC on 5/5/11 (redlined)
WGQ Notational Ballot on R10009 Due May 19, 2011
WGQ Notational Ballot on C10001 Due May 19, 2011 |
Transcripts from the meeting can be ordered from Jill Vaughan, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807
Nearby Hotels
Retail EC Meeting Materials Assembled
Retail EC Agenda Cross Reference
WGQ EC Meeting Materials Assembled
WGQ EC Agenda Cross Reference |
| March 25, 2011 |
WEQ EC Notational Ballot
Due April 8, 2011 |
|
Notational Ballot Due April 8, 2011
Results |
|
| March 21, 2011 |
WEQ EC Single Topic
Conference call
With Web Conferencing
Topic: Energy Efficiency |
Agenda with links to meeting materials |
Final Minutes
Meeting Motions
WEQ Notational Ballot Due April 8, 2011
Results
Attachments: Recommendation 2010 WEQ Annual Plan Item 4(d) as revised by the WEQ EC 03/21/2011 - (Redine)
Recommendation 2010 WEQ Annual Plan Item 4(d) as revised by the WEQ EC 03/21/2011 - (Clean)
| Transcripts from the meeting can be ordered from Jill Vaughan, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807 |
| February 1-3, 2011 |
Phoenix, AZ
Hosted by SRP at the PERA Club
With Web Conferencing |
Agenda with links to meeting materials |
WEQ 02/01/2011
Final Minutes
WEQ Notational Ballot Due February 18, 2011
2011 WEQ Annual Plan as adopted by the WEQ EC on 2/1/11
Recommendation WEQ 2010 Annual Plan Item 4a and 4b as revised by the WEQ EC on 02/01/2011
Recommendation WEQ 2010 Annual Plan Item 6(a-c) as revised by the WEQ EC on 02/01/2011
Recommendation WEQ 2010 Annual Plan Item 6a(ii) as revised by the WEQ EC on 02/01/2011
Recommendation WEQ 2010 Annual Plan Item 6b(ii) as revised by the WEQ EC on 02/01/2011
Recommendation WEQ 2010 Annual Plan Item 6c(ii) as adopted by the WEQ EC on 02/01/2011
Retail 02/02/2011
Final Minutes
2011 Retail Annual Plan as adopted by the Retail EC on 2/2/11
WGQ 02/03/2011
Final Minutes
2011 WGQ Annual Plan as adopted by the WGQ EC on 2/3/11 |
Transcripts from the meeting can be ordered from Jill Vaughan, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807
Hotels with SRP Rates
SRP PERA Club Street Map
PHX Airport Facility
SRP PERA Club Directions
SRP PERA Club Grounds and Meeting Rooms
WEQ SRS Scope of Work (SRS Approved 01/18/2011) Clean
WEQ SRS Scope of Work (SRS Approved 01/18/2011) Redline
WEQ SRS EC Update
Suggested Changes to October 22, 2010 Joint REQ/WEQ EC Draft Minutes Submitted by E. Skiba, Midwest ISO (Redline)
Suggested Changes to October 26, 2010 WEQ EC Draft Minutes Submitted by E. Skiba, Midwest ISO (Redline)
Suggested Changes to August 17, 2010 WEQ EC Draft Minutes Submitted by E. Skiba, Midwest ISO (Redline)
WEQ BPS EC Update
2011 WEQ Annual Plan with redlined changes submitted by WEQ Leadership
WEQ EC Meeting Materials Assembled
Retail EC Meeting Materials Assembled
WGQ EC Meeting Materials Assembled
WEQ EC Agenda Cross Reference
Retail EC Agenda Cross Reference
WGQ EC Agenda Cross Reference
Supplemental: SAMTS EC Update 1/28/11
Supplemental: SAMTS scope with recommended revisions 1/28/11 |
| December 6, 2010 |
WEQ EC Notational Ballot
Due December 20, 2010 |
|
Notational Ballot Due December 20, 2010
Results |
|
| December 6, 2010 |
Joint WEQ and WGQ ECs Notational Ballot
Due December 20, 2010 |
|
Notational Ballot Due December 20, 2010
Results |
|
| October 26-28, 2010 |
Richmond, VA
Hosted by Dominion
With Web Conferencing |
Announcement
Agenda with links to meeting materials |
WEQ 10/26/10
Final Minutes
WEQ Meeting Motions
Recommendation WEQ 2010 Annual Plan Item 1.a.i as revised by the WEQ EC on 10/26/2010 (Redline)
Recommendation WEQ 2010 Annual Plan Item 1.a.i as revised by the WEQ EC on 10/26/2010 (Clean)
Minor Correction MC10032 as revised by the WEQ EC on 10/26/2010
2010 WEQ Annual Plan as revised by the WEQ EC on 10/26/10 (Redline)
2011 WEQ Annual Plan as adopted by the WEQ EC on 10/26/10
Retail 10/27/10
Final Minutes
Retail Meeting Motions
2010 Retail Annual Plan as revised by the Retail EC on 10/27/10 (Redline)
2011 Retail Annual Plan as revised by the Retail EC on 10/27/10
WGQ 10/28/10
Final Minutes
WGQ Meeting Motions
2010 WGQ Annual Plan as revised by the WGQ EC on 10/28/10 (Redline)
2011 WGQ Annual Plan as revised by the WGQ EC on 10/28/10 |
SRS Scope of Work SRS Approved 5/18/10 (redline)
Transcripts from the meeting can be ordered from Jill Vaughn, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807
Nearby Hotels
Additional Meeting Information
WEQ SRS EC Update
WEQ BPS EC Update
WEQ EC Meeting Materials Assembled
WEQ EC Agenda Cross Reference
Retail EC Meeting Materials Assembled
Retail EC Agenda Cross Reference
WGQ EC Meeting Materials Assembled
WGQ EC Agenda Cross Reference |
| October 22, 2010 |
Joint WEQ/REQ EC Single Topic
Conference call
With Web Conferencing
Topic: Smart Grid PAP10 |
Agenda with links to meeting materials |
Final Minutes
WEQ Notational Ballot Due 10/29/2010
Attachments to WEQ Notational Ballot:
WEQ PAP10 Recommendation as revised by the WEQ EC on 10/22/2010 (redline)
WEQ PAP10 Recommendation as revised by the WEQ EC on 10/22/2010 (clean)
Meeting WEQ Motions
Attachments to Meeting Minutes:
REQ PAP10 Recommendation as approved by the REQ EC on 10/22/2010 (clean)
REQ PAP10 Recommendation as approved by the REQ EC on 10/22/2010 (redline)
WEQ PAP10 Recommendation as revised by the WEQ EC on 10/22/2010 (redline)
WEQ PAP10 Recommendation as revised by the WEQ EC on 10/22/2010 (clean)
WEQ and REQ Meeting Motions |
Transcripts from the meeting can be ordered from Jill Vaughan, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807
Summary of Model Modifications submitted by S. Van Ausdall, Xtensible Solutions
NAESB PAP10 Standard EC Presentation
Wholesale Recommendation (October 18, 2010)
Retail Recommendation (October 18, 2010)
NAESB PAP10 EUI Model 20101018 (ZIP file)
NAESB PAP10 Updates - 10/18/10
NAESB WEQ PAP10 - Southern Companies' Proposed Additions Submitted by L. Tillman, Balch & Bingham
NAESB REQ PAP10 - Southern Companies' Proposed Additions Submitted by L. Tillman, Balch & Bingham
Late Comments Submitted by E. Skiba, MISO in response to the “WEQ PAP10 Late Comments of the Smart Grid Standards Subcommittee on Priority Action Plan 10”
Additional Late Comments Submitted by E. Skiba, MISO - comments are associated to the October 18th WEQ PAP-10 Recommendation |
| October 15, 2010 |
Joint WEQ/REQ EC Single Topic
Review Session
Conference call
With Web Conferencing
Topic: Smart Grid PAP10 |
Agenda with links to meeting materials |
|
Summary of Model Modifications submitted by S. Van Ausdall, Xtensible Solutions
NAESB PAP10 Standard EC Presentation |
| August 17-19, 2010 |
Colorado Springs, CO
Hosted by El Paso
With Web Conferencing |
Agenda with links to meeting materials |
WEQ 8/17/10
Final Minutes
Meeting Motions
2010 WEQ Annual Plan as revised by the WEQ EC on 8/17/10 (Redline)
WEQ Minor Correction MC10031 as revised by the WEQ EC on August 17, 2010
WEQ/WGQ Minor Correction MC10019 as revised by the WEQ EC on August 17, 2010 and the WGQ EC on August 19, 2010
Scope Recommendation Coordination of Transmission Service Across Multiple Transmission Systems as revised by the WEQ EC on August 17, 2010
Retail 8/18/10
Final Minutes
Meeting Motions
RGQ Notational Ballot due September 7, 2010
2010 Retail Annual Plan as revised by the Retail EC on 8/18/10 (Redline)
2010 Retail Annual Plan Item No. 4 Recommendation as revised by the Retail EC on 8/18/10 - Redline
2010 Retail Annual Plan Item No. 4 Recommendation as revised by the Retail EC on 8/18/10 - Clean
2009 Retail Annual Plan Item No. 10 (a) and (c) Recommendation as revised by the Retail EC on 8/18/10 - Redline
2009 Retail Annual Plan Item No. 10 (a) and (c) Recommendation as revised by the Retail EC on 8/18/10 - Clean
WGQ 8/19/10
Final Minutes
Meeting Motions
WEQ/WGQ Minor Correction MC10019 as revised by the WEQ EC on August 17, 2010 and the WGQ EC on August 19, 2010
Annual Plan 2008 Item 5 / Annual Plan 2009 Item 4 / Annual Plan 2010 Item 3 / R08028 Recommendation with revised attachments as approved by the WGQ EC on August 19, 2010
Attachment 1 (Offer) to Annual Plan 2008 Item 5 / Annual Plan 2009 Item 4 / Annual Plan 2010 Item 3 / R08028 Recommendation as revised by the WGQ EC on August 19, 2010
Attachment 2 (Bid) to Annual Plan 2008 Item 5 / Annual Plan 2009 Item 4 / Annual Plan 2010 Item 3 / R08028 Recommendation as revised by the WGQ EC on August 19, 2010
Attachment 5 (Business Documentation) to Annual Plan 2008 Item 5 / Annual Plan 2009 Item 4 / Annual Plan 2010 Item 3 / R08028 Recommendation as revised by the WGQ EC on August 19, 2010
Attachment 6 (Standards Modifications Redlined) to Annual Plan 2008 Item 5 / Annual Plan 2009 Item 4 / Annual Plan 2010 Item 3 / R08028 Recommendation as revised by the WGQ EC on August 19, 2010
Recommendation R09014/WGQ 2010 Annual Plan Item #6 that failed during the WGQ EC |
WEQ-001 Minor Correction to be applied to version 002.2, Submitted by M. Goldberg, ISO New England Inc.
Meeting Arrangements
Suggested Changes to June 4, 2010 Joint WEQ/WGQ EC Draft Minutes Submitted by D. Davis, Williams Gas Pipeline (Redline)
WEQ BPS EC Update Presentation
WEQ SRS EC Update Presentation
WEQ EC Meeting Materials Assembled
Retail EC Meeting Materials Assembled
WGQ EC Meeting Materials Assembled
WEQ EC Agenda Cross Reference
Retail EC Agenda Cross Reference
WGQ EC Agenda Cross Reference
Supplemental: WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems
Transcripts from the meeting can be ordered from Agren Blando Court Reporting - 216 16th Street, Suite 650, Denver, CO 80202, 303-296-0017 |
| July 7, 2010 |
Dallas, TX
Held at the Grand Hyatt DFW Airport
With Web Conferencing |
Agenda with links to meeting materials |
Final Minutes
Meeting Motions
Notational Ballot due July 16
Notational Ballot Results
PAP03 WEQ 2010 Annual Plan Item 6a Revised by the WEQ EC 07/07/10 Redline
PAP03 WEQ 2010 Annual Plan Item 6a Revised by the WEQ EC 07/07/10 Clean
PAP04 WEQ 2010 Annual Plan Item 6b Revised by the WEQ EC 07/07/10 Redline
PAP04 WEQ 2010 Annual Plan Item 6b Revised by the WEQ EC 07/07/10 Clean
PAP09 WEQ 2010 Annual Plan Item 6c Revised by the WEQ EC 07/07/10 Redline
PAP09 WEQ 2010 Annual Plan Item 6c Revised by the WEQ EC 07/07/10 Clean |
Supplemental Guide to Changes
Transcripts from the meeting can be ordered from Jill Vaughan, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807 |
| June 18, 2010 |
WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems
Conference Call
With Web Conferencing |
Agenda with links to meeting materials |
Meeting Notes
Pre-meeting Rewritten Scope 6/18/10 as Submitted by A. Pritchard, Duke - Redline
Motions - Redline
Cover Letter - Redline
Scope Recommendation for Coordination of Transmission Service Across Multiple Systems
EPSA Scoping TF Queuing Discussion Paper
Cover Letter for Task Force Recommendation for Coordination of Transmission Service Across Multiple Transmission Systems |
Draft Scoping Statement REVISED 6-15-2010 - Clean
Draft Scoping Statement REVISED 6-15-2010 - Redline
TC Work Group Response to TP Report Clean
TC Work Group Response to TP Report Redlined
TP Parking Lot Responses REVISED 6-15-2010 - Clean
TP Parking Lot Responses REVISED 6-15-2010 - Redline
Rewritten Scope 6/17/10 as Submitted by A. Pritchard, Duke
Pre-meeting Rewritten Scope 6/18/10 as Submitted by A. Pritchard, Duke |
| June 16, 2010 |
Joint WEQ/REQ EC Single Topic
Conference call
With Web Conferencing
Topic: Smart Grid PAPs 3, 4, and 9: 2010 WEQ Annual Plan Item 6(a)/2010 REQ Annual Plan Item 9(a), 2010 WEQ Annual Plan Item 6(b)/2010 REQ Annual Plan Item 9(b), 2010 WEQ Annual Plan Item 6(c) and 2010 REQ Annual Plan Item 9(c) |
Agenda with links to meeting materials |
Final Minutes
WEQ EC Notational Ballot Due June 25, 2010
WEQ EC Notational Ballot Results
Notational Ballot and Comments Submitted by L. Westerfield, Idaho PUC representing NARUC
Meeting Motions
2010 WEQ Annual Plan Item 6(a) - PAP03 as Revised by the WEQ EC on June 16, 2010
2010 WEQ Annual Plan Item 6(b) - PAP04 as Revised by the WEQ EC on June 16, 2010
2010 WEQ Annual Plan Item 6(c) - PAP09 Wholesale as Revised by the WEQ EC on June 16, 2010
2010 REQ Annual Plan Item 9(a) - PAP03 as Approved by the REQ EC on June 16, 2010
2010 Retail Annual Plan Item 9(b) - PAP04 as Approved by the REQ EC on June 16, 2010
2010 Retail Annual Plan Item 9(c) - PAP09 Retail as Approved by the REQ EC on June 16, 2010 |
Transcripts from the meeting can be ordered from Jill Vaughn, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807
Revised Smart Grid Standards Task Force Response to Comments on Recommendation WEQ 2010 AP Item 6 (a) / REQ Annual Plan Item 9(a); Requirements Specification for Common Electricity Product and Pricing Definition – for NIST PAP03
Revised Smart Grid Standards Task Force Proposed Modifications to WEQ 2010 AP Item 6 (a) / REQ Annual Plan Item 9(a); Requirements Specification for Common Electricity Product and Pricing Definition – for NIST PAP03
Revised Smart Grid Standards Task Force Response to Comments on Recommendation REQ 2010 AP Item 9 (c); Requirements Specifications for Retail Standard DR Signals – for NIST PAP09
Revised Smart Grid Standards Task Force Response to Comments on Recommendation WEQ 2010 AP Item 6 (b) / REQ Annual Plan Item 9(b); Requirements Specifications for Common Scheduling Mechanism for Energy Transactions – for NIST PAP04
Revised Smart Grid Standards Task Force Response to Comments on Recommendation WEQ 2010 AP Item 6 (c); Requirements Specifications for Wholesale Standard DR Signals – for NIST PAP09
Smart Grid Standards Task Force Proposed Modifications to Requirement Specification for Common Scheduling Mechanism for Energy Transactions - for NIST PAP04
Smart Grid Standards Task Force Proposed Modifications to Requirement Specification for Retail Standard DR Signals - for NIST PAP09
Smart Grid Standards Task Force Proposed Modifications to Requirement Specificaiton for Wholesale Standard DR Signals - for NIST PAP09
Late Comments received 6/15/10 from E. Skiba, Midwest ISO for PAP03
Late Comments received 6/15/10 from E. Skiba, Midwest ISO for Wholesale PAP09
Late Comments received 6/15/10 from E. Skiba, Midwest ISO for PAP04
Late Comments received 6/16/10 from A. Marino, PA PUC for PAP03 |
| June 16, 2010 |
WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems
Conference Call
With Web Conferencing |
CANCELLED - Rescheduled to June 15, 2010 |
|
|
| June 15, 2010 |
WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems
Conference Call
With Web Conferencing |
Agenda with links to meeting materials
Call was extended to 2pm Central |
Meeting Notes
Draft Scoping Statement REVISED 6-15-2010 - Clean
Draft Scoping Statement REVISED 6-15-2010 - Redline
TC Work Group Response to TP Report Clean
TC Work Group Response to TP Report Redlined
TP Parking Lot Responses REVISED 6-15-2010 - Clean
TP Parking Lot Responses REVISED 6-15-2010 - Redline |
Draft Scoping Statement REVISED
Linked request where one is a Matching request (Linked request 2) REVISED
TC Work Group Response to TP report REVISED
Draft Scoping Statement REVISED by A. Pritchard - 06/14/2010
TP Parking Lot Responses - 05/13/2010 (Clean)
Comments Submitted by P. Sorenson - 05/14/2010 |
| June 14, 2010 |
WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems
Conference Call
With Web Conferencing |
Agenda with links to meeting materials |
Draft Scoping Statement REVISED
Linked request where one is a Matching request (Linked request 2) REVISED
TC Work Group Response to TP report REVISED |
TC Work Group Responses to TP Status Report Revised June 1
Draft Scoping Statement
Parking Lot
Work Paper Submitted by A. Pritchard, Duke |
| June 7, 2010 |
Joint WEQ/REQ EC Single Topic
Review Session
Conference call
With Web Conferencing
Topic: Smart Grid PAPs 3, 4, and 9: 2010 WEQ Annual Plan Item 6(a)/2010 REQ Annual Plan Item 9(a), 2010 WEQ Annual Plan Item 6(b)/2010 REQ Annual Plan Item 9(b), 2010 WEQ Annual Plan Item 6(c) and 2010 REQ Annual Plan Item 9(c) |
Agenda with links to meeting materials |
Meeting Notes |
Revised Smart Grid Standards Task Force Response to Comments on Recommendation WEQ 2010 AP Item 6 (a) / REQ Annual Plan Item 9(a); Requirements Specification for Common Electricity Product and Pricing Definition – for NIST PAP03
Revised Smart Grid Standards Task Force Proposed Modifications to WEQ 2010 AP Item 6 (a) / REQ Annual Plan Item 9(a); Requirements Specification for Common Electricity Product and Pricing Definition – for NIST PAP03
Revised Smart Grid Standards Task Force Response to Comments on Recommendation REQ 2010 AP Item 9 (c); Requirements Specifications for Retail Standard DR Signals – for NIST PAP09
Revised Smart Grid Standards Task Force Response to Comments on Recommendation WEQ 2010 AP Item 6 (b) / REQ Annual Plan Item 9(b); Requirements Specifications for Common Scheduling Mechanism for Energy Transactions – for NIST PAP04
Revised Smart Grid Standards Task Force Response to Comments on Recommendation WEQ 2010 AP Item 6 (c); Requirements Specifications for Wholesale Standard DR Signals – for NIST PAP09
Smart Grid Standards Task Force Proposed Modifications to Requirement Specification for Common Scheduling Mechanism for Energy Transactions - for NIST PAP04
Smart Grid Standards Task Force Proposed Modifications to Requirement Specification for Retail Standard DR Signals - for NIST PAP09
Smart Grid Standards Task Force Proposed Modifications to Requirement Specificaiton for Wholesale Standard DR Signals - for NIST PAP09 |
| June 4, 2010 |
Joint WEQ/WGQ EC Single Topic
Conference call
With Web Conferencing
Topic: 2009 WEQ Annual Plan Items 5(a)(2),5(i)/R08004/R09011 |
Agenda with links to meeting materials |
Final Minutes
WGQ Recommendation R09011 as revised by the EC on June 4, 2010
WEQ Recommendation 2009 WEQ Annual Plan Items 5(a)(2),5(i)/R08004/R09011 Attachment as revised by the EC on June 4, 2010 - Redline
WEQ Recommendation 2009 WEQ Annual Plan Items 5(a)(2),5(i)/R08004/R09011 Attachment as revised by the EC on June 4, 2010 - Clean
Voting Record |
Transcripts from the meeting can be ordered from U.S. Legal, 713-653-7100 |
| June 1, 2010 |
WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems
Conference Call
With Web Conferencing |
Agenda with links to meeting materials |
Meeting Notes
TC Work Group Responses to TP Status Report Revised June 1 |
EPSA Scoping TF Queuing Discussion Paper
TC Work Group Responses to TP Status Report – Revised 5/19/2010
Draft Scoping Statement – Submitted by A. Prtichard 06/01/2010 |
| May 19, 2010 |
WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems
Conference Call
With Web Conferencing |
Agenda with links to meeting materials |
Meeting Notes
TC Work Group Responses to TP Status Report - Revised 05/19/2010
| TP Scoping Work Paper 05-13-10 (Clean)
TP Parking Lot Responses 05-13-10 (Clean)
Parking Lot - Clean
Interim Status Report from the TP Group With Transmission Customer (TC) Group Responses |
May 4-5, 2010
Please note revised dates, WGQ EC Cancelled |
Harrisburg, PA
Hosted by the Pennsylvania PUC
With Web Conferencing |
Updated Agenda with links to meeting materials |
WEQ 5/4/10
Final Minutes
2010 WEQ Annual Plan as revised by the WEQ EC on 5/4/10 (Redline)
Retail 5/5/10
Final Minutes
Recommendation: 2009 Retail Annual Plan Items 10.a and 10.c as revised by the Retail ECs on 5/5/2010
2010 Retail Annual Plan as revised by the Retail EC on 5/5/10 (Redline) |
Map to PA PUC
Transcripts from the meeting can be ordered from Jill Vaughn, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807
Nearby Hotels and Parking Information
Map of the Capitol Complex
Joint Minor Correction to NAESB WEQ Version 002.1 Standard WEQ-014-A and WGQ Version 1.9 Standard No. 11.4.1 (Implementation Guide for Electronic Tariff Filing), Submitted by D. Davis, Williams Gas Pipeline
Supplemental: WEQ SRS EC Update Presentation
Supplemental: WEQ BPS EC Update Presentation
WEQ EC Meeting Materials Assembled
Retail EC Meeting Materials Assembled
WEQ EC Agenda Cross Reference
Retail EC Agenda Cross Reference
Supplemental: WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems Update Presentation |
| April 26, 2010 |
WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems
Conference Call
With Web Conferencing |
Agenda with links to meeting materials |
Meeting Notes
Parking Lot - Clean
Parking Lot - Redline |
Interim Status Report from the TP Task Force
Recommended Scope of Work for the OASIS Subcommittee (DRAFT) - 04/26/2010 |
| April 21, 2010 |
WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems
Conference Call
With Web Conferencing |
CANCELLED |
|
|
| April 7, 2010 |
WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems
Conference Call
With Web Conferencing |
CANCELLED |
|
|
| March 31, 2010 |
WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems
Conference Call
With Web Conferencing |
Agenda with links to meeting materials |
Meeting Notes
Parking Lot - Redlined
Scope for Task Force from Order 890
RM05-25 Industry Comments - Highlights and Marginalia |
EC Task Force Parking Lot of Issues
Order 676-E excerpt on Coordination of Requests Across Multiple Transmission Systems Submitted by A. Pritchard, Duke Energy
Order 890 - Standardization of Business Practices for Study Queue Processing Submitted by A. Pritchard, Duke Energy
Order 890-A - Standardization of Business Practices for Study Queue Processing Submitted by A. Pritchard, Duke Energy
RM05-25 Comments on Need for Coordination of Requests across TPs Submitted by A. Pritchard, Duke Energy
Processsing Across Multiple Systems - Entergy Position 03/31/10 Submitted by N. Saini |
| March 22, 2010 |
WEQ EC Scoping Task Force on Coordination of Service Across Multiple Transmission Systems
Conference Call
With Web Conferencing |
Agenda with links to meeting materials |
Meeting Notes
EC Task Force Parking Lot of Issues |
OASIS subcommittee NITS on OASIS Parking Lot document
FERC Order No. 676-E
NCEMC comments on NAESB WEQ business practice standards |
| March 12, 2010 |
WEQ EC Task Force for Confidentiality Agreement
Conference Call |
Announcement, Agenda and Work Papers |
Meeting Notes
Recommendation to the WEQ EC |
|
| February 2-4, 2010 |
Phoenix, AZ
Hosted by SRP at the PERA Club
With Web Conferencing |
Agenda with links to meeting materials - Revised |
WEQ 2/2/10
Final Minutes
Meeting Motions
Recommendation WEQ 2009 AP Item 5.b - Modify NAESB definitions to address internal inconsistencies and inconsistencies with the NERC glossary as revised during the WEQ EC Meeting (Redlined)
2010 WEQ Annual Plan as revised by the WEQ EC on 2/2/10 (Redline)
2010 WEQ Annual Plan as revised by the WEQ EC on 2/2/10 (Clean)
Retail 2/3/10
Final Minutes
Meeting Motions
2010 Retail Annual Plan as revised by the Retail EC on 2/3/10 (Redline)
2010 Retail Annual Plan as revised by the Retail EC on 2/3/10 (Clean)
WGQ 2/4/10
Final Minutes
Meeting Motions
2010 WGQ Annual Plan as revised by the WGQ EC on 2/4/10 (Redline)
2010 WGQ Annual Plan as revised by the WGQ EC on 2/4/10 (Clean) |
PHX Airport Map
SRP PERA Club Street Map
SRP PERA Club Directions
Nearby Hotels
Meeting Room Locations
WEQ SRS EC Update Presentation
WEQ BPS EC Update Presentation
WEQ EC Meeting Materials Assembled
Retail EC Meeting Materials Assembled
WGQ EC Meeting Materials Assembled
WEQ EC Agenda Cross Reference
Retail EC Agenda Cross Reference
WGQ EC Agenda Cross Reference
Supplemental: Late Comments Submitted by the WEQ JESS on the NDA
Revised Supplemental: Guidance for NAESB WEQ DR/DSM Subcommittee - Revised
Transcripts from the meeting can be ordered from Jill Vaughn, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807 |
| December 3, 2009 |
WEQ EC Conference Call
With Web Conferencing
Single Topic Call: DSM-EE WEQ Phase 2 |
Agenda |
Final Minutes
WEQ 2010 Annual Plan - Redlined
WEQ EC DR Task Force Recommendation - Redlined |
Transcripts from the meeting can be ordered from Jill Webb, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807
WEQ EC DR Task Force Recommendation |
| October 27-29, 2009 |
Richmond, VA
Hosted by Dominion
With Web Conferencing |
Agenda with links to meeting materials |
WEQ 10/27/09
Final Minutes
Meeting Motions
Recommendation 2009 WEQ Annual Plan Items 1(a),3(a)(vii)/R05020 - 1.8.1 e-Tag Specifications as revised during the WEQ EC Meeting
2009 WEQ Annual Plan as revised by the WEQ EC on 10/27/09 (Redline)
Recommendation WEQ 2009 Annual Plan Item (1.a) R05020; WEQ 2009 Annual Plan Item (3.a.vii) as approved by the WEQ EC on 10/27/09 (Redline)
Attachment to Recommendation WEQ 2009 Annual Plan Item (1.a) R05020; WEQ 2009 Annual Plan Item (3.a.vii) as revised by the WEQ EC on 10/27/09 (Redline)
Recommendation WEQ 2009 Annual Plan Item (1.a) R05020; WEQ 2009 Annual Plan Item (3.a.vii) as approved by the WEQ EC on 10/27/09 (Clean)
Attachment to Recommendation WEQ 2009 Annual Plan Item (1.a) R05020; WEQ 2009 Annual Plan Item (3.a.vii) as revised by the WEQ EC on 10/27/09 (Clean)
Retail 10/28/09
Final Minutes
Meeting Motions
2009 Retail Annual Plan as revised by the Retail EC on 10/28/09 (Redline)
WGQ 10/29/09
Final Minutes
Meeting Motions
2009 WGQ Annual Plan as revised by the WGQ EC on 10/29/09 (Redline) |
Nearby Hotels
WEQ SRS EC Update Presentation
Minor Correction Request for WEQ-001-1.0 Submitted by JT Wood, Southern Company
Transcripts from the meeting can be ordered from Jill Webb, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807
WEQ BPS EC Update Presentation
Comments by the WEQ JESS on WEQ-004 Coordinate Interchange
Comments by the WEQ JESS on 1.8.1 e-Tag Specifications
WEQ EC Meeting Materials Assembled
WEQ EC Agenda Cross Reference
Retail EC Meeting Materials Assembled
Retail EC Agenda Cross Reference
WGQ EC Meeting Materials Assembled
WGQ EC Agenda Cross Reference
Supplemental: DSM Work Paper 1 Submitted by A. Breidenbaugh, EnerNoc
Supplemental: DSM Work Paper 2 Submitted by A. Breidenbaugh, EnerNoc |
| October 7, 2009 |
WEQ Glossary Meeting
Houston, TX
Held at the NAESB offices, Ste 2350
With Web Conferencing |
Agenda |
Response to Comments Submitted by B. Rehman, BPA
Response to Comments Submitted by E. Davis, Entergy
Response to Comments Submitted by F. Halpin, BPA
Response to Comments Submitted by JT Wood, Southern Company
Response to Comments Submitted by S. Stoney, South Carolina Electric and Gas Company
Response to Comments Submitted by the WEQ BPS Co-Chairs
Response to Comments Submitted by various ISO/RTOs |
Nearby Hotels
Draft Glossary Recommendation - WEQ 2009 Annual Plan Item 5.b
Comments Submitted by F. Halpin, BPA
Comments Submitted by the WEQ BPS Co-Chairs
Comments Submitted by S. Stoney, South Carolina Electric and Gas Company
Comments Submitted by E. Davis, Entergy
Comments Submitted by B. Rehman, BPA
Comments Submitted by JT Wood, Southern Company
Comments Submitted by various ISO/RTOs |
| August 25, 2009 |
Request for Informal Comments Due September 25, 2009 |
|
|
Request for Comments Due September 25, 2009
Draft Glossary Recommendation - WEQ 2009 Annual Plan Item 5.b
Comments Submitted by F. Halpin, BPA
Comments Submitted by the WEQ BPS Co-Chairs
Comments Submitted by S. Stoney, South Carolina Electric and Gas Company
Comments Submitted by E. Davis, Entergy
Comments Submitted by B. Rehman, BPA
Comments Submitted by JT Wood, Southern Company
Comments Submitted by various ISO/RTOs |
August 18, 2009
August 19 Retail EC and August 20 WGQ EC Cancelled |
Colorado Springs, CO
Hosted by El Paso Western Pipeline
With Web Conferencing |
Agenda with links to meeting materials |
WEQ 8/18/09
Final Minutes
Redlined WEQ 2009 Annual Plan
Meeting Motions |
Nearby Hotels
Transcripts from the meeting can be ordered from Jill Webb, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807
Time and Inadvertent Management Business Practice Update - August 2009
DSM/EE Scoping Task Force work paper
DSM Scoping Task Force Presentation
WEQ SRS EC Update Presentation
Minor Correction on Market Flow Threshold Submitted by WEQ BPS on 8/12/09
WEQ BPS Proposed Changes to the WEQ 2009 Annual Plan
WEQ BPS EC Update Presentation
WEQ EC Meeting Materials Assembled
Supplemental: Agenda Cross Reference
Supplemental: Merged Revised WEQ 2009 Annual Plan |
| June 8, 2009 |
WEQ EC Conference Call
With Web Conferencing
Single Topic Call: 2009 WEQ Annual Plan Item 2(a)(ii)(3) Rollover Rights on Redirect on a Firm Basis |
Agenda with links to meeting materials |
Final Minutes
WEQ EC Notational Ballot due June 23, 2009
WEQ EC Notational Ballot Submitted by E. Skiba from Midwest ISO with Comments
WEQ EC Notational Ballot Results
Meeting Motions
Recommendation 2009 WEQ Annual Plan Item 2(a)(ii)(3) as revised by the WEQ EC on 6/08/09 (Redline)
Recommendation 2009 WEQ Annual Plan Item 2(a)(ii)(3) as revised by the WEQ EC on 6/08/09 (Clean) |
Recommendation 2009 WEQ Annual Plan Item 2(a)(ii)(3) - Rollover Rights on Redirect on a Firm Basis
Comments Submitted by B. Green, EPSA
Comments Submitted by P. Sorenson, OATI
Comments Submitted by the NAESB Standards Review Subcommittee
Additional Comments Submitted by P. Sorenson, OATI
Comments Submitted by B. Rehman, BPA
Comments Submitted by M. Knox, Midwest ISO
Comments Submitted by E. Davis, Entergy
Comments Submitted by JT Wood, Southern Company
Comments Submitted by D. McGee, Southern Company
Group Comments Submitted by B. Li on behalf of MISO, PJM, SPP, ISO-NE, NYISO, ERCOT and IESO
Comments Submitted by the WEQ ESS/ITS Chairs
Transcripts from the meeting can be ordered from Jill Webb, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807
Late Comments Submitted by the WEQ ESS/ITS Subcommittee - Recommendation Revised
Late Comments Submitted by the WEQ ESS/ITS Subcommittee - Recommendation with all Formal Comments Shown
Late Comments Submitted by the WEQ ESS/ITS Subcommittee - Additional Justification
Memo from WEQ ESS/ITS Co-Chairs regarding Proposed Standard on Rollover Rights on Redirect
Late Formal Comments Submitted by E. Skiba, Midwest ISO in response to the Late Formal Comments submitted by the ESS/ITS |
| June 2, 2009 |
WEQ EC Review Session Conference Call
With Web Conferencing
Single Topic Call: 2009 WEQ Annual Plan Item 2(a)(ii)(3) Rollover Rights on Redirect on a Firm Basis |
Agenda with links to meeting materials |
Meeting Notes |
Recommendation 2009 WEQ Annual Plan Item 2(a)(ii)(3) - Rollover Rights on Redirect on a Firm Basis
Comments Submitted by B. Green, EPSA
Comments Submitted by P. Sorenson, OATI
Comments Submitted by the NAESB Standards Review Subcommittee
Additional Comments Submitted by P. Sorenson, OATI
Comments Submitted by B. Rehman, BPA
Comments Submitted by M. Knox, Midwest ISO
Comments Submitted by E. Davis, Entergy
Comments Submitted by JT Wood, Southern Company
Comments Submitted by D. McGee, Southern Company
Group Comments Submitted by B. Li on behalf of MISO, PJM, SPP, ISO-NE, NYISO, ERCOT and IESO
Comments Submitted by the WEQ ESS/ITS Chairs
Late Comments Submitted by the WEQ ESS/ITS Subcommittee - Recommendation Revised
Late Comments Submitted by the WEQ ESS/ITS Subcommittee - Recommendation with all Formal Comments Shown
Late Comments Submitted by the WEQ ESS/ITS Subcommittee - Additional Justification |
| May 12-14, 2009 |
Carmel, IN
Hosted by ACES Power Marketing
With Web Conferencing |
Corrected Agenda with revised links (as of May 5, 2009) to meeting materials |
WEQ 5/12/09
Final Minutes
Attachments to Minutes:
Meeting Motions
Recommendation 2009 WEQ Annual Plan Item 3.d as revised and approved by the WEQ EC on 5/12/09 (Redline)
Recommendation 2009 WEQ Annual Plan Item 3.d as revised and approved by the WEQ EC on 5/12/09 (Clean)
Recommendation 2009 WEQ Annual Plan Item 2.a.ii.3 as revised and approved by the WEQ EC on 5/12/09 (Redline)
Recommendation 2009 WEQ Annual Plan Item 2.a.ii.3 as revised and approved by the WEQ EC on 5/12/09 (Clean)
Minor Correction Submitted by JISWG as revised and approved by the WEQ EC on 5/12/09 (Redline)
Minor Correction Submitted by NAESB Staff as revised and approved by the WEQ EC on 5/12/09 (Redline)
2009 WEQ Annual Plan as revised by the WEQ EC on 5/12/09 (Redline)
2009 WEQ Annual Plan as revised by the WEQ EC on 5/12/09 (Clean)
Retail 5/13/09
Final Minutes
Attachments to Minutes:
Meeting Motions
2009 Retail Annual Plan as revised by the Retail EC on 5/13/09 (Redline)
2009 Retail Annual Plan as revised by the Retail EC on 5/13/09 (Clean)
WGQ 5/14/09
Final Minutes
Meeting Motions
2009 WGQ Annual Plan as revised by the WGQ EC on 5/14/09 (Redline)
2009 WGQ Annual Plan as revised by the WGQ EC on 5/14/09 (Clean)
Presentation by D. Davis, Williams Gas Pipeline - Summary of Recommendation for Proposed Capacity Release Modifications |
Map/Directions
Nearby Hotels
Minor Correction, Submitted by the JISWG (R. Harshbarger, Puget Sound Energy)
Minor Correction, Submitted by D. Rager, NAESB Staff
Minor Correction, Submitted by E. Skiba, Midwest ISO
WEQ SRS EC Update - 5/12/09
WEQ BPS EC Update - 5/12/09
WEQ EC Book
Retail EC Book
WGQ EC Book (PDF File)
WGQ EC Book (ZIP File)
Supplemental: Agenda Cross Reference
Transcripts from the meeting can be ordered from Jill Webb, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807 |
| February 3-5, 2009 |
Phoenix, AZ
Hosted by SRP at the PERA Club
With Web Conferencing |
Revised Agenda with updated links to meeting materials |
WEQ 02/03/09
Final Minutes
WEQ EC Notational Ballot Due February 23, 2009
Comments Submitted by S. Berwager, BPA
Attachment to Minutes: Meeting Motions
Attachment to Minutes: Recommendation 2008 WEQ Annual Plan Item 6.m/R07007 as revised and approved by the WEQ EC on 02/03/09 (Redline)
Attachment to Minutes: Recommendation 2008 WEQ Annual Plan Item 6.m/R07007 as revised and approved by the WEQ EC on 02/03/09 (Clean)
Attachment to Minutes: Recommendation 2008 WEQ Annual Plan Item 6.b/R07020 as revised by the WEQ EC on 02/03/09 (Redline) - notational ballot
Attachment to Minutes: Recommendation 2008 WEQ Annual Plan Item 6.b/R07020 as revised by the WEQ EC on 02/03/09 (Clean) - notational ballot
Attachment to Minutes: Minor Correction as approved by the WEQ EC on 02/03/09
Attachment to Minutes: 2009 WEQ Annual Plan as revised by the WEQ EC on 02/03/09 (Redline)
Attachment to Minutes: 2009 WEQ Annual Plan as revised by the WEQ EC on 02/03/09 (Clean)
Retail 02/04/09
Final Minutes
Attachment to Minutes: Meeting Motions
Attachment to Minutes: Recommendation 2008 Retail Annual Plan Item 2.a, Part 1 approved by the REQ/RGQ ECs on 02/04/09
Attachment to Minutes: Recommendation 2008 Retail Annual Plan Item 2.a, Part 2 approved by the REQ/RGQ ECs on 02/04/09
Attachment to Minutes: Recommendation 2008 Retail Annual Plan Items 3(iv) and (v), Part 1 as revised by the REQ/RGQ ECs on 02/04/09 (Redline)
Attachment to Minutes: Recommendation 2008 Retail Annual Plan Items 3(iv) and (v), Part 1 as revised by the REQ/RGQ ECs on 02/04/09 (Clean)
Attachment to Minutes: Recommendation 2008 Retail Annual Plan Items 3(iv) and (v), Part 1 (Attachment)
Attachment to Minutes: Recommendation 2008 Retail Annual Plan Items 3(iv) and (v), Part 2 approved by the REQ/RGQ ECs on 02/04/09
Attachment to Minutes: Minor Correction Memo submitted by the Retail BPS and approved by the REQ/RGQ ECs on 02/04/09
Attachment to Minutes: Minor Correction Memo submitted by the Retail BPS (Attachment - (Redline))
Attachment to Minutes: Minor Correction Memo submitted by the Retail BPS (Attachment - (Clean))
Attachment to Minutes: 2009 Retail Annual Plan as revised by the REQ/RGQ ECs on 02/04/09 (Redline)
Attachment to Minutes: 2009 Retail Annual Plan as revised by the REQ/RGQ ECs on 02/04/09 (Clean)
Attachment to Minutes: NAESB Schedule of 2009 Meetings (Revised 02/05/09)
Attachment to Minutes: Retail Publication Schedule (Revised 02/04/09)
WGQ 02/05/09
Final Minutes
Attachment to Minutes: Meeting Motions
Attachment to Minutes: Recommendation R06016 approved by the WGQ EC on 02/05/09
Attachment to Minutes: Recommendation R08007 approved by the WGQ EC on 02/05/09
Attachment to Minutes: 2009 WGQ Annual Plan as revised by the WGQ EC on 02/05/09 (Redline)
Attachment to Minutes: 2009 WGQ Annual Plan as revised by the WGQ EC on 02/05/09 (Clean)
Attachment to Minutes: NAESB Schedule of 2009 Meetings (Revised 02/05/09)
Attachment to Minutes: WGQ Publication Schedule (Revised 02/05/09) |
PHX Airport Map
SRP PERA Club Street Map
SRP PERA Club Directions
Nearby Hotels
WEQ Minor Correction Submitted by B. Rehman, Bonneville Power Administration
PERA Club Grounds and Meeting Rooms
Transcripts from the meeting can be ordered from Preferred Legal- 800-405-4056
WEQ EC Book
Retail EC Book
WGQ EC Book
Supplemental: Revised January 23, 2009 WEQ EC Draft Minutes
Supplemental: Recommendation 2008 WEQ Annual Plan Item 5(a) as revised by the WEQ EC on 01/27/09 (Redline) out for notational ballot due 02/10/09
Supplemental: Recommendation 2008 WEQ Annual Plan Item 5(a) as revised by the WEQ EC on 01/27/09 (Clean) out for notational ballot due 02/10/09
Supplemental: NAESB Antitrust Guidelines
Supplemental: NAESB Schedule of 2009 Meetings
Supplemental: Language to be considered that would accompany DSM standards currently out for notational ballot
Supplemental: Revised January 8, 2009 WEQ EC Meeting Notes
Supplemental: WEQ BPS Presentation
Supplemental: July 31/August 8, 2008 WEQ EC Draft Minutes
Supplemental: BPS Formal Comment Review on WEQ Annual Plan Item 6.b (R07020)
Supplemental: WEQ SRS Presentation
Supplemental: WEQ Agenda Cross Reference
Supplemental: TIMBP Presentation
Supplemental: TIMBP Supporting Documentation to Presentation |
| January 27, 2009 |
WEQ EC Conference Call
With Web Conferencing
Single Topic Call: Wholesale draft recommendation for Measurement and Verification of Demand Response programs |
Agenda with Links to Work Papers |
Final Minutes
WEQ EC Notational Ballot Due February 10, 2009
WEQ EC Notational Ballot Results
Comments Submitted by D. McGee, Southern Company
Attachment to Minutes: Recommendation 2008 WEQ Annual Plan Item 5(a) as revised by the WEQ EC on 01/27/09 (Redline)
Recommendation 2008 WEQ Annual Plan Item 5(a) as revised by the WEQ EC on 01/27/09 (Clean)
Meeting Motions - 01/27/09 |
Comments Submitted by the NAESB Standards Review Subcommittee
Transcripts from the meeting can be ordered from Jill Webb, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807
Comments Submitted by A. Breidenbaugh, EnerNoc
Comments Submitted by the IRC SRC
Attachment to Comments Submitted by the IRC SRC
Comments Submitted by J. Cowan, EVO
Comments Submitted by J. Hughes, ELCON
Comments Submitted by E. Davis, Entergy
Attachment A to Comments Submitted by Entergy
Attachment B to Comments Submitted by Entergy
Comments Submitted by E. Futoryan, Con Edison
Comments Submitted by D. McGee, Southern Company Transmission
Comments Submitted by Townsley and Saxonis, NYS Department of Public Service
Comments Submitted by G. Smith, Energy Curtailment Specialists, Inc.
Late Comments Submitted by P. McCurley, National Rural Electric Cooperative Association (NRECA)
Presentation - NAESB Wholesale Electric Demand Response Measurement & Verification Standards - 1/14/09 |
| January 23, 2009 |
WEQ EC Conference Call
With Web Conferencing |
Agenda with Work Paper |
Final Minutes
Attachment to Minutes: Draft 2009 WEQ Annual Plan as Approved by the WEQ EC 01/23/2009 |
Comments Submitted by JISWG
Comments Submitted by E. Skiba, Midwest ISO
Attachment to Comments Submitted by E. Skiba, Midwest ISO
Comments Submitted by B. Green, EPSA
Comments Submitted by E. Davis, Entergy
Comments Submitted by B. Rehman, BPA
Comments Submitted by A. Rodriquez, NERC
Additional Comments Submitted by E. Skiba, Midwest ISO
Comments Submitted by M. Otondo, APS
Comments Submitted by WEQ BPS and NERC TLR
Comments Submitted by WEQ/WGQ BPS
Proposed 2009 Annual Plan with the WEQ Comments Included |
| January 14, 2009 |
WEQ EC Review Session Conference Call
With Web Conferencing
Single Topic Call: Wholesale draft recommendation for Measurement and Verification of Demand Response programs |
Agenda with Links to Work Papers |
Meeting Notes |
Comments Submitted by the NAESB Standards Review Subcommittee
Comments Submitted by A. Breidenbaugh, EnerNoc
Comments Submitted by the IRC SRC
Attachment to Comments Submitted by the IRC SRC
Comments Submitted by J. Cowan, EVO
Comments Submitted by J. Hughes, ELCON
Comments Submitted by E. Davis, Entergy
Attachment A to Comments Submitted by Entergy
Attachment B to Comments Submitted by Entergy
Comments Submitted by E. Futoryan, Con Edison
Comments Submitted by D. McGee, Southern Company Transmission
Comments Submitted by Townsley and Saxonis, NYS Department of Public Service
Comments Submitted by G. Smith, Energy Curtailment Specialists, Inc.
Late Comments Submitted by P. McCurley, National Rural Electric Cooperative Association (NRECA)
Presentation - NAESB Wholesale Electric Demand Response Measurement & Verification Standards - 1/14/09 |
| January 8, 2009 |
WEQ EC Task Force Session on Rollover Rights
Conference Call w/Web Conferencing |
Announcement |
Revised Meeting Notes
FERC Staff Response on Rollover Rights - Follow-up to 1-8-09 NAESB Conference Call |
2008 AP Item 2(a)(iv)(3), 3(a)(vii), and 6(l) - Part 2 Recommendation
Rollover of Redirects Discussion Items
Rollover of Redirects Discussion Items Revised 11/25/08
Monitoring Dial-In Information
Redirects and Rollover Rights: FERC Staff’s Interpretation of the OATT |
| December 1, 2008 |
WEQ EC Task Force Session on Rollover Rights
Conference Call w/Web Conferencing |
Announcement
Cancelled - to be Rescheduled |
|
2008 AP Item 2(a)(iv)(3), 3(a)(vii), and 6(l) - Part 2 Recommendation
Rollover of Redirects Discussion Items
Rollover of Redirects Discussion Items Revised 11/25/08
Monitoring Dial-In Information |
| November 25, 2008 |
WEQ EC Task Force Session on Rollover Rights - Prep Call for December 1, 2008
Conference Call |
Announcement |
Meeting Notes
Rollover of Redirects Discussion Items Revised 11/25/08 |
2008 AP Item 2(a)(iv)(3), 3(a)(vii), and 6(l) - Part 2 Recommendation
Rollover of Redirects Discussion Items |
November 4-6, 2008
Please note the WEQ meeting will be a 1 day meeting on November 4, 2008 |
Glen Allen, VA
Hosted by Dominion
With Web Conferencing |
Agenda
Meeting Announcement |
WEQ 11/04/08
Final Minutes
WEQ EC Notational Ballot Due November 26, 2008
Attachments to Minutes: WEQ EC Meeting Motions
Recommendations: 2008 WEQ Annual Plan Item 6.i/R06010 as approved by the WEQ EC - 11/04/08
2008 WEQ Annual Plan Item 3.a.vi.3/R05026 as approved by the WEQ EC - 11/04/08
2008 WEQ Annual Plan Item 3.a.i as approved by the WEQ EC - 11/04/08
2008 WEQ Annual Plan Item 6.j/R07001 as approved by the WEQ EC - 11/04/08
2008 WEQ Annual Plan Item 6.k/R07003 as approved by the WEQ EC - 11/04/08
2008 WEQ Annual Plan Item 6.f as approved by the WEQ EC - 11/04/08
2008 WEQ Annual Plan Item 6.g/R03031 &R03031 Revised as approved by the WEQ EC - 11/04/08
2008 WEQ Annual Plan Item 1.g/R03014 as approved by the WEQ EC - 11/04/08
2008 WEQ Annual Plan Item 1.f as approved by the WEQ EC - 11/04/08
2008 WEQ Annual Plan Item 1.a.ii as revised by the WEQ EC - 11/04/08 (Redline)
2008 WEQ Annual Plan Item 1.a.ii as revised by the WEQ EC - 11/04/08 (Clean)
2008 WEQ Annual Plan Item 2.a.iv.3,3.a.vii and 6.l as revised by the WEQ EC - 11/04/08 (Redline)
2008 WEQ Annual Plan Item 2.a.iv.3,3.a.vii and 6.l as revised by the WEQ EC - 11/04/08 (Clean)
Minor Corrections:Submitted by the NAESB Joint WEQ BPS and ESS/ITS Chairs and approved by the WEQ EC - 11/04/08
Minor Corrections:Submitted by B. Rehman, BPA and revised by the WEQ EC - 11/04/08 (Redline)
Minor Corrections:Submitted by B. Rehman, BPA and revised by the WEQ EC - 11/04/08 (Clean)
2008 WEQ Annual Plan (Redlined)
Retail 11/05/08
Final Minutes
Attachments to Minutes: Retail EC Meeting Motions
Minor Corrections approved by the Retail EC - 11/05/08
2008 Retail Annual Plan Update as approved by the Retail EC - 11/05/08 (Redline)
WGQ 11/06/08
Final Minutes
Attachments to Minutes: WGQ EC Meeting Motions
Recommendations as approved by the WGQ EC - 11/06/08: R04001
R04002
R04004
R04012
R04033/R05011/R05023/R05025/R05029
R04041
R06019
R07012
R96121-a23/R07011
R05028
R04024/R04039/R05024
R05003
R06013
R06017
R06018
R06020
R06021
R07006
R07016
R07017
R06023 as revised by the WGQ EC - 11/06/08 (Redline)
R06023 as revised by the WGQ EC - 11/06/08 (Clean)
2008 WGQ Annual Plan (Redlined) |
Nearby Hotels
Minor Correction Submitted by B. Rehman, Bonneville Power Administration
Minor Correction Submitted by Chairs, NAESB Joint WEQ BPS and ESS/ITS Subcommittees
Minor Correction #2 Submitted by B. Rehman, Bonneville Power Administration
Minor Correction Submitted by Co-chairs, in response to MOD review
Meeting Arrangements
WEQ SRS EC Update
WEQ BPS EC Update
WEQ TIMTF Update
Supplemental: Late Supplemental Comments on 2008 WEQ Annual Plan Item 6(b)/R07020 Submitted by C. Feagans, TVA
WEQ EC Meeting Materials Assembled
Supplemental: Agenda Cross Reference
Supplemental: Late supplemental/clarification to TVA's subject comments on 2008 WEQ Annual Plan Item 6(b)/R07020 Submitted by C. Feagans, TVA
Supplemental: WEQ ESS/ITS Subcommittee Update
Transcripts from the meeting can be ordered from Preferred Legal- 800-405-4056 |
| October 23, 2008 |
WEQ EC Conference Call
With Web Conferencing
Single Topic Call: CBM |
Agenda |
Final Minutes
WEQ EC Notational Ballot Due November 7, 2008
WEQ EC Notational Ballot Results
Attachments: Recommendation 2008 WEQ Annual Plan Item 2.b.iii.1-3 as revised by the WEQ EC on 10/23/2008 - (Redline)
Recommendation 2008 WEQ Annual Plan Item 2.b.iii.1-3 as revised by the WEQ EC on 10/23/2008 - (Clean)
Motions from Meeting - 10/23/2008 |
Recommendation 2008 WEQ Annual Plan Item 2.b.iii.1-3 - (Redline)
Recommendation 2008 WEQ Annual Plan Item 2.b.iii.1-3 - (Clean)
Comments Submitted by the NAESB Standards Review Subcommittee
Comments Submitted by C. Wesley, PJM
Transcripts from the meeting can be ordered from Jill Webb, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807 |
| October 6, 2008 |
WEQ EC Conference Call
With Web Conferencing
Single Topic Call: ATC Information List |
Agenda |
Final Minutes
WEQ EC Notational Ballot Due October 20, 2008
WEQ EC Notational Ballot Results
Attachments: Recommendation 2008 WEQ Annual Plan Item 2.c as revised by the WEQ EC on 10/06/2008 - (Redline) MOTION 1 Fails
Recommendation 2008 WEQ Annual Plan Item 2.c as revised by the WEQ EC on 10/06/2008 MOTION 2 Passes
Motions from Meeting - 10/06/2008 |
Transcripts from the meeting can be ordered from Preferred Legal- 800-405-4056
Recommendation 2008 WEQ Annual Plan Item 2.c - (Redline)
Recommendation 2008 WEQ Annual Plan Item 2.c - (Clean)
Comments Submitted by E. Davis, Entergy (Motion 1)
Comments Submitted by E. Davis, Entergy (Motion 1- Redline)
Comments Submitted by E. Davis, Entergy (Motion 2)
Comments Submitted by E. Davis, Entergy (Motion 2 - Redline)
Comments Submitted by A. Rodriquez, NERC Staff
Comments Submitted by the Co-Chairs of the NAESB WEQ BPS, ESS/ITS Subcommittees
Comments Submitted by the NAESB Standards Review Subcommittee
Comments Submitted by W. Weathers on behalf of Duke Energy and SRP
Comments Submitted by B. Green, EPSA
Comments Submitted by A. Johnson, NRG Energy
Comments Submitted by J. Donovan, Constellation Energy Resources
Comments Submitted by D. Kimm, MidAmerican Energy Company
Comments Submitted by M. Otondo, Arizona Public Service Company
Comments Submitted by D. McGee, Southern Company Transmission |
| September 30, 2008 |
WEQ EC Conference Call
With Web Conferencing
Single Topic Call: CBM |
Agenda
This call has been CANCELLED |
|
Transcripts from the meeting can be ordered from Preferred Legal- 800-405-4056
Recommendation 2008 WEQ Annual Plan Item 2.b.iii.1-3 - (Redline)
Recommendation 2008 WEQ Annual Plan Item 2.b.iii.1-3 - (Clean)
Comments Submitted by the NAESB Standards Review Subcommittee
Comments Submitted by C. Wesley, PJM |
| September 29, 2008 |
WEQ EC Review Session Conference Call
With Web Conferencing
Single Topic Call: ATC Information List |
Agenda |
Meeting Notes |
Recommendation 2008 WEQ Annual Plan Item 2.c - (Redline)
Recommendation 2008 WEQ Annual Plan Item 2.c - (Clean)
Comments Submitted by E. Davis, Entergy (Motion 1)
Comments Submitted by E. Davis, Entergy (Motion 1- Redline)
Comments Submitted by E. Davis, Entergy (Motion 2)
Comments Submitted by E. Davis, Entergy (Motion 2 - Redline)
Comments Submitted by A. Rodriquez, NERC Staff
Comments Submitted by the Co-Chairs of the NAESB WEQ BPS, ESS/ITS Subcommittees
Comments Submitted by the NAESB Standards Review Subcommittee
Comments Submitted by W. Weathers on behalf of Duke Energy and SRP
Comments Submitted by B. Green, EPSA
Comments Submitted by A. Johnson, NRG Energy
Comments Submitted by J. Donovan, Constellation Energy Resources
Comments Submitted by D. Kimm, MidAmerican Energy Company
Comments Submitted by M. Otondo, Arizona Public Service Company
Comments Submitted by D. McGee, Southern Company Transmission |
| September 26, 2008 |
WEQ EC Review Session Conference Call
With Web Conferencing
Single Topic Call: CBM |
Agenda |
Meeting Notes |
Recommendation 2008 WEQ Annual Plan Item 2.b.iii.1-3 - (Redline)
Recommendation 2008 WEQ Annual Plan Item 2.b.iii.1-3 - (Clean)
Comments Submitted by the NAESB Standards Review Subcommittee
Comments Submitted by C. Wesley, PJM |
August 19, 2008
Please note the WEQ meeting will be a 1 day meeting on August 19, 2008
the August 20 Retail EC meeting has been cancelled
and the August 21 WGQ EC meeting has been cancelled |
Colorado Springs, CO
Hosted by El Paso
With Web Conferencing |
WEQ EC Agenda |
WEQ 08/19/08
Final Minutes
Attachment: NAESB Order 890 Work Plan - August 19, 2008 - Redline
Attachment: NAESB Order 890 Work Plan - August 19, 2008 - Clean
Attachment: WEQ 2008 Annual Plan - 8/19/08 - Redline
Attachment: WEQ 2008 Annual Plan - 8/19/08 - Clean
Attachment: Recommendation 2008 WEQ Annual Plan Item 2(b)(v)(1) - Approved 08/19/08
Attachment: Recommendation 2008 WEQ Annual Plan Items 2(a)(iv)(4), 2(a)(vi)(4), 2(b)(ii)(1) as revised the the WEQ EC - Redline
Attachment: Recommendation 2008 WEQ Annual Plan Items 2(a)(iv)(4), 2(a)(vi)(4), 2(b)(ii)(1) as revised the the WEQ EC - Clean
Attachment: Recommendation 2008 WEQ Annual Plan Item 2(b)(i)(2) - Approved 8/19/08
Attachment: Recommendation 2008 WEQ Annual Plan Item 2(b)(ii)(2) as revised by the WEQ EC - 8/19/08 - Redline
Attachment: Recommendation 2008 WEQ Annual Plan Item 2(b)(ii)(2) as revised by the WEQ EC - Clean
Attachment: Recommendation 2008 WEQ Annual Plan Item 2(b)(vi) - Approved 08/19/08
Attachment: Recommendation 2008 WEQ Annual Plan item 3(a)(vi)(1) - Approved 8/19/08
Attachment: Recommendation 2008 WEQ Annual Plan Item 6(a)/R07019 as revised by the WEQ EC - 8/19/08 - Redline
Attachment: Recommendation 2008 WEQ Annual Plan Item 6(a)/R07019 as revised by the WEQ EC - 8-19-08 - Clean
Attachment: Recommendation 2008 WEQ Annual Plan Item 6(d) - Approved 8/19/08
| Minor Corrections to WEQ-001 Submitted by B. Rehman, BPA
Additional Minor Corrections to WEQ-001 Submitted by B. Rehman, BPA
Nearby Hotels
Minor Corrections to WEQ-002, WEQ-003, and WEQ-013 Submitted by P. Sorenson, OATI
WEQ ESS/ITS/BPS Update
WEQ SRS Update
WEQ BPS Update
WEQ SRS Request for Guidance on Provisional Item 5 - 7/25/08
WEQ EC Assembled Meeting Materials
Supplemental: Comments on 2008 Annual Plan Items 3.a.vi.1 and 2.b.i.2 Submitted by B. Green, EPSA
Supplemental: Proposed Changes to 5/13/08 WEQ EC Draft Minutes Submitted by B. Green, EPSA
Supplemental: Agenda Cross Reference
Transcripts from the meeting can be ordered from Jill Webb, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807 |
| August 14, 2008 |
WEQ EC Group Addressing the List of ATC related Information
Conference Call
With Web Conferencing |
Announcement/Agenda |
Meeting Notes |
NAESB ATC Information List for EC
Draft Revised Recommendation
Entergy Recommended Changes to Draft Recommendation - Submitted by E. Davis |
| August 8, 2008 |
WEQ EC Conference Call
With Web Conferencing
Single Topic Call: Continutation on Conditional Firm |
Meeting Announcement
Continuation of 7/31/08 Agenda |
Final Minutes
WEQ EC Notational Ballot Due August 15, 2008
Recommendation for 2008 WEQ AP Item 2.a.i.2/2008 WEQ AP Item 2.a.vii.1 as revised by the WEQ EC 8/8/08 (Redline)
Recommendation for 2008 WEQ AP Item 2.a.i.2/2008 WEQ AP Item 2.a.vii.1 as revised by the WEQ EC 8/8/08 (Clean)
EPSA Submission to NAESB EC
SPP Submission to NAESB EC
BPA Submission to NAESB EC
Entegra Submission to NAESB EC
ISO New England Submission to NAESB EC
Midwest ISO Submission to NAESB EC
Southern Comppany Submission to NAESB EC |
Transcripts from the meeting can be ordered from Jill Webb, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807
NAESB WEQ EC Motions - 07/31/08
Recommendation for 2008 WEQ AP Item 2.a.i.2/2008 WEQ AP Item 2.a.vii.1 as revised by the WEQ EC 07/31/08 (Redline)
Recommendation for 2008 WEQ AP Item 2.a.i.2/2008 WEQ AP Item 2.a.vii.1 as revised by the WEQ EC 07/31/08 (Clean)
WEQ EC Conforming Changes |
| July 31, 2008 |
WEQ EC Conference Call
With Web Conferencing
Single Topic Call: Conditional Firm |
Agenda |
Final Minutes
WEQ EC Notational Ballot Due July 30, 2008
Attachment: NAESB WEQ EC Motions - 07/31/08
Attachment: Recommendation for 2008 WEQ AP Item 2.a.i.2/2008 WEQ AP Item 2.a.vii.1 as revised by the WEQ EC 07/31/08 (Redline)
Attachment: Recommendation for 2008 WEQ AP Item 2.a.i.2/2008 WEQ AP Item 2.a.vii.1 as revised by the WEQ EC 07/31/08 (Clean)
| Recommendation for 2008 WEQ Annual Plan Item 2.a.i.2 2008 WEQ Annual Plan Item 2.a.vii.1
Comments Submitted by P. Sorenson, OATI
Additional Comments Submitted by P. Sorenson, OATI
Comments Submitted by B. Rehman, BPA
Request for Comments due July 25, 2008
Conditional Firm Motions
Conditional Firm Parking Lot of Issues
6/24/08 Draft Minutes of ESS/ITS Subcommittee Meeting minutes where recommendation was voted out
NAESB Request to FERC for an Extension
FERC Granting NAESB an Extension
Comments Submitted by D. McGee, Southern
Comments Submitted by the NAESB Standards Review Subcommittee
Comments Submitted by C. Yeung on behalf of PJM, MISO and SPP
Comments Submitted by B. Green, EPSA
Comments Submitted by C. Wesley, PJM
Comments Submitted by D. Kimm, MidAmerican Energy
Comments Submitted by N. McIntire, American Wind Energy Association
Comments Submitted by W. Weathers, SRP
Comments Submitted by N. Saini, Entergy
Combination of all the Comments into the Conditional Firm Recommendation
Transcripts from the meeting can be ordered from Jill Webb, CSR - 1803 Rustic Oak Ln, Seabrook, Texas 77586, 281-853-6807 |
| July 21, 2008 |
WEQ EC Review Session Conference Call
With Web Conferencing
Single Topic Call: Conditional Firm |
Agenda |
Meeting Notes |
Recommendation for 2008 WEQ Annual Plan Item 2.a.i.2 2008 WEQ Annual Plan Item 2.a.vii.1
Comments Submitted by P. Sorenson, OATI
Additional Comments Submitted by P. Sorenson, OATI
Comments Submitted by B. Rehman, BPA
Request for Comments due July 25, 2008
Conditional Firm Motions
Conditional Firm Parking Lot of Issues
6/24/08 Draft Minutes of ESS/ITS Subcommittee Meeting minutes where recommendation was voted out
NAESB Request to FERC for an Extension
FERC Granting NAESB an Extension |
| July 18, 2008 |
WEQ EC Group Addressing the List of ATC related Information
Conference Call
With Web Conferencing |
Announcement/Agenda |
Meeting Notes
ATC Information List Recommendation Draft 7/18/08
| ATC Information List Recommendation Draft 6/16/08 |
| June 6, 2008 |
WEQ EC Group Addressing the List of ATC related Information
Conference Call
With Web Conferencing |
Announcement
Agenda |
Meeting Notes
ATC Information List Recommendation Draft 6/16/08 |
Order 890 Analysis
Current ATC List
Recommendation 2008 AP 2.b.v.2 |
May 13-15, 2008
Please note the WEQ meeting will be a 1 day meeting on May 13, 2008 |
Washington, DC
Hosted by the AGA
With Web Conferencing |
Agenda |
WEQ EC Notational Ballot Due May 12, 2008
WEQ 05/13/08
Final Minutes
Attachment: WEQ 2008 Annual Plan - Redlined Draft 5/13/08
Attachment: Recommendation R03017/2008 Annual Plan Items 1.c.i-ii approved by the WEQ EC on May 13, 2008
Attachment: Recommendation 2008 WEQ Annual Plan 2.b.v.2 approved by the WEQ EC on May 14, 2008
Attachment: Recommendation 2008 WEQ Annual Plan Items 2.b.iv.1-3 approved by the WEQ EC on May 13, 2008
Attachment: Recommendation 2008 WEQ Annual Plan Items 2.a.i.5, 2.a.i.6, 2.a.ii.1-3 as revised by the WEQ EC on May 13, 2008 (Redline)
Attachment: Recommendation 2008 WEQ Annual Plan Items 2.a.i.5, 2.a.i.6, 2.a.ii.1-3 as revised by the WEQ EC on May 13, 2008 (Clean)
Retail 05/14/08
Final Minutes
Attachment: Recommendation R05016 as approved by the REQ/RGQ EC on May 14, 2008
Attachment: Recommendation 2007 Retail Annual Plan Item 9 as approved by the REQ/RGQ EC on May 14, 2008
Attachment: Recommendation 2008 Retail Annual Plan Item 3(i), (ii), and (iii) approved as revised by the REQ/RGQ EC on May 14, 2008 (Redline)
Attachment: Recommendation 2008 Retail Annual Plan Item 3(i), (ii), and (iii) approved as revised by the REQ/RGQ EC on May 14, 2008 (Clean)
Attachment: Recommendation 2008 Retail Annual Plan Item 3(i), (ii), and (iii) - Attachment approved by the REQ/RGQ EC on May 14, 2008
Attachment: Retail 2008 Annual Plan - Redlined Draft 05/14/08
WGQ 05/15/08
Final Minutes
Attachment: Recommendation R05005 approved by the WGQ EC on May 15, 2008
Attachment: Recommendation WGQ 2007 Annual Plan Item 3 approved as revised by the WGQ EC on May 15, 2008 (Redline)
Attachment: Recommendation WGQ 2007 Annual Plan Item 3 approved as revised by the WGQ EC on May 15, 2008 (Clean)
Attachment: Recommendation WGQ 2007 Annual Plan Item 7b/WGQ 2008 Annual Plan Item 4b approved by the WGQ EC on May 15, 2008
Attachment: Recommendation C07003 and supporting documents approved as revised by the WGQ EC on May 15, 2008 (Redline)
Attachment: Recommendation C07003 and supporting documents approved as revised by the WGQ EC on May 15, 2008 (Clean)
Attachment: Recommendation C07002 approved as revised by the WGQ EC on May 15, 2008 (Redline)
Attachment: Recommendation C07002 approved as revised by the WGQ EC on May 15, 2008 (Clean)
Attachment: Minor Correction to WGQ Interpretation 7.3.16 approved by the WGQ EC on May 15, 2008
Attachment: Recommendation WGQ 2007 Annual Plan Item 7a/WGQ 2008 Annual Plan Item 4a (Redlines from WGQ EC Meeting - 05/15/08 to be considered at a subsequent meeting) |
Meeting Arrangements
Proposed Changes to the WEQ 2008 Annual Plan the WEQ ESS/ITS/BPS and SRS Subcommittees
Transcripts from the meeting can be ordered from Ace Federal Reporters - 202-347-3700
WEQ EC Book
Retail EC Book
WGQ EC Book
Supplemental: Suggested Changes to 2/29/08 Joint WEQ/WGQ EC Minutes Submitted by D. Davis, Williams Gas Pipeline - Redline
Supplemental: Commissioner Wellinghoff Concurring Letter on Docket No. RM05-5-005 - Acting on NAESB WEQ Version 1 Standards
Supplemental: NERC/NAESB Definition Comparison - April 30, 2008
Supplemental: Proposed Motions for WEQ-001 Submitted by P. Sorenson, OATI
Supplemental: Joint WEQ ESS/ITS/BPS Update
Supplemental: WEQ SRS Update
Supplemental: WEQ BPS Update |
| April 24, 2008 |
WEQ EC Conference Call
With Web Conferencing
Single Topic Call: ATC Information Link |
Agenda |
Notational Ballot Due April 23, 2008
Final Minutes
Motions Made During the WEQ EC Meeting on the ATC Information Link Recommendation
Recommendation for 2008 WEQ Annual Plan Item 2.b.vii - WEQ-001 changes for “ATC Information Link” on OASIS and TTC and ATC methodologies and values - as revised by the WEQ EC 04/24/2008 (Redline)
Recommendation for 2008 WEQ Annual Plan Item 2.b.vii - WEQ-001 changes for “ATC Information Link” on OASIS and TTC and ATC methodologies and values - as revised by the WEQ EC 04/24/2008 (Clean)
Notational Ballot Due May 2, 2008 |
Transcripts from the meeting can be ordered from Preferred Legal- 800-405-4056
Recommendation for 2008 WEQ Annual Plan Item 2.b.vii - WEQ-001 changes for “ATC Information Link” on OASIS and TTC and ATC methodologies and values - Clean
Recommendation for 2008 WEQ Annual Plan Item 2.b.vii - WEQ-001 changes for “ATC Information Link” on OASIS and TTC and ATC methodologies and values - Redline
Comments Submitted by D. Danis, Constellation Energy Commodities Group
Comments Submitted by B. Green, EPSA
Comments Submitted by the NAESB WEQ Standards Review Subcommittee
WEQ ESS/ITS/BPS Motions
Motions Document Submitted by B. Green, EPSA |
| April 22, 2008 |
WEQ EC Review Session Conference Call
With Web Conferencing
Single Topic Call: ATC Information Link |
Agenda |
Meeting Notes |
Recommendation for 2008 WEQ Annual Plan Item 2.b.vii - WEQ-001 changes for “ATC Information Link” on OASIS and TTC and ATC methodologies and values - Clean
Recommendation for 2008 WEQ Annual Plan Item 2.b.vii - WEQ-001 changes for “ATC Information Link” on OASIS and TTC and ATC methodologies and values - Redline
Comments Submitted by D. Danis, Constellation Energy Commodities Group
Comments Submitted by B. Green, EPSA
Comments Submitted by the NAESB WEQ Standards Review Subcommittee |
| April 18, 2008 |
WEQ EC Conference Call
With Web Conferencing
Single Topic Call: Load Forecasts |
Agenda |
Notational Ballot Due April 17, 2008
Final Minutes
Recommendation for 2008 WEQ Annual Plan Item 2.a.i.4, 2.b.v.4, and 2.b.v.5 - Load Forecast and Actual Load Business Practice Standards associated with S&CP changes - as Revised by the WEQ EC on April 18, 2008 - Clean
Recommendation for 2008 WEQ Annual Plan Item 2.a.i.4, 2.b.v.4, and 2.b.v.5 - Load Forecast and Actual Load Business Practice Standards associated with S&CP changes - as Revised by the WEQ EC on April 18, 2008 - Redline
Motions Made During the WEQ EC Conference Call on Load Forecast Recommendation
Notational Ballot Due April 23, 2008 |
Transcripts from the meeting can be ordered from Preferred Legal- 800-405-4056
Recommendation for 2008 WEQ Annual Plan Item 2.a.i.4, 2.b.v.4 and 2.b.v.5 - Load Forecast and Actual Load Business Practice Standards associated with S&CP changes - Clean
Recommendation for 2008 WEQ Annual Plan Item 2.a.i.4, 2.b.v.4 and 2.b.v.5 - Load Forecast and Actual Load Business Practice Standards associated with S&CP changes - Redline
Comments Submitted by P. Sorenson, OATI
Comments Submitted by B. Green, EPSA
Comments Submitted by B. Rehman, BPA
Comments Submitted by L. Wang, Midwest ISO
Comments Submitted by W. Weathers, SRP
WEQ ESS/ITS/BPS Motions |
| April 9, 2008 |
WEQ EC Conference Call
With Web Conferencing
Single Topic Call: ATC Narratives |
Agenda |
Final Minutes
Notational Ballot Due April 8, 2008
Recommendation for 2008 WEQ Annual Plan Item 2.b.v.3 and 2008 WEQ Annual Plan Item 2.a.i.3 - ATC/TTC Narratives - as Revised by the WEQ EC on April 9, 2008 - Redline
Recommendation for 2008 WEQ Annual Plan Item 2.b.v.3 and 2008 WEQ Annual Plan Item 2.a.i.3 - ATC/TTC Narratives - as Revised by the WEQ EC on April 9, 2008 - Clean
Motions Made During the WEQ EC Conference Call on ATC Narratives and Results
Notational Ballot Due April 14, 2008 |
Transcripts from the meeting can be ordered from Preferred Legal- 800-405-4056
Recommendation for 2008 WEQ Annual Plan Item 2.b.v.3 and 2008 WEQ Annual Plan Item 2.a.i.3 - ATC/TTC Narratives - Clean
Recommendation for 2008 WEQ Annual Plan Item 2.b.v.3 and 2008 WEQ Annual Plan Item 2.a.i.3 - ATC/TTC Narratives - Redline
Comments Submitted by B. Green, EPSA
Comments Submitted by JT Wood, Southern Company
Comments Submitted by J. Harmon, Midwest ISO
Comments Submitted by the NAESB WEQ Standards Review Subcommittee
Late Comments Submitted by the P. Brown, PJM
Late Comments Submitted by the B. Rehman, BPA |
| April 8, 2008 |
WEQ EC Review Session Conference Call
With Web Conferencing
Single Topic Call: Load Forecasts |
Agenda |
Meeting Notes |
Recommendation for 2008 WEQ Annual Plan Item 2.a.i.4, 2.b.v.4 and 2.b.v.5 - Load Forecast and Actual Load Business Practice Standards associated with S&CP changes - Clean
Recommendation for 2008 WEQ Annual Plan Item 2.a.i.4, 2.b.v.4 and 2.b.v.5 - Load Forecast and Actual Load Business Practice Standards associated with S&CP changes - Redline
Comments Submitted by P. Sorenson, OATI
Comments Submitted by B. Green, EPSA |
| April 2, 2008 |
WEQ EC Review Session Conference Call
With Web Conferencing
Single Topic Call: ATC Narratives |
Agenda |
Meeting Notes |
Recommendation for 2008 WEQ Annual Plan Item 2.b.v.3 and 2008 WEQ Annual Plan Item 2.a.i.3 - ATC/TTC Narratives - Clean
Recommendation for 2008 WEQ Annual Plan Item 2.b.v.3 and 2008 WEQ Annual Plan Item 2.a.i.3 - ATC/TTC Narratives - Redline
Comments Submitted by B. Green, EPSA
Comments Submitted by JT Wood, Southern Company
Comments Submitted by J. Harmon, Midwest ISO
Comments Submitted by the NAESB WEQ Standards Review Subcommittee
Late Comments Submitted by the P. Brown, PJM
Late Comments Submitted by the B. Rehman, BPA |
| March 20, 2008 |
WEQ EC Notational Ballot
Due April 3, 2008 |
|
Results |
WEQ EC Notational Ballot Due April 3, 2008
Minor Correction |
| February 29, 2008 |
Joint WEQ/WGQ EC Meeting
Houston, TX
Held at the Magnolia Hotel
With Web Conferencing |
Agenda |
WEQ/WGQ EC Notational Ballot
Final Minutes
eTariff Recommendation as adopted by the WGQ/WEQ Executive Committees Feb. 29, 2008
Attachment to eTariff Recommendation as revised and adopted by the WGQ/WEQ Executive Committees Feb. 29, 2008 - (Redline)
Attachment to eTariff Recommendation as revised and adopted by the WGQ/WEQ Executive Committees Feb. 29, 2008 - (Clean)
Voting Record
NAESB Appreciation Letter |
Nearby Hotels
Transcripts from the meeting can be ordered from Preferred Legal- 800-405-4056
Comments Submitted by L. Morrison, ISO New England
Comments Submitted by eTariff Chairs
Attachment to Chair’s Comments
eTariff Recommendation
eTariff Recommendation Attachment
Comments Submitted by M. McCain, Spectra Energy
Comments on Shared Tariff Filing Issue by New England Participating Transmission Owners
Comments Submitted by P. Brown, PJM
Cover Letter to Comments Submitted by the ISO Group
Comments Submitted by the ISO Group
Comments Submitted by H. Bartholomot, EEI
Comments Submitted by D. Mihalik, AOPL
Comments Submitted by M. Regulinski, Dominion Resources Services
eTariff Voting Record from January 23-25, 2008 Meeting |
| February 4-7, 2008 |
Houston, TX
Held at the NAESB Offices 13th Floor San Jacinto Room
With Web Conferencing |
WEQ EC Agenda - Corrected
WEQ EC Agenda with Links
Cancelled - Retail EC Meeting Feb. 6, 2008
Retail Cancellation Announcement
Cancelled - WGQ EC Meeting Feb. 7, 2008
WGQ Cancellation Announcement |
WEQ 02/4-5/08
Final Minutes
Attachment: 2008 WEQ Annual Plan Item 2(i)7 Recommendation Attachment (Appendix C) as revised by the WEQ EC on Feb. 5, 2008
Attachment: WEQ EC Recommendations to WEQ BPS/ESS/ITS
Attachment: WEQ 2008 Annual Plan - Redlined Revised Draft 3/14/08 |
Nearby Hotels
Version 001 Minor Corrections, Submitted by E. SKiba
Minor Correction for Final Action, Submitted by P. Sorenson and G. Gilbert
Minor Correction for Final Action, Submitted by J.T. Wood
WEQ EC Book
Transcripts from the meeting can be ordered from Preferred Legal- 800-405-4056
Supplemental Material 2008 WEQ Executive Committee Alternates
Supplemental Material WEQ EC November 6, 2008 Revised Draft Minutes
WEQ EC Agenda Cross Reference to Meeting Material
Supplemental Material eTariff Chairs Comments
Supplemental Material Powers and Duties of Subcommittee and Task Force Chairs
Supplemental Material WEQ SRS EC Update Presentation
Supplemental Material WEQ ESS/ITS/BPS EC Update Presentation
Supplemental Material WEQ BPS and NERC TLR EC Update Presentation
Supplemental Material Board Business, EC Business, Subcommittee Business Presentation by B. Boswell, NAESB General Counsel
Supplemental Material Attachment to Chair’s Comments |
| January 2, 2008 |
WEQ EC Notational Ballot
Due January 16, 2008 |
|
Results
| WEQ EC Notational Ballot Due January 16, 2008 |
| November 6-8, 2007 |
Houston, TX
Held at the NAESB Offices 13th Floor San Jacinto Room
With Web Conferencing |
Announcement
Corrected WEQ EC Agenda |
WEQ 11/6/07
Final Minutes
WEQ EC Notational Ballot due November 5, 2007
2007 WEQ Annual Plan Item 2(ii) - Order 890 Work Plan Group 1: Conditional Firm, Annotations For ATC; Load Forecast And Actual Load; Re-Bid Of Partial Service; And Preconfirmation Priority - Attachment to Recommendation 1 - OASIS S&CPs (WEQ 002) as revised by the WEQ EC on 11/6/07 – redline
2007 WEQ Annual Plan Item 2(ii) - Order 890 Work Plan Group 1: Conditional Firm, Annotations For ATC; Load Forecast And Actual Load; Re-Bid Of Partial Service; And Preconfirmation Priority - Attachment to Recommendation 1 - OASIS S&CPs (WEQ 002) as revised by the WEQ EC on 11/6/07 – clean
2007 WEQ Annual Plan Item 2(ii) - Order 890 Work Plan Group 1: Conditional Firm, Annotations For ATC; Load Forecast And Actual Load; Re-Bid Of Partial Service; And Preconfirmation Priority - Attachment to Recommendation 2 - OASIS Data Dictionary (WEQ 003) as revised by the WEQ EC on 11/6/07 – redline
2007 WEQ Annual Plan Item 2(ii) - Order 890 Work Plan Group 1: Conditional Firm, Annotations For ATC; Load Forecast And Actual Load; Re-Bid Of Partial Service; And Preconfirmation Priority - Attachment to Recommendation 2 - OASIS Data Dictionary (WEQ 003) as revised by the WEQ EC on 11/6/07 – clean
2007 WEQ Annual Plan Item 2(ii) - Order 890 Work Plan Group 1: Conditional Firm, Annotations For ATC; Load Forecast And Actual Load; Re-Bid Of Partial Service; And Preconfirmation Priority - Attachment to Recommendation 3 - Implementation Guide (WEQ 013) as revised by the WEQ EC on 11/6/07 – redline
2007 WEQ Annual Plan Item 2(ii) - Order 890 Work Plan Group 1: Conditional Firm, Annotations For ATC; Load Forecast And Actual Load; Re-Bid Of Partial Service; And Preconfirmation Priority - Attachment to Recommendation 3 - Implementation Guide (WEQ 013) as revised by the WEQ EC on 11/6/07 – clean
Retail 11/7/07
Final Minutes
Attachment - Retail 2007 Annual Plan 11/7/07 (Redline)
Attachment - Retail 2008 Annual Plan 11/7/07 (Redline)
WGQ 11/8/07
Final Minutes
Attachment - WGQ 2008 Annual Plan 11/8/07 (Redline)
Attachment - WGQ 2007 Annual Plan 11/8/07 (Redline) |
Redlined WEQ EC 8/14/07 Draft Minutes Submitted by E.Davis, Entergy
Nearby Hotels
Transcripts from the meeting can be ordered from Preferred Legal- 800-405-4056
Supplemental Material - Comments on WEQ 2007 Annual Plan Item 2(c) Submitted by J.Dison, Southern Company Generation
Late Comments on WEQ 2008 Annual Plan Submitted by B. Rehman, BPA
WEQ EC Book
Retail EC Book
WGQ EC Book
Supplemental Material - Comments on WEQ Recommendation - 2007 WEQ Annual Plan Item 2(ii) Submitted by E. Skiba, MISO
Supplemental Material - Comments on C07001 Submitted by E. Skiba, MISO
Supplemental Material - Comments on WEQ Recommendation - 2007 WEQ Annual Plan Item 2(ii) Submitted by JT Wood, Southern Company
Supplemental Material - Late Comments on WEQ Recommendation - 2007 WEQ Annual Plan Item 2(ii) Submitted by P. Sorenson, OATI
Supplemental Material - Comments on WEQ Recommendation - 2007 WEQ Annual Plan Item 2(ii) Submitted ESS/ITS
Supplemental Material - Attachment 1 to the ESS/ITS Comments – OASIS Standards & Communication Protocols (WEQ-002) revised to incorporate the minor corrections
Supplemental Material - Attachment 2 to the ESS/ITS Comments – OASIS Data Dictionary (WEQ-003) revised to incorporate the minor corrections
Supplemental Material - Attachment 3 to the ESS/ITS Comments – OASIS Implementation Guide (WEQ-013) revised to incorporate the minor corrections
Supplemental Material - JISWG Comments on R07013
Supplemental Material - JISWG 2008 Work Plan
Supplemental Material - WEQ Minor Correction - Regarding Corrections to Final Action R07002 - Data Dictionary (WEQ-003)
WEQ EC Agenda Cross Reference to Meeting Material
Supplemental Material - ESS/ITS and BPS response to Williams Power Comments
Supplemental Material - ESS/ITS and BPS response to MISO Comments
Supplemental Material - ESS/ITS and BPS response to EPSA Comments
Supplemental Material - ESS/ITS and BPS response to Southern Company Comments
Supplemental Material - ESS/ITS and BPS response to PJM Comments
Supplemental Material - ESS/ITS and BPS response to SPP Comments |
| October 17, 2007 |
WEQ EC Notational Ballot
Due October 31, 2007 |
|
Results |
WEQ EC Notational Ballot Due October 31, 2007
Transmission Loading Relief Business Practices – Eastern Interconnection
Memo regarding Minor Corrections to the WEQ TLR business practice standards |
| October 15, 2007 |
WEQ EC Conference Call
With Web Conferencing |
Agenda |
WEQ Notational Ballot due 10/14/07
Final Minutes
Resulting Minor Correction to NAESB WEQ-009 Standards of Conduct
Recommendation for 2006 WEQ AP Item 3(c) - Revised by the WEQ EC on 10/15/2007 (Redline)
Recommendation for 2006 WEQ AP Item 3(c) - Revised by the WEQ EC on 10/15/2007 (Clean) |
Recommendation for 2006 WEQ AP Item 3(c)
Comments Submitted by R.Mucci, Williams Power
Comments Submitted by E.Davis, Entergy Services
Comments Submitted by E.Skiba, Midwest ISO
FERC’s current part 358 Standards of Conduct |
| September 21, 2007 |
WEQ EC Notational Ballot
Due October 5, 2007 |
|
Results |
WEQ EC Notational Ballot Due October 5, 2007
Minor Correction Memo Regarding Corrections to Final Action R07002 |
| September 19, 2007 |
WEQ EC Notational Ballot
Due October 3, 2007 |
|
Results |
WEQ EC Notational Ballot Due October 3, 2007
Minor Correction Memo Regarding Corrections to Final Action R07002 – Attachment 1 - S&CPs (WEQ 002)
Proposed Minor Corrections to Attachment 1 – S&CPs (WEQ 002)
Minor Correction Memo Regarding Corrections to Final Action R07002 – Attachment 2 – Data Dictionary (WEQ 003)
Proposed Minor Corrections to Attachment 2 – Data Dictionary (WEQ 003)
Minor Correction Memo Regarding Corrections to Final Action R07002 – Attachment 3 – Implementation Guide (WEQ 013)
Proposed Minor Corrections to Attachment 3 – Implementation Guide (WEQ 013) |
| August 17, 2007 |
WEQ EC Notational Ballot
Due August 31, 2007 |
|
Results |
WEQ EC Notational Ballot Due August 31, 2007 |
| August 14, 2007 |
Colorado Springs, CO
Hosted by El Paso Western Pipelines |
Agenda
The WGQ and Retail ECs will not meet in Colorado Springs |
Final Minutes
Attachment- Recommendation R06025 - Revised By WEQ Executive Committee on 08/14/2007 - Clean
Attachment- Recommendation R06025 - Revised By WEQ Executive Committee on 08/14/2007 - Redline
Attachment- WEQ 2007 Annual Plan 08/14/2007 (Redline)
Attachment- Recommendation on WEQ 2006 Annual Plan Item 3(c) |
Nearby Hotels
WEQ EC Meeting Material
Draft Minutes from the July 20, 2007 WEQ EC Meeting reflecting redlined corrections identified by V. Crockett, TVA
Draft Minutes from the May 8, 2007 WEQ EC Meeting reflecting redlined corrections identified by V. Crockett, TVA
Agenda Cross Reference to Meeting Material
Supplemental Material - JISWG Response to Comments on Conditional Design Posting
Supplemental Material - NAESB Triage Actions Pending for R07008-R07011 - Corrected
Transcripts from the meeting can be ordered from Court Reporter's Clearinghouse - 713-626-2629 |
| July 27, 2007 |
WEQ EC Notational Ballot
Due August 10, 2007 |
|
Results |
WEQ EC Notational Ballot Due August 10, 2007 |
| July 20, 2007 |
WEQ EC Meeting
Conference Call |
Agenda |
Final Minutes
Attachment- Recommendation R05018 - Revised By WEQ Executive Committee on 07/20/2007 - Clean
Attachment- Recommendation R05018 - Revised By WEQ Executive Committee on 07/20/2007 - Redline
Attachment- Recommendation R06025 - Revised By WEQ Executive Committee on 07/20/2007 - Clean
Attachment- Recommendation R06025 - Revised By WEQ Executive Committee on 07/20/2007 - Redline
Attachment- Recommendation R07005 - Revised By WEQ Executive Committee on 07/20/2007 - Clean
Attachment- Recommendation R07005 - Revised By WEQ Executive Committee on 07/20/2007 - Redline
Attachment- Recommendation R07002 - Revised By WEQ Executive Committee on 07/20/2007 - Clean
Attachment- Recommendation R07002 - Revised By WEQ Executive Committee on 07/20/2007 - Redline
Attachment 1 to Recommendation R07002 – revised by WEQ Executive Committee on 07/20//2007 – Redlined to include references corrected
Attachment 1 to Recommendation R07002 – revised by WEQ Executive Committee on 07/20/2007 – With redline changes to correct references accepted only
Attachment 2 to Recommendation R07002 – reviewed by WEQ Executive Committee on 07/20//2007 – (no references needed to be corrected)
Attachment 3 to Recommendation R07002 – revised by WEQ Executive Committee on 07/20/2007 – Redline
Attachment 3 to Recommendation R07002 – revised by WEQ Executive Committee on 07/20/2007 – Clean |
Transcripts from the meeting can be ordered from Court Reporter's Clearinghouse - 713-626-2629
Notational Ballot due by 8:00am (Central) on July 20, 2007
Recommendation R05018
Recommendation R06025
Recommendation R06026/2007 AP Item 1(b)
Attachment to Recommendation R06026/2007 AP Item 1(b)
Recommendation R07002
Attachment 1 to Recommendation R07002
Attachment 2 to Recommendation R07002
Attachment 3 to Recommendation R07002
Recommendation R07005
Comments on Recommendation R05018 Submitted by A. Scott, Tenaska Power Services Co.
Comments on Recommendation R07002 Submitted by E. Skiba, Midwest ISO
Comments on Recommendation R06025 Submitted by S. Monzon, PJM Interconnection
Comments on Recommendation R07005 and R05018 Submitted by E. Skiba, Midwest ISO |
| May 8-10, 2007 |
Washington, DC
Hosted by the AGA |
Agendas (Revised Retail Agenda) |
WEQ 5/8/07
WEQ Notational Ballot Due May 7, 2007
Final Minutes
Attachment - Revision to Final Action R04006D to align the Resales Standards with Order 890 - Redline
Attachment - Voting Results
Attachment - Revision to Final Action R04006D to align the Resales Standards with Order 890 - Clean
Retail 5/9/07
Retail Notational Ballot Due May 8, 2007
Final Minutes
Attachment - Retail 2007 Annual Plan 5/9/07 - (Redline)
WGQ 5/10/07
WGQ Notational Ballot Due May 9, 2007
Attachment - WGQ 2007 Annual Plan 5/10/07 - (Redline)
Attachment - Recommendation R06008 as revised by the WGQ Executive Committee on 5/10/07
Final Minutes
Attachment - WGQ 2007 Anual Plan Item 6 as revised by the WGQ Executive Committee - redline
Attachment - WGQ 2007 Anual Plan Item 6 as revised by the WGQ Executive Committee - clean
Attachment - Recommendation R06008 as revised by the WGQ Executive Committee - redline
Attachment - Recommendation R06008 as revised by the WGQ Executive Committee - clean |
Nearby Hotels
High Demand Dates for Washington D.C. Hotels
EC Meeting Material Applicable to All Quadrants
EC Meeting Material Applicable to WEQ
EC Meeting Material Applicable to Retail
EC Meeting Material Applicable to WGQ
Supplemental Material: Comments Sumbitted by M.Mitchell, SRP
Supplemental Material: Comments Submitted by N.Saini, Entergy
Supplemental Material: Minor Correction - NAESB TLR Business Practice Standard
Supplemental Material: Minor Correction Attachment - (Redline) NAESB TLR Business Practice Standard
Supplemental Material: Comments Submitted by E. Skiba, MISO
EC Meeting Cross Reference
Supplemental Material: Comments Submitted by J.T. Wood, Southern Company
Supplemental Material: Comments Submitted by B. Rehman, Bonneville Power Administration
Transcripts from the meeting can be ordered from Ace Federal Reporters - 202-347-3700 |
| February 20, 2007 |
WEQ EC Notational Ballot
Due March 6, 2007 |
|
|
WEQ EC Notational Ballot Due March 6, 2007 |
| February 6-7, 2007 |
Houston, TX
Held at the NAESB Offices
13th Floor San Jacinto Room |
Agendas |
WEQ 2/6/07
WEQ Notational Ballot Due February 5, 2007
Final Minutes
Attachment - WEQ 2007 Annual Plan 2/6/07 - (Redline)
Attachment - Recommendation R04006C1 as revised by WEQ EC on 02/06/07 - (Redline)
Attachment - Recommendation R04006C1 as revised by WEQ EC on 02/06/07 - (Clean)
Joint Retail 2/7/07
Retail Notational Ballot Due February 6, 2007
Final Minutes
Attachment - Retail 2007 Annual Plan 2/7/07 - (Redline) |
Nearby Hotels
Transcripts from the meeting can be ordered from Court Reporter's Clearinghouse - 713-626-2629
EC Meeting Material Applicable to All Quadrants
EC Meeting Material Applicable to WEQ
EC Meeting Material Applicable to Retail
Supplemental Material: WEQ ESS/ITS January 9-10, 2007 Final Minutes
Supplemental Material: Background e-Tariff Information
EC Meeting Cross Reference |
| December 19, 2006 |
WEQ EC Meeting
Conference Call |
Agenda |
Final Minutes
Recommendation WEQ 2006 Annual Plan Item 3 (b)(iii)/R03007 - Clean - as Revised by the WEQ EC on 12/19/06
Recommendation WEQ 2006 Annual Plan Item 3 (b)(iii)/R03007 - Redlined - as Revised by the WEQ EC on 12/19/06
WEQ Notational Ballot Due January 2, 2007 |
Recommendation R03007
Late Comments submitted by IETF
Transcripts from the meeting can be ordered from Court Reporter's Clearinghouse - 713-626-2629 |
| November 14-16, 2006 |
EC Meetings
Dallas, TX
Hosted by TXU |
Agendas |
WEQ 11/14/06
Final Minutes
Attachment - 2006 WEQ Annual Plan 11/14/06 - (Redline)
Attachment - 2007 WEQ Annual Plan
Joint Retail 11/15/06
Retail Notational Ballot Due November 15, 2006
Final Minutes
Attachment - Retail 2006 Annual Plan 11/15/06 - (Redline)
Attachment - Recommendation R05013
Attachment - R05013 Attachment 1 / Appendix A as revised by the Retail Executive Committees on 11/15/06
Attachment - R05013 Attachment 2 / Appendix B
Attachment - 2007 Retail Annual Plan
WGQ 11/16/06
WGQ Notational Ballot Due November 16, 2006
Final Minutes
Attachment - 2006 WGQ Annual Plan 11/16/06 - (Redline)
Attachment - 2007 WGQ Annual Plan |
Nearby Hotels
Transcripts from the meeting can be ordered from Court Reporter's Clearinghouse - 713-626-2629
EC Meeting Material Applicable to all Quadrants
EC Meeting Cross Reference
Supplemental Material:
Comments on WEQ 2007 Annual Plan Submitted by B. Rehman, Bonneville Power Administration - 11/13/06
Revision to Comments on WEQ 2007 Annual Plan Submitted by B. Rehman, Bonneville Power Administration - 11/13/06 |
| September 5, 2006 |
WEQ EC Notational Ballot
Due September 19, 2006 |
|
|
WEQ Minor Correction for WEQBPS-006 Manual Time Error Correction
WEQ EC Notational Ballot Due September 19, 2006 |
| August 15-17, 2006 |
EC Meetings
Colorado Springs, CO
Hosted by El Paso Western Pipelines |
Revised Agendas |
Notational Ballot
WEQ 8/15/06
Final Minutes
WEQ Notational Ballot Due August 25, 2006
WEQ 2006 Annual Plan (Redline - 8/15/06
Recommendation R04006D - Redline - Revised by the WEQ EC 8/15/06
Recommendation R04006D - Clean - Revised by the WEQ EC 8/15/06
Recommendation R04036 - Revised by the WEQ EC 8/15/06
Recommendation AP Item 3ci - Clean - Revised by the WEQ EC 8/15/06
Recommendation AP Item 3ci - Redline - Revised by the WEQ EC 8/15/06
Joint Retail 8/16/06
Final Minutes
Retail 2006 Annual Plan (Redline - 8/16/06
WGQ 8/17/06
Final Minutes
WGQ 2006 Annual Plan (Redline - 8/17/06 |
Revised Meeting Arrangements
Nearby Hotels
Request R05004 - Revised 8/2/06
Transcripts from the meeting can be ordered from Court Reporter's Clearinghouse - 713-626-2629
EC Meeting Material Applicable to all Quadrants
EC Meeting Cross Reference
Supplemental Material:
WEQ 2006 Annual Plan Item 3ci Comments Submitted by JT Wood, Southern Company
R04036 Comments Submitted by J.Dison, Southern Company Generation
WEQ 2006 Annual Plan Item 3ax Comments Submitted by V.Bissonnette, Hydro-Quebec TransEnergie
WEQ 2006 Annual Plan Item 3ax Comments Submitted by N.Parker, Bonneville Power Administration
WEQ 2006 Annual Plan Item 3ax Comments Submitted by J.Dison, Southern Company Generation
WEQ 2006 Annual Plan Item 3ax Supplemental Comments Submitted by J.Dison, Southern Company Generation
Recommendation R04036 - revised by ESS/ITS on 08/11/06
ESS/ITS Response to Comments on R04006D - 08/11/06
WEQ 2006 Annual Plan Item 3ax Comments by P. Sorenson, Open Access Technology International, Inc.
Revised Recommendation for WEQ 2006 Annual Plan Item 3ax - 8/15/06 |
| May 9-11, 2006 |
EC Meetings
Washington, DC
Hosted by the AGA |
Agendas - Second Revision |
Notational Ballot
WEQ 5/9/06
Final Minutes
Attachment WEQ 2006 Annual Plan (Redline - 5/9/06)
Joint Retail 5/10/06
Final Minutes
Attachment Retail 2006 Annual Plan (Redline - 5/10/06)
WGQ 5/11/06
Final Minutes
Attachment WGQ 2006 Annual Plan (Redline - 5/11/06) |
Meeting Arrangements
Transcripts from the meeting can be ordered from Ace Federal Reporters - 202-347-3700
EC Meeting Material Applicable to All Quadrants
EC Meeting Material Applicable to WEQ
EC Meeting Material Applicable to Retail
EC Meeting Material Applicable to WGQ
EC Meeting Cross Reference
Supplemental Material Recommendation for WEQ 2006 AP Item 3(c)(i) - Redline |
| April 19, 2006 |
WEQ EC Meeting
Conference Call
with Web Conferencing |
CANCELLED |
|
|
| February 21-23, 2006 |
EC Meetings
Houston, TX
Held at the NAESB office
13th Floor, San Jacinto room |
Agendas |
WEQ 2/21/06
Final Minutes
Attachment WEQ 2006 Annual Plan (Redline - 2/21/06)
Joint Retail 2/22/06
Final Minutes
Attachment Retail Gas and Retail Electric 2006 Annual Plan (Redline - 2/22/06)
WGQ 2/23/06
Final Minutes
Attachment WGQ 2006 Annual Plan (Redline - 2/23/06) |
Nearby Hotels
EC Meeting Material Applicable to All Quadrants
EC Meeting Material Applicable to WEQ
EC Meeting Material Applicable to Retail
EC Meeting Material Applicable to WGQ
EC Meeting Material Fully Assembled
Transcripts from the meeting can be ordered from Riverside Reporting - 713-662-0062 |
| November 29 - December 1, 2005 |
EC Meetings
Washington, DC
Hosted by AGA |
Agendas |
Notational Ballot
WEQ 11/29/05
Final Minutes
Attachment WEQ 2006 Annual Plan (Redline - 11/29/05)
Attachment WEQ 2006 Annual Plan (Clean - 11/29/05)
Attachment WEQ 2005 Annual Plan (Clean - 11/29/05)
IIPTF Recommendation Revised by the WEQ EC (Redline - 11/29/05)
IIPTF Recommendation Attachment Revised by the WEQ EC (Redline - 11/29/05)
Joint REQ/RGQ 11/30/05
Final Minutes
Attachment Retail 2006 Annual Plan (Redline - 11/30/05)
Attachment REQ 2005 Annual Plan (Redline - 11/30/05)
Attachment REQ 2005 Annual Plan (Clean - 11/30/05)
Attachment RGQ 2005 Annual Plan (Redline - 11/30/05)
Attachment RGQ 2005 Annual Plan (Clean - 11/30/05)
Attachment REQ Contracts Subcommittee Mission
Attachment RGQ Contracts Subcommittee Mission
WGQ 12/01/05
Final Minutes
Attachment WGQ 2006 Annual Plan (Redline - 12/1/05)
Attachment WGQ 2006 Annual Plan (Clean - 12/1/05)
Attachment WGQ 2005 Annual Plan (Redline - 12/1/05)
Attachment WGQ 2005 Annual Plan (Clean - 12/1/05) |
Meeting Arrangements
Compilation of TAPS Comments
DUNS Final Report
EC Meeting Material Applicable to All Quadrants
EC Meeting Material Applicable to WEQ
EC Meeting Material Applicable to Retail
EC Meeting Material Applicable to WGQ
EC Meeting Material Fully Assembled
EC Meeting Cross Reference
WEQ BPS 11/12/05 Conference Call Draft Minutes
R04035 & R05002 Comments Submitted by R. Vojdani, Western Area Power Administration
Letter from NERC regarding Decision to Withdraw TLR Procedure Standards Authorization Request
Changes to TLR Business Practices (Recommendation R04013A) by the BPS 11/22/05
Transcripts from the meeting can be ordered from Ace Federal Reporters - 202-347-3700 |
| September 12, 2005 |
WEQ EC Meeting
Conference Call |
Agenda
CANCELLED |
|
WEQ OASIS S&CP Check List 9/7/05 |
| August 23-25, 2005 |
EC Meetings
Colorado Springs, CO
Hosted by El Paso Western Pipelines |
Revised Agenda |
Notational Ballot
WEQ 8/23/05
Final Minutes
Attachment - WEQ 2005 Annual Plan Redline
Joint REQ/RGQ 8/24/05
Final Minutes
Attachment - REQ 2005 Annual Plan Redline
Attachment - RGQ 2005 Annual Plan Redline
WGQ 8/25/05
Final Minutes
Attachment - WGQ 2005 Annual Plan Redline |
Suggested Changes to May 26, 2005 Joint WEQ/WGQ EC Draft Minutes Submitted by D. Davis
Suggested Changes to May 31, 2005 Joint WEQ/WGQ EC Draft Minutes Submitted by D. Davis
Meeting Arrangements and Hotel Room Block
Additional Nearby Hotels
Comments Submitted by TAPS
EC Meeting Material Applicable to All Quadrants
EC Meeting Material Applicable to WEQ
EC Meeting Material Applicable to Retail
EC Meeting Material Applicable to WGQ
EC Meeting Cross Reference
Supplemental Materials: JOITF Final Report 7-15-05
Transcripts from the meeting can be ordered from Riverside Reporting - 713-662-0062 |
| May 31, 2005 |
Joint WEQ/WGQ EC Meeting
Conference Call |
Agenda |
Final Minutes
Notational Ballot Due by Noon on 06/03/05 |
Final Revisions D1F-S1F (Redline)
Final Revisions D1F-S1F (Clean)
May 27, 2005 Revision S16F (Redline)
May 27, 2005 Revision S16F (Clean)
WGQ LDC Segment EC Representative's Proposal Changes to S3X - Submitted by M. Novak
D1 Comments - Submitted by M Shepard, Mewbourne Oil Company
Transcripts from the meeting can be ordered from Riverside Reporting - 713-662-0062 |
| May 26, 2005 |
Joint WEQ/WGQ EC Meeting
Conference Call |
Announcement
Agenda |
Final Minutes
Notational Ballot Due by Noon on 5/26/05
Attachment - Final Revisions D1F-S1F (Redline)
Attachment - Final Revisions D1F-S1F (Clean) |
Transcripts from the meeting can be ordered from Riverside Reporting - 713-662-0062
Comments Submitted by B. Kedrowski, We Energies
Comments Submitted by B. Gray, El Paso Electric Company
Comments Submitted by M. Shepard, Mewbourne Oil Company
Comments Submitted by G. Brown, California ISO
Comments Submitted by L. Ell, Entergy
Comments Submitted by J. Smith, Entergy Services, Inc. Gas Group
Comments Submitted by K. York, Tennessee Valley Authority
Comments Submitted by M. Desselle, American Electric Power
Comments Submitted by J. Lewis, American Gas Association
Comments Submitted by L. Crowley, NJR Companies
Comments Submitted by K. VanPelt, Pipeline Segment
Comments Submitted by K. Burch, Duke Energy Corporation
Comments Submitted by G. Ogenyi, Conectiv
Comments Submitted by P. Larger, Progress Energy Carolinas
Compiled Comments
Proposed NAESB WEQ and WGQ Standard: S7X Analysis - submitted by Mike Novak, National Fuel
Proposed NAESB WEQ and WGQ Standard: S7X Final Comments and Final Example - submitted by P. Love |
| May 10-12, 2005 |
EC Meetings
Houston, TX
Held at the NAESB office
San Jacinto Room |
Agenda |
WEQ 5/10/05
Final Minutes
Attachment - WEQ 2005 Annual Plan Redline
Joint REQ/RGQ 5/11/05
Final Minutes
Attachment - REQ 2005 Annual Plan Redline
Attachment - RGQ 2005 Annual Plan Redline
WGQ 5/12/05
Final Minutes
Attachment - WGQ 2005 Annual Plan Redline |
Nearby Hotels
DUNS Numbering Task Force February 8, 2005 Notes
Transcripts from the meeting can be ordered from Riverside Reporting - 713-662-0062
EC Meeting Material Applicable to All Quadrants
EC Meeting Material Applicable to WEQ
EC Meeting Material Applicable to Retail
EC Meeting Material Applicable to WGQ
EC Meeting Cross Reference |
| February 8, 2005 |
Joint WEQ/WGQ EC
Conference Call |
Agenda |
Final Minutes
Attachment - WEQ 2005 Annual Plan Redline
Attachment - WGQ 2005 Annual Plan Redline |
|
| February 1-3, 2005 |
EC Meetings
Houston, TX
Held at the NAESB office
San Jacinto Room |
Revised Agendas |
WEQ 02/01/05
Final Minutes
Attachment - WEQ 2005 Annual Plan Redline
Joint REQ/RGQ 02/02/05
Final Minutes
Attachment - RGQ 2005 Annual Plan Redline - Modified 020205
Attachment - REQ 2005 Annual Plan Redline - Modified 020205
Attachment - REQ BPS Redlined Mission Statement
Attachment - RGQ BPS Redlined Mission Statement
Attachment - REQ IR Redlined Mission Statement
Attachment - RGQ IR Redlined Mission Statement
Attachment - Revised Glossary Definitions Process
WGQ 02/03/05
Final Minutes
Attachment - WGQ 2005 Annual Plan Redline
WGQ Notational Ballot Due February 2, 2005 |
Nearby Hotels
Transcripts from the meeting can be ordered from Riverside Reporting - 713-662-0062
EC Meeting Material Applicable to All Quadrants
EC Meeting Material Applicable to WEQ
EC Meeting Material Applicable to Retail
EC Meeting Material Applicable to WGQ
EC Meeting Cross Reference |
| November 30, 2004 |
WEQ EC Meeting
Brooklyn, New York
Hosted by KeySpan Energy |
Agenda |
Notational Ballot Due November 29, 2004
Final Minutes
Area Control Error (ACE) - Redlined
Coordinate Interchange - Redlined
Inadvertent Interchange Payback - Redlined
Manual Time Error Correction - Redlined
Transmission Loading Relief - Eastern Interconnection - Redlined
Notational Ballot Due December 7, 2004
Draft 2005 NAESB WEQ Annual Plan |
Meeting Arrangements
Recommendation - ACE Business Practice Standards
Recommendation - Coordinate Interchange Business Practice Standards
Recommendation - Inadvertent Interchange Business Practice Standards
Recommendation - Time Error Correction Business Practice Standards
Recommendation - TLR Business Practice Standards
Comments (Inadvertent Interchange) Submitted by: NERC Resources Subcommittee
Comments (ACE Special Cases) Submitted by: NERC Resources Subcommittee
Comments (Time Error) Submitted by: NERC Resources SUbscommittee
Comments (Time Error) Submitted by: Salt River Project
Comments (Coordinate Interchange) Submitted by: Salt River Project
Comments (Coordinate Interchange) Submitted by: M. Pfeister of Salt River Project
Comments (Coordinate Interchange) Submitted by: CASIO
Comments (ACE Special Equation) Submitted by: CASIO
Comments (Time Error) Submitted by: CASIO
Comments (Inadvertent Interchange) Submitted by: CASIO
Comments (Time Error) Submitted by: Mirant
Comments (ACE Special Cases) Submitted by: Mirant
Comments (Time Error) Submitted by: Allegheny Power
Comments (Coordinate Interchange) Submitted by: Allegheny Power
Overall Comments Submitted by Duke Energy
Comments (Inadvertent Interchange) Submitted by: Mirant
Comments (ACE Special Cases) Submitted by: Entergy Services
Comments (Coordinate Interchange) Submitted by: Entergy Services
Comments (Inadvertent Interchange) Submitted by: Entergy Services
Comments (Time Error) Submitted by: Entergy Services
Comments (TLR) Submitted by: Entergy Services
Comments (Coordinate Interchange) Submitted by: Mirant
Comments (Time Error) Submitted by: ISO RTO Council - SRC
Comments (Coordinate Interchange) Submitted by: ISO RTO Council - SRC
Comments (Inadvertent Interchange) Submitted by: ISO RTO Council - SRC
Comments (Ace Special Cases) Submitted by: ISO RTO Council - SRC
2005 WEQ Annual Plan (Redline)
2005 WEQ Annual Plan (Clean)
NERC Glossary of Terms Used in Reliability Standards
Document Incorporating All Final Industry Comments in Version 0 and Responses to the Final Comments by the WEQ BPS: Updated 11/29/04
Document Incorporating WEQ BPS Responses to Final Industry Comments on Version 0 11/29/04
Comments on 2005 WEQ Annual Plan Draft 11/17/04 Submitted by: B. Rehman, BPA |
| November 16-18, 2004 |
EC Meetings
Washington, DC
Hosted by AGA |
Agendas |
Notational Ballot Due November 15, 2004
WEQ 11/16/04
Final Minutes
Attachment 1: Recommendation R04005A
Attachment 2: Recommendation R04006A
Attachment 3: Recommendation R04006B
Attachment 4: Recommendation R04006C
Attachment 5: Recommendation R04011
Attachment 6: 2004 WEQ Annual Plan
Attachment 7: Draft 2005 WEQ Annual Plan
Joint REQ/RGQ 11/17/04
Final Minutes
Attachment 1: REQ Recommendation-Market Participant Interactions (2004 REQ AP 2)
Attachment 2: RGQ Recommendation-Market Participant Interactions (2004 RGQ AP 2)
Attachment 3: REQ Recommendation-Distribution Company-Supplier Disputes MBPs (2004 REQ AP 4)
Attachment 4: RGQ Recommendation-Distribution Company-Supplier Disputes MBPs (2004 REQ AP 4)
Attachment 5: 2004 REQ Annual Plan
Attachment 6: 2004 RGQ Annual Plan
Attachment 7: Draft 2005 REQ Annual Plan
Attachment 8: Draft 2005 RGQ Annual Plan
WGQ 11/18/04
Final Minutes
Attachment 1: 2004 WGQ Annual Plan
Attachment 2: Draft 2005 WGQ Annual Plan |
Meeting Arrangements
Recommendations from the WEQ ESS and WEQ ITS for Consideration at the November 16 WEQ EC Meeting
EC Meeting Material Applicable to All Quadrants
EC Meeting Material Applicable to WEQ
EC Meeting Material Applicable to Retail
EC Meeting Material Applicable to WGQ
EC Meeting Cross Reference
Transcripts from the meeting can be ordered from Beta Reporting - 202-638-2400 |
| November 11, 2004 |
Joint WEQ/WGQ EC
Conference Call |
Agenda |
Meeting Notes |
|
| August 31, 2004 |
All Quadrant EC
Conference Call |
Revised Agenda |
Results with Notational Votes
Notational Ballot Due September 21, 2004 |
Request for comments on GECTF Final Report
GECTF Final Report (Word Format)
Attachment to GECTF Final Report
Comments Submitted by Southern Company
GECTF June 29-30, 2004 Final Minutes
GECTF July 22, 2004 Draft Minutes
Transcripts from the meeting can be ordered from Riverside Reporting - 713-662-0062
Request R04021
Request R04022
Request R04023
Request R04024
Request R04025
Request R04026 |
| August 24-26, 2004 |
EC Meetings
Colorado Springs, CO
Hosted by El Paso Corporation
Held at the Cheyenne Mountain Resort |
Agendas - with revisions to the WGQ Agenda |
WEQ 8/24/04
Final Minutes
WEQ 2004 Annual Plan modified by the WEQ EC 8/24/04
Joint REQ/RGQ 8/25/04
Final Minutes
Revised REQ Recommendation on Market Participant Interactions - Adopted by the REQ EC on 8/25/04
Revised RGQ Recommendation on Market Participant Interactions - Adopted by the RGQ EC on 8/25/04
REQ Recommendation on Non-Disclosure Agreement - Adopted by the REQ EC on 8/25/04
RGQ Recommendation on Non-Disclosure Agreement - Adopted by the RGQ EC on 8/25/04
REQ 2004 Annual Plan Updated by the REQ EC on 8/25/04
RGQ 2004 Annual Plan Revised by the RGQ EC on 8/25/04
NAESB REQ Quadrant Procedures Revised August 25, 2004
WGQ 8/26/04
Final Minutes
Recommendation R96056 as approved by the WGQ EC on August 26, 2004
Minor Correction - Nomination Quick Response-Transaction Status Code
Minor Correction - Std 5-4-13 Codes for Bidder Affiliate
WGQ 2004 Annual Plan Revised by the WGQ EC on 8/26/04 |
Revised Meeting Arrangements
Recommendation for R03017
Transcripts from the meeting can be ordered from Riverside Reporting - 713-662-0062
EC Meeting Material Applicable to All Quadrants
EC Meeting Material Applicable to WEQ
EC Meeting Material Applicable to Retail
EC Meeting Material Applicable to WGQ
Supplemental Materials |
| May 4-6, 2004 |
EC Meetings
Juno Beach, FL
Hosted by Florida Power & Light |
Agendas |
WEQ 5/4/04
Final Minutes
WEQ 2004 Annual Plan approved 2/25/04
R03013 Revised by the WEQ EC 5/4/04
Joint REQ/RGQ 5/5/04
Final Minutes
REQ 2004 Annual Plan approved 2/25/04
RGQ 2004 Annual Plan approved 2/25/04
Recommendation for Billing and Payments Definitions (Approved 5/5/04)
Recommendation for Creditworthiness Introduction and Executive Summary (Revised and Approved 5/5/04)
Recommendation for Creditworthiness Process Flow Diagrams (Revised and Approved 5/5/04)
Recommendation for Internet Electronic Transport (Revised by the WGQ EC 5/6/04)
WGQ 5/6/04
Final Minutes
WGQ 2004 Annual Plan approved 05/06/04
Recommendation for Order 2004 Standards (Revised and Approved 5/6/04)
Recommendation for Internet Electronic Transport (Revised by the WGQ EC 5/6/04) |
Meeting Arrangements
Comments Submitted by ISO New England
Comments Submitted by Consumers Energy
Comments Submitted by WECC Interchange Scheduling and Accounting Subcommittee
Comments Submitted by Allegheny Power
Comments Submitted by Entergy
Comments Submitted by We Energies
Comments Submitted by the ISO/RTOs
Comments Submitted by TVA
Comments Submitted by the NAESB CIBP Task Force
Comments Submitted by BPA Transmission
Comments Submitted by the Los Angeles Dept of Water and Power
Comments Submitted by the BPA Power Business Line (Pt 1)
Comments Submitted by the BPA Power Business Line (Pt 2)
Comments Submitted by the BPA Power Business Line (Pt 3)
Correspondence from NERC regarding Accelerated Transition to "Version 0" Reliability Standards
Comments Submitted by NAESB WEQ ESS
EC Meeting Material Applicable to All Quadrants
EC Meeting Material Applicable to WEQ
EC Meeting Material Applicable to Retail
EC Meeting Material Applicable to WGQ
Agenda Cross-Reference
EC Alternates List - Revised April 27, 2004
Additional Comments Submitted by Entergy
Additional Comments Submitted by Southern
WEQ Membership Proposals
Presentation on Scope Document for OWL
Presentation on Seams Catalog Prioritization
Transcripts from the meeting can be ordered from Riverside Reporting - 713-662-0062 |
| April 5, 2004 |
All Quadrant EC
Conference Call |
Agenda |
Draft Minutes with Notational Votes |
GECTF Interim Status Report
Revised Attachment to GECTF Interim Status Report
Comments Submitted by the State of South Carolina
Comments Submitted by AEP
Redlined Draft Minutes from November 6, 2003 WGQ/RGQ EC Call |
| March 12, 2004 |
WEQ EC Meeting
Conference Call |
Agenda |
Draft Minutes |
IIPTF Substantive Motions as of March 8, 2004 |
| February 24-26, 2004 |
EC Meetings
Houston, TX
Crowne Plaza Downtown Houston Hotel |
Agendas with Corrected Meeting Times |
WEQ 2/24/04
Final Minutes
WEQ 2004 Annual Plan as amended 2/24/04
RGQ 2/25/04
Final Minutes
Joint REQ/RGQ Session 2/25/04
Final Minutes
REQ 2004 Annual Plan approved 2/25/04
RGQ 2004 Annual Plan approved 2/25/04
WGQ 2/26/04
Final Minutes
WGQ 2004 Annual Plan reviewed 2/26/04 |
Transcripts from the meeting can be ordered from Riverside Reporting - 713-662-0062
Downtown Houston Hotels
EC Meeting Material Applicable to All Quadrants
EC Meeting Material Applicable to WEQ
EC Meeting Material Applicable to Retail
EC Meeting Material Applicable to WGQ
Comments Submitted by Entergy
Comments Submitted by Midwest ISO
Revised Timetable - Attachment to R03013 Recommendation
EC Members and Alternates Terms
Seams Catalog Updated February 24, 2004 |
| February 5, 2004 |
All Quadrant EC
Conference Call |
Agenda |
Draft Minutes |
Comments Submitted by Washington Gas regarding R03035
Triage Results from January 9, 2004 |
| February 3-4, 2004 |
WEQ Meeting to prepare for the JIC February Meeting
Dallas, TX
Hosted by AEP |
Agenda and Meeting Arrangements |
Final Minutes |
Collapsed Seams Catalog dated 1/16/04 (PDF Format)
Collapsed Seams Catalog dated 1/16/04 (Excel Format)
Revised Assignment Concepts dated 1/16/04
Submission by National Grid USA
Request R04005
Request R04005 Attachment
Request R04006
Request R04007
Request R04007 Attachment 1
Request R04007 Attachment 2
Seams Subcommittee Report |
| December 9-11, 2003 |
EC Meetings
Houston, TX
Hosted by NAESB |
Agendas with corrected date |
WEQ 12/9/03
Final Minutes
WEQ 2004 Annual Plan as amended 12/9/03
Joint REQ/RGQ Session 12/10/03
Final Minutes with Notational Votes
REQ Billing and Payments Model Business Practices Modified 12/10/03
RGQ Billing and Payments Model Business Practices Modified 12/10/03
REQ Session 12/10/03
Final Minutes
RGQ Session 12/10/03
Final Minutes
WGQ 12/11/03
Final Minutes |
Meeting Arrangements
Transcripts from the meeting can be ordered from Riverside Reporting - 713-662-0062
EC Meeting Material Applicable to All Quadrants
EC Meeting Material Applicable to Retail
EC Meeting Material Applicable to WEQ
EC Meeting Material Applicable to WGQ
WEQ ITS recommended actions on OASIS 1A Issues
NERC MC SRS/Seams Coordination Task Force Charter & Process
Request R03031 - Revised November 20, 2003
Seams Issue Catalog as of 12/9/03 in Legal Format
Seams Subcommittee Report
WEQ ESS Draft Agenda for December 15-16, 2003
WEQ ESS Mission Statement as of December 2, 2003 |
| November 20, 2003 |
All Quadrant EC
Conference Call |
Agenda |
Draft Minutes with Notational Votes
Request R03031 - Revised November 20, 2003 |
Comments Submitted by Barbara Alexander, Maine OPA
Request R03031
Triage Notes from October 29
2004 WEQ Annual Plan - draft
2004 WGQ Annual Plan - draft
Comments Submitted by National Fuel Gas Distribution
Transcripts from the meeting can be ordered from Riverside Reporting - 713-662-0062 |
| October 7-9, 2003 |
EC Meetings
Tempe, AZ
Hosted by Systrends |
Agenda |
WEQ 10/7/03
Final Minutes
2004 WEQ Annual Plan as voted in the meeting
Diagram on WEQ Executive Subcommittee Structure
Joint REQ/RGQ Session 10/8/03
Final Minutes
Attachment 1 - 2004 RGQ Annual Plan
Attachment 2 - 2003 RGQ Annual Plan
Attachment 3 - 2004 REQ Annual Plan
Attachment 4 - 2003 REQ Annual Plan
RGQ 10/8/03
Final Minutes
REQ 10/8/03
Final Minutes
WGQ 10/9/03
Final Minutes
Attachment 1 - 2004 WGQ Annual Plan
Attachment 2 - 2003 WGQ Annual Plan |
Meeting Arrangements
Open Access Same Time Information System (OASIS) - A History
EC Meeting Material Applicable to All Quadrants
EC Meeting Material Applicable to WEQ
EC Meeting Material Applicable to Retail
EC Meeting Material Applicable to WGQ
Electricity Market Design and Structure: Order on a Standards Development Organization for the Wholesale Electric Industry
Electricity Market Design and Structure: Order Providing Guidance on the Formation of a Standards Development Organization for the Wholesale Electric Industry
OASIS Phase IA
OASIS Phase II
Security (OASIS and PKI)
Supplemental EC Meeting Materials Applicable to All Quadrants
An Open Letter from Michael Desselle, Progress Report for the NAESB WEQ, 1 Year Later
Letter from ESC Chairman John Simonelli and Vice Chairman Jim Hansen regarding the "ESC Deliverables"
2004 Annual Plan Revised Wording
October 2003 WEQ Structures
WEQ EC Subcommittee Structure
Transcripts from the meeting can be ordered from Riverside Reporting - 713-662-0062 |
| September 11, 2003 |
WEQ EC Meeting
Montreal, Canada
Hosted by Hydro-Quebec |
Revised Agenda |
Final Minutes
Scope Document for CIBP
Scope Document for OWL
Draft WEQ 2004 Annual Plan - Redlined |
Meeting Arrangements
Strawman for 2004 WEQ Annual Plan - Request for Comments
Comments Submitted by SRP
Comments Submitted by Bonneville Power Administration
WEQ 2003 Annual Plan - as of August 5, 2003
WEQ COBP Scoping Document
WEQ CIBP Scoping Document
WEQ CIBP Scoping Document Reference Work Paper on Reliability and Commercial Practices in Policy 3
Revised Request R03013
Revised Request R03014
Comments Submitted by Western Systems Power Pool, Inc. (WSPP)
Comments Submitted by PacifiCorp
Comments Submitted by Exelon
Comments Submitted by Mirant
WEQ CIBP Scoping Document Revised 9/9/03
Scope Document for Operate Within Interconnection Reliability Operating Limits
Docket No. PL03-3-000 - Policy Statement on Natural Gas and Electric Price Indices |
| August 5-7, 2003 |
EC Meetings
Philadelphia, PA
Hosted by PECO Energy |
Meeting Announcement
Agenda |
WEQ 8/5/03
Final Minutes
Attachment - 2003 WEQ Annual Plan
WGQ 8/6/03
Final Minutes
Attachment - 2003 WGQ Annual Plan
Joint REQ/RGQ Session 8/7/03
Final Minutes
Attachment 1 - 2003 REQ Annual Plan
Attachment 2 - 2003 RGQ Annual Plan
REQ 8/7/03
Final Minutes
Attachment 1 - NAESB Memo Regarding Requests for Triage
RGQ 8/7/03
Final Minutes |
Meeting Arrangements
Transcripts from the meeting can be ordered from Ace Federal Reporters - 202-347-3700
Executive Committee Book (Zip File)
EC Draft Minutes from July 31, 2003 |
| July 31, 2003 |
Joint EC Conference Call |
Agenda |
Revised Draft Minutes |
Triage Results from June 16, 2003
Triage Results from July 21, 2003 without Notational Ballots |
| June 3-5, 2003 |
EC Meeting
Washington, DC
Hosted by AGA |
Agendas - with Revisions to WEQ and WGQ Agendas |
WEQ 6/3/03
Final Minutes
Attachment - 2003 WEQ Annual Plan
Joint REQ/RGQ Session 6/4/03
Final Minutes
Attachment 1 - Proposal for Numbering NAESB Standards
REQ 6/4/03
Final Minutes
Attachment 1 - Mission Statements
RGQ 6/4/03
Final Minutes
WGQ 6/5/03
Final Minutes
Attachment A - Creditworthiness Standards and Voting Record
Attachment B - Creditworthiness Package 1
Attachment C - Creditworthiness Package 2
Attachment D - Compiled Voting Record |
Meeting Arrangements
Executive Committee Book
Transcripts from the meeting can be ordered from Ace Federal Reporters - 202-347-3700 |
| April 8-10, 2003 |
EC Meeting
Ft. Lauderdale, FL
Hosted by Florida Power & Light
Held at the Riverside Hotel |
Agendas |
WEQ 4/8/03
Final Minutes
Attachment - 2003 WEQ Annual Plan
WGQ 4/9/03
Final Minutes
Attachment - 2003 WGQ Annual Plan
RGQ 4/10/03
Final Minutes
Attachment - 2003 RGQ Annual Plan
Joint REQ/RGQ 4/10/03
Final Minutes
REQ 4/10/03
Final Minutes
Attachment - 2003 REQ Annual Plan |
Meeting Arrangements - Revised
Executive Committee Book
WEQ MOS Subcommittee Update
Dealing with Seams Issues - A Report from the Northeast
Proposed Changes to the RGQ and RGQ/REQ Joint Session Agendas
WEQ Contracts Subcommittee Report to the EC
NAESB Web Site Enhancement Report
Transcripts from the meeting can be ordered from Certify Realtime Reporting - 954-525-0996
| March 31, 2003 |
Joint EC Meeting
Conference Call |
CANCELLED |
|
|
| February 18-20, 2003 |
EC Meeting
New Orleans, LA
Hosted by Entergy
Held at the Wyndham New Orleans Hotel |
Agendas |
WEQ 2/18/03
Final Minutes
Attachment - Redlined Annual Plan
RGQ 2/19/03
Final Minutes
Attachment - Redlined Annual Plan
REQ 2/19/03
Final Minutes
Attachment - Redlined Annual Plan
Joint REQ/RGQ Session 2/19/03
Final Minutes
WGQ 2/20/03
Final Minutes
Attachment - 2003 WGQ Annual Plan |
Meeting Arrangements
Executive Committee Book
Supplemental Materials |
| February 7, 2003 |
Joint EC Meeting
Conference Call |
Agenda |
|
Triage Results from January 31, 2003
Draft EC Minutes from December 6, 2002 |
| December 12-13, 2002 |
New York
Hosted by Consolidated Edison Co. of NY |
Revised Draft Agenda |
WEQ 12/12/02
Final Minutes
Attachment 1 - WEQ 2003 Annual Plan
WGQ 12/12/02
Final Minutes
Attachment 1 - WGQ 2002 Annual Plan
Attachment 2 - WGQ 2003 Annual Plan
Attachment 3 - R02002-3
Attachment 4 - R97058B
REQ 12/13/02
Final Minutes
Attachment 1 - REQ 2002-2003 Annual Plan
RGQ 12/13/02
Final Minutes
Attachment 1 - RGQ 2002-2003 Annual Plan |
Meeting Arrangements
Executive Committee Book
Note from EEI on Contracts
2003 Annual Plan Implementation Schedule
Transcripts from the meeting can be ordered from Ace Federal Reporters - 202-347-3700 |
| December 6, 2002 |
Conference Call |
Agenda |
Draft Minutes |
Triage Results from December 6 |
| October 17-18, 2002 |
Arizona
Hosted by Arizona Public Service Co. |
Agenda |
WGQ Final Minutes
REQ Final Minutes
WEQ Final Minutes |
Revised Meeting Arrangements - Hotel Cutoff is October 4
Executive Committee Book
Reliant Annual Plan Suggestions
Transcripts from the Meeting can be ordered from Cropper & Associates - 602-277-8882 |
| September 27, 2002 |
WEQ Executive Committee Member Conference Call |
Meeting Announcement |
|
|
| September 13, 2002 |
Board and Executive Committee Election Results |
|
|
Election Results |
|