Date Location Agenda Minutes Misc.
May 19-20, 2008 WGQ BPS

Order 698 Meeting

Washington, DC

Hosted by Stinson Morrison & Hecker

With Web Conferencing
Agenda Draft Minutes

Existing Timeline and Current Proposals - May 20, 2008

Vote Tally - May 20, 2008
Meeting Arrangements

American Gas Foundation Study concerning Natural Gas & Power Generation Submitted by M. Novak, National Fuel Gas Distribution

Order No. 698, Intraday Nomination Timeline Proposals Submitted by D. Richard Beam, Old Dominion Electric Cooperative

Proposed ID3 Submitted by D. Chezar, National Grid Gas Distribution Companies - May 19, 2008

Existing Timeline and Current Proposals - May 19, 2008

Work Paper Submitted by M. Shepard, Mewbourne Oil Company

Request from Ms. Crockett regarding Order 698 related standards development schedule
April 22-23, 2008

PLEASE NOTE THIS MEETING WILL TAKE PLACE AND IS NO LONGER A TENTATIVE MEETING
WGQ BPS

Order 698 Meeting

Please note new location: Washington, DC

Hosted by the AGA

With Web Conferencing
Agenda Draft Minutes

Attachments to Meeting Minutes:

(7C) Timeline Design Considerations - 04/23/08 (Redline)

(7C) Timeline Design Considerations - 04/23/08 (Clean)

(7C) Proposed Model Comparison (Timeline Design Considerations) Chart - 04/23/08

Revised APS/TVA Proposed Model (Redline) - 04/23/08 Presented by V. Crockett

Iroquois Proposed Models 1 & 2 - 04/23/08 Presented by T. Gwilliam

Northern Border Proposed Model - 04/23/08 Presented by S. Coburn

El Paso (12 PM) Proposed Model - 04/23/08 Presented by B. Griffith

El Paso (1 PM) Proposed Model - 04/23/08 Presented by B. Griffith

TransCanada Proposed Models 1 & 2 - 04/23/08 Presented by K. Shubert

Pipeline Collaborative Proposed Model - 04/23/08 Presented by K. Burch

FPL Energy Proposed Model - 04/23/08 Presented by S. Tomalty

Straw vote tally on models - 04/23/08
Meeting Arrangements

Proposed Changes to 2/26-27/2008 Draft Minutes Submitted by D. Davis, Williams (Redline)

Proposed Changes to 2/26-27/2008 Draft Minutes Submitted by D. Rudd, New Jersey Natural Gas Company (Redline)

APS/TVA Revised Proposal
- April 17, 2008, Submitted by V. Crockett, TVA

Redlines to Feb. 26-27, 2008 Draft Minutes, Submitted by L. Oberski, Dominion Resources Services, Inc

Nominations Model Developed by Northern Border Pipeline - Submitted by S. Coburn

Proposed Changes to 3/12-13/2008 Draft Minutes Submitted by D. Davis, Williams (Redline)

Proposed Changes to 2/26-27/2008 Draft Minutes with Combined Redlines from D. Davis, D. Rudd and L. Oberski - Submitted by D. Davis

Work Paper Submitted by D. Robinson, ISO New England

Work Paper - NAESB WGQ BPS Order 698 Timeline Discussions - Submitted by T. Gwilliam, Iroquois

(7C) Timeline Design Considerations - 04/22/08 (Redline)

NAESB Order 698 Nominations - All Proposals - Compared

Revised APS/TVA Proposal (Redline) - 04/23/08 Presented by V. Crockett, TVA
March 12-13, 2008 WGQ BPS

Order 698 Meeting

Colorado Springs, CO

Hosted by El Paso Western Pipelines

With Web Conferencing
Agenda Final Minutes

Attachments to Meeting Minutes:

(7A) Modified and New Proposed Standards - Revised 03/13/2008 (Redline)

(7A) CORRECTED FILE: Approved Definitions, Modified and New Standards - 02/08/2008,02/21/2008, and 03/13/08

(7C) Timeline Design Considerations - 03/13/2008
Meeting Arrangements

Annual Plan Item 7A:

(7A) Modified and New Proposed Standards - Revised 02/21/2008 (Redline)

(7A) Approved Definitions, Modified and New Standards - 02/08/21 and 02/21/2008

(7A) Proposed Pipeline Modifications - 2/6/08

(7A) 114 FERC 61170 (Capacity Release Order) - Referenced by M. Goldenberg, FERC in Feb 21st WGQ BPS Order 698 Meeting

(7A) Index Based Capacity Release Work Paper Submitted by M. Novak, National Fuel - 3/12/08

Annual Plan Item 7c:

(7C) Nomination Timelines Work Paper Submitted by K. Schubert, TransCanada PipeLines Limited

(7C) Feb 26-27, 2008 Meeting Disucssion Captured on Pipeline Collaborative Proposal (Redline)

(7C) Energy Day - 12 PM Gas Day vs Calendar Day Submitted by El Paso

(7C) Energy Day - 1 PM Gas Day vs Calendar Day Submitted by El Paso

(7C) Work Paper for Intraday Discussion Submitted by TVA and APS - 01/09/2008

Proposed Changes to 2/8/2008 Draft Minutes Submitted by D. Davis, Williams (Redline)

Proposed Changes to 2/21/2008 Draft Minutes Submitted by D. Davis, Williams (Redline)

(7C) Timeline Design Considerations - 03/12/2008

(7A) Work Paper Submitted by M. Novak, National Fuel - 3/13/08
February 26-27, 2008

Please note new meeting dates
WGQ BPS

Order 698 Meeting

Please note new location: Newark, NJ

Hosted by PSEG

With Web Conferencing
Agenda Final Minutes

Attachment: Feb 26-27, 2008 Meeting (7C) Disucssion Captured on Pipeline Collaborative Proposal (Redline)
Revised Meeting Arrangements - with more details on PSEG hotel rates

Proposed Changes to 12/4/2007 Draft Minutes Submitted by D. Davis, Williams (Redline)

Proposed Changes to 12/5/2007 Draft Minutes Submitted by D. Davis, Williams (Redline)

Annual Plan Item 7C:

Comments Submitted by B. Gray, El Paso Electric Company

Comments Submitted by C. Tilghman, Tucson Electric Power Company

Comments Submitted by T. Mead, UniSource Energy Services

Letter from Kansas Corporation Commission regarding Order No. 698

Response to Kansas Corporation Commission from Michael Desselle regarding Order No. 698

Comments Submitted by D. Chezar, KeySpan/National Grid

Comments Submitted by E. Johnson, Arizona Corporation Commission

Comments Submitted by C. Patka, NYISO

Comments Submitted by J. Horalek, Honeywell International

Comments Submitted by P. McCullar, Delaware Municipal Electric Corporation

Comments Submitted by P. O'Loughlin, Buckeye Power, Inc.

Cover Letter to Comments Submitted by L. Franklin, Old Dominion Electric Cooperative

Comments Submitted by L. Franklin, Old Dominion Electric Cooperative

Comments Submitted by J. Brannan, North Carolina Electric Membership Corporation

Comments Submitted by M. Desselle and C. Yeung, Southwest Power Pool

Comments Submitted by W. Bray, Arizona Electric Power Cooperative

Comments Submitted by R. Dietrich, Salt River Project Agricultural Improvement & Power District

Pipeline Collaborative Proposal - NAESB Timeline (See page 1 for Pipeline Sponsor Company Names)

7C (Intraday Nom Order 698 Workpaper) Submitted by D. Rudd, New Jersey Natural Gas

Comments Submitted by D. Lee, Freeport-McMoRan Copper & Gold

Comments Submitted by J. Glaubitz, Sacramento Municipal Utility District

Comments Submitted by J. Davis, Missouri Public Service Commission

Position Statement Submitted by B. Griffith, El Paso Pipeline Group

Letter Supporting Proposal for New Intra-Day Cycles Submitted by D. Gussow, FPL

Comments on FERC Order 698 – Intraday Nomination Timeline Proposals Submitted by S. Glaeser, Ameren Companies

Work Paper Submitted by M. Novak, National Fuel Gas Distribtion

Energy Day - 12 PM Gas Day vs Calendar Day Submitted by El Paso

Energy Day - 1 PM Gas Day vs Calendar Day Submitted by El Paso

(7C) Work Paper for Intraday Discussion Submitted by TVA and APS - 01/09/2008
February 21, 2008 WGQ BPS

Order 698 Meeting

Conference Call

With Web Conferencing
Agenda Final Minutes

Attachments to Meeting Minutes:

(7A) Modified and New Proposed Standards - Revised 02/21/2008 (Redline)

(7A) CORRECTED FILE: Approved Definitions, Modified and New Standards - 02/08/2008 and 02/21/2008
Annual Plan Item 7a:

(7A) Approved Definitions, Modified and New Standards - 02/08/2008

(7A) Modified and New Proposed Standards - Revised 02/08/2008 (Redline)

Modification to Proposed WGQ Standard No. 5.3.x2 (M. Shephard/M. Novak/M. Draemer)

Index Based Capacity Release Work Paper Submitted by M. Novak, National Fuel

(7A) Proposed Pipeline Modifications - 2/6/08

(7A) 114 FERC 61170 (Capacity Release Order) - Referenced by M. Goldenberg, FERC in Meeting

February 8, 2008 WGQ BPS

Order 698 Meeting

Conference Call

With Web Conferencing
Agenda Final Minutes

Attachments to Meeting Minutes:

(7A) Approved Definitions, Modified and New Standards - 02/08/2008

(7A) Modified and New Proposed Standards - Revised 02/08/2008
(Redline)
Annual Plan Item 7a:

(7A) Modified and New Proposed Standards and Definitions - Revised 01/10/2008
(Redline changes for 01/10/08 meeting ONLY)


(7A) Modified and New Proposed Standards and Definitions - Revised 01/10/2008
(Complete Redline)


(7A) Proposed Revisions to Draft Standards submitted by M. Shepard, Mewbourne Oil Company - 01/11/2008

(7a) Proposed Pipeline Modifications 2/6/08

(7A) Proposed Revisions to Draft Standards submitted by M. Novak, National Fuel
January 25, 2008 Correspondence between Kansas Corporation Commission and Michael Desselle, NAESB Board Chairman     Letter from Kansas Corporation Commission regarding Order No. 698

Response to Kansas Corporation Commission from Michael Desselle regarding Order No. 698
January 9-10, 2008 WGQ BPS

Order 698 Meeting

Houston, TX

New Location: Meeting will now be held at the Crowne Plaza Hotel

With Web Conferencing
Revised Agenda

Announcement
1/9/08 Final Minutes

1/10/08 Final Minutes

Attachments to Meeting Minutes:

(7A) Modified and New Proposed Standards and Definitions - Revised 01/10/2008
(Redline changes for 01/10/08 meeting ONLY)


(7A) Modified and New Proposed Standards and Definitions - Revised 01/10/2008
(Complete Redline)


(7B) Approved Standard - 01/09/2008

(7C) Work Paper for Intraday Discussion Submitted by TVA and APS
Nearby Hotels

Annual Plan Item 7a:

(7A) Proposed Revisions to Draft Standards submitted by M. Shepard, Mewbourne Oil Company - 12/07/2007

(7A) Modified and New Proposed Standards - Revised 12/04/2007

Annual Plan Item 7b:

(7B) Proposed Draft Standards - Revised 12/05/2007

Annual Plan Item 7c:

Work Paper for Intraday Discussion Submitted by TVA and APS
December 4-5, 2007 WGQ BPS

Order 698 Meeting

Washington, DC

Hosted by AGA

With Web Conferencing
Agenda

NOTE TIME CHANGE
Dec. 5

No lunch break will be taken and the meeting will conclude at 1:00pm (Eastern)
12/4/07 Final Minutes

12/5/07 Final Minutes

Attachments to Meeting Minutes:

Annual Plan Item 7a - Modified and New Proposed Standards - Revised 12/04/2007

Annual Plan Item 7b - Proposed Standard - Revised 12/05/2007

Meeting Arrangements

Work Paper on Issue 7b - Submitted by P. Love, NGPL and D. Rudd, New Jersey Natural Gas

Work Paper on Proposed Standard 7a - Submitted by J. Kardas, National Fuel Gas Supply Corporation

KeySpan’s Response to the Proposed Standard by National Fuel Gas Supply Corp (December 2) Submitted by D. Chezar, KeySpan

Redlines to 10/30/2007 Draft Minutes Submitted by D. Davis, Williams

Redlines to 10/31/2007 Draft Minutes Submitted by D. Davis, Williams

Redlines to 11/14/2007 Draft Minutes Submitted by D. Davis, Williams

Redlines to 11/15/2007 Draft Minutes Submitted by D. Davis, Williams

Work Paper Submitted by M. Novak, National Fuel

Additional Redlines to 11/14/07 Draft Minutes Submitted by V. Crockett, K. Van Pelt, K. Daly and D. Davis

Existing Nomination and Timeline Schedule Provided by D. Davis, Williams
November 14-15, 2007 WGQ BPS

Order 698 Meeting

New York, NY

Hosted by KeySpan

With Web Conferencing
Agenda 11/14/07 Final Minutes

11/15/07 Final Minutes

Attachments to Meeting Minutes:

Annual Plan Item 7b - Attributes of Additional Proposed Standards - Revised 11/14/2007

Annual Plan Item 7b - Examples from meeting - 11/14/2007

Annual Plan Item 7c - Timely Intraday Nomination Timeline (Redline/Clean) - Revised 11/14/2007

Annual Plan Item 7a - Modified and New Proposed Standards - Revised 11/15/2007

Annual Plan Item 7a - Examples from meeting - 11/15/2007
Meeting Announcement

7c Key Issues from 10/30/07 Submitted by V. Crockett, TVA

Annual Plan Item 7b - Attributes of Additional Proposed Standards - Revised 10/30/2007

Annual Plan Item 7c - Timely Intraday Nomination Timeline - Revised 10/30/2007

Annual Plan Item 7a - Modified and New Proposed Standards - Revised 10/31/2007

Annual Plan Item 7a - Additional Index Standard Concepts - Revised 10/31/2007

Annual Plan Item 7b - Proposed Redirect Language (Redline) - Revised 10/30/2007

Index Based Capacity Release Work Paper Submitted by M. Novak, National Fuel

Recommendation of Arizona Public Service Company to Order N0. 698 Directed Inquiry Into NAESB WGQ Intraday Nomination Timeline Submitted by K. Daly, APS

Platt's Presentation - Methodology and Specifications Guide

Platts' Presentation - A Primer on Platts Indexes and Assessments for North American Natural Gas and Electricity Markets
October 30-31, 2007 WGQ BPS

Order 698 Meeting

Houston, TX

Held at the NAESB Offices

13th Floor
San Jacinto Room

With Web Conferencing
Agenda 10/30/07 Final Minutes

10/31/07 Final Minutes

Attachments to Meeting Minutes:

Annual Plan Item 7b - Attributes of Additional Proposed Standards - Revised 10/30/2007

Annual Plan Item 7b - Proposed Redirect Language (Redline) - Revised 10/30/2007

Annual Plan Item 7c - Timely Intraday Nomination Timeline (Redline) - Revised 10/30/2007

Annual Plan Item 7c - Timely Intraday Nomination Timeline (Clean) - Revised 10/30/2007

Annual Plan Item 7a - Modified and New Proposed Standards - Revised 10/31/2007

Annual Plan Item 7a - Additional Index Standard Concepts - Revised 10/31/2007

NAESB WGQ Order 698 AP Item 7b Scoping Issues - Revised October 30, 2007
Nearby Hotels

Additional Index Standards Concepts

Timely / Intraday Nomination Timeline Submitted by V.Crockett, TVA

Annual Plan Item 7b Proposed Redirect Language Submitted by D.Rudd, NJNG

Annual Plan Item 7b - Scoping Issues

Index-Based Capacity Release - Bidding and Capacity Award Considerations - Submitted by M. Novak, National Fuel

Intraday Four (ID4) Strawman Work Paper - Revised October 9, 2007
October 9-10, 2007 WGQ BPS

Order 698 Meeting

Houston, TX

Held at the NAESB Offices

13th Floor
San Jacinto Room

With Web Conferencing
Agenda

Please note: Day 1 will now start at 9:00am (Central)
10/9/07 Final Minutes

10/10/07 Final Minutes

Attachments to Meeting Minutes:

Annual Plan Item 7b - Scoping Issues

Intraday four (ID4) Strawman work paper - Revised 10/09/2007

Additional Index Standards Concepts

Revised Annual Plan Item 7b - Scoping Issues
Nearby Hotels

Intraday four (ID4) Strawman work paper Submitted by V.Crockett, TVA

Index-Based Capacity Release - Bidding and Capacity Award Considerations - Submitted by M.Novak, National Fuel
September 18-19, 2007 WGQ BPS

Order 698 Meeting

Glen Allen, VA

Hosted by Dominion

With Web Conferencing
Agenda 9/18/07 Final Minutes

9/19/07 Final Minutes

Attachments to Meeting Minutes:

Annual Plan Item 7a - Scoping Issues

Annual Plan Item 7b - Scoping Issues

Proposed Modified WGQ Standard No. 5.3.26 - 09/18/2007
Meeting Arrangements and Nearby Hotels

Annual Plan Item 7a - Scoping Issues

Annual Plan Item 7b - Scoping Issues

Annual Plan Item 7c - Scoping Issues

Pipeline Segment Work Paper on Index-Based-Rate Capacity Release offers

Work Paper Submitted by D. Rudd, New Jersey Natural Gas Comany

Redlined Draft Minutes from August 30-31, 2007 - Submitted by D.Davis, Williams Gas Pipeline
August 30-31, 2007 WGQ BPS

Order 698 Meeting

Houston, TX

Held at the NAESB Offices

13th Floor
San Jacinto Room

With Web Conferencing
Agenda Corrected Final Minutes

Attachments to Meeting Minutes:

Annual Plan Item 7a - Scoping Issues

Annual Plan Item 7b - Scoping Issues

Annual Plan Item 7c - Scoping Issues
Nearby Hotels

Work Paper Submitted by D.Rudd, New Jersey Natural Gas Company

Late Work Paper Submitted by K. Burch, Spectra Energy

Late Work Paper Submitted by B. Griffith, El Paso Western Pipelines

Late Work Paper Submitted by M. Novak, National Fuel Gas Distribution Corporation

Order 698 - Potential Modifications to the Natural Gas Scheduling (Nomination) Timeline NAESB Report Submitted by V. Crockett, TVA - Revised

If you should encounter any problems or need further information, please call (713) 356-0060.
About NAESB | Contact NAESB | Email: naesb@naesb.org | Home Page

Copyright © 2007 North American Energy Standards Board, Inc. All rights Reserved.
This material may not be reproduced in any form without permission.