WEQ Final Actions - To be applied to Version 003 (previously considered 002.2) when Published
C11004 - Clarify if WEQ-001-9.1 can support a modification of only the source or sink for a long-term firm reservation. - Ratified March 26, 2012
WEQ 2012 Annual Plan Item 1.d - Revised Bulk Electric System Definition. - Ratified March 26, 2012
WEQ 2012 Annual Plan Item 5.e - Support Crediting Redirect Requests with the Capacity of the Parent Reservation. - Ratified March 26, 2012
WEQ 2011 Annual Plan Item 5.a/R08001/R08002/R08003/R08005 Final Action - Make consistency changes to Version 2.2. - Ratified November 28, 2011 (Minor Correction MC12003 Applied March 30, 2012)
WEQ 2011 Annual Plan Item 7.a - Review of standards 001-14.1.3 and 001-15.1.2 based on FERC Order No. 676-E . - Ratified November 28, 2011
2011 WEQ Annual Plan Items 2.a.iii.1 through 2.a.iii.3 Final Action – Service Across Multiple Transmission Systems (SAMTS). - Ratified August 11, 2011
2010 WEQ Annual Plan Item 4(d) Final Action: Business Practice Standards for Measurement and Verification of Energy Efficiency Products. - Ratified May 13, 2011
2010 WEQ Annual Plan Item 4(a) and 4(b) Final Action: Review and develop business practice standards to support DR and DSM-EE programs. - Ratified March 21, 2011
2010 WEQ Annual Plan Item 6(a)(ii) Final Action: Phase Two Requirements Specification for Common Electricity Product and Pricing Definition – for NIST PAP03. - Ratified March 21, 2011
2010 WEQ Annual Plan Item 6(a-c) Final Action: Master Data Elements List for Business Practice Standards associated with NIST PAP 03 and PAP 09. - Ratified March 21, 2011
2010 WEQ Annual Plan Item 6(b)(ii) Final Action: Phase Two - Requirements Specifications for Common Schedule Communication Mechanism for Energy Transactions – for NIST PAP04. - Ratified March 21, 2011
2010 WEQ Annual Plan Item 6(c)(ii) Final Action: Phase Two Requirements Specification for Wholesale Standard DR Signals – for NIST PAP09. - Ratified March 21, 2011
2010 WEQ Annual Plan Item 1(a)(i) Final Action: Interim Solution for Parallel Flow Visualization. - Ratified December 6, 2010
2010 WEQ Annual Plan Item 6(d) Final Action: Business Practices and Information Models to Support Priority Action Plan 10 – Standardized Energy Usage Information. - Ratified November 29, 2010
2010 WEQ Annual Plan Item 6(a) Final Action: Requirements Specifications for Common Electricity Product and Pricing Definition – for NIST PAP03. - Ratified August 20, 2010
2010 WEQ Annual Plan Item 6(b) Final Action: Requirements Specifications for Common Scheduling Mechanism for Energy Transactions – for NIST PAP04. - Ratified August 20, 2010
2010 WEQ Annual Plan Item 6(c) Final Action: Requirements Specifications for Wholesale Standard DR Signals – for NIST PAP09. - Ratified August 20, 2010
WEQ 2009 AP Items 5.a.2 (R08004) and 5.i (R09011) Final Action: - Multiple Annual Plan Items Affecting WEQ-011 Gas/Electric Coordination. - Ratified July 15, 2010
Attachment: WEQ 2009 AP Items 5.a.2 (R08004) and 5.i (R09011) Final Action: - Multiple Annual Plan Items Affecting WEQ-011 Gas/Electric Coordination. - Ratified July 15, 2010
2009 WEQ Annual Plan Item 5.b Final Action: Modify NAESB definitions to address internal inconsistencies and inconsistencies with the NERC glossary. - Ratified March 24, 2010
2009 WEQ Annual Plan Item 1.a, 3.a.vii/R05020 Final Action: Modifications to WEQ-004 Coordinate Interchange. - Ratified December 14, 2009
2009 WEQ Annual Plan Item 1.a, 3.a.vii/R05020 Final Action: Modifications to WEQ-004 Coordinate Interchange - Attachment
2009 WEQ Annual Plan Item 2.a.ii.3 Final Action: Rollover Rights on Redirect on a Firm Basis - Ratified July 27, 2009
2009 WEQ Annual Plan Item 3(d) Final Action: Order 717, Standards of Conduct - Ratified June 15, 2009
2008 WEQ Annual Plan Item 5(a) Final Action: Review and develop business practice standards to support DR and DSM-EE programs. - Ratified March 16, 2009
WEQ Final Actions - Published on March 11, 2009 and referenced in Version 002.1 of the WEQ Standards
WEQ Final Actions Version 002.1 Business Practice Standards
2008 WEQ Annual Plan Items 6(m)/R07007 Final Action: (Update the Timing Table to Reflect the Categories (On-time, Late, After-the-fact, and Pre-late) used in the latest E-Tag Specification with respect to receipt of an Arranged Interchange (RFI)). - Ratified March 11, 2009
2008 WEQ Annual Plan Items 2.a.iv.3, 3.a.vii and 6l (Part 1) Final Action: Rollover Rights on Redirect on a Firm Basis (Part 1). - Ratified January 12, 2009
2008 WEQ Annual Plan Items 1.a.ii Final Action: Continuous Support of TLR Procedure in Alignment with NERC Efforts on Phase II and Phase III DRAFT. - Ratified January 12, 2009
2008 WEQ Annual Plan Items 2.b.iii.1-3 Final Action: Capacity Benefit Margin (CBM). - Ratified December 15, 2008
WEQ Final Actions - Published on September 30, 2008 and referenced in Version 002.0 of the WEQ Standards
WEQ Final Actions Version 002.0 Business Practice Standards
2008 WEQ Annual Plan Item 2.a.i.2/2008 WEQ Annual Plan Item 2.a.vii.1 Final Action: Conditional Firm Business Practice Standards associated with S&CP Requirements completed in 2008 AP 2(a)(i)(1) and Tagging for Conditional Service (Additional changes to Rollover templates). - Ratified September 25, 2008
2008 WEQ Annual Plan Item 6.a/R07019 Final Action: Review/revised WEQ-006 to remove/revise mandatory requirements for Interconnection Time Monitor. - Ratified September 22, 2008
2008 WEQ Annual Plan Item 2.b.ii.2 Final Action: Postbacks and Counterflows Business Practice Standards. - Ratified September 22, 2008
2008 WEQ Annual Plan Item 2.a.iv.4, 2.a.vi.4, and 2.b.ii.1 Final Action: Existing Transmission Commitments. - Ratified September 22, 2008
2008 WEQ Annual Plan Item 6.d Final Action: Modify WEQ-001 to reflect in the definition of certain ancillary services that such ancillary services may be provided by non-generation resources such as demand resources. - Ratified September 22, 2008
2008 WEQ Annual Plan Items 2.a.i.4, 2.b.v.4, and 2.b.v.5 - Load Forecast and Actual Load Business Practice Standards associated with S&CP changes. - Ratified July 23, 2008
2008 WEQ Annual Plan Item 2.b.vii Final Action: WEQ-001 changes for “ATC Information Link” on OASIS and TTC and ATC methodologies and values. - Ratified June 27, 2008
2008 WEQ Annual Plan Item 2.a.i.5, 2.a.i.6, 2.a.ii.1-3 Final Action: WEQ-001 changes for Rebid of Partial Service, Preconfirmation Priority, and Group 2: Metrics; Redispatch Cost Posting. - Ratified June 23, 2008 - Minor Correction Applied September 10, 2008
2008 WEQ Annual Plan Item 2.b.v.3 and 2008 WEQ Annual Plan Item 2.a.i.3 Final Action: "ATC/TTC Narratives" - Ratified May 16, 2008
2007 WEQ Annual Plan Item 5 and 2007 WGQ Annual Plan Item 8 Final Action: “Develop business practices as needed to support the e-Tariff program including submittal of tariffs and metadata". - Ratified April 4, 2008
2007 WEQ Annual Plan Item 5 and 2007 WGQ Annual Plan Item 8 Final Action - Attachment
2008 Annual Plan Item 2(i)7 Final Action - OASIS Exemptions Appendix C - Ratified March 13, 2008
2008 Annual Plan Item 2(i)7 Final Action - Attachment
2007 WEQ Annual Plan item 2(ii) Final Action: Group 1: Conditional Firm, Annotations For ATC; Load Forecast And Actual Load; Re-Bid Of Partial Service; And Preconfirmation Priority - Ratified February 29, 2008 - Minor Correction Applied to Attachments February 27, 2008
2007 WEQ Annual Plan item 2(ii) Final Action: Attachment 1-OASIS S&CPs (WEQ-002) - Minor Correction Applied February 27, 2008 and September 10, 2008
2007 WEQ Annual Plan item 2(ii) Final Action: Attachment 2-OASIS Data Dictionary (WEQ-003)
2007 WEQ Annual Plan item 2(ii) Final Action: Attachment 3-OASIS Implementation Guide (WEQ-013) - Minor Correction Applied February 27, 2008 and September 10, 2008
C07001 Final Action: Interpretation of WEQ-011-1.2 - Ratified December 19, 2007
2007 WEQ Annual Plan Item 2(c) Final Action: Order 890 modifications to WEQ-001 - Ratified December 19, 2007 - Minor Correction Applied to Attachment February 27, 2008
2007 WEQ Annual Plan Item 2(c) Final Action: Attachment - Minor Correction Applied February 27, 2008
WEQ Final Actions - Published on October 31, 2007 and referenced in Version 001 of the WEQ Standards
WEQ Final Actions Version 001 Business Practice Standards
R06025 Final Action - Modify Appendix D of WEQ 004 to add an explanation for the terms “required” and “correctable”, to add a sentence clarifying that tag data elements are not correctable and are not required, and to make the element of energy Product Type required as revised by the WEQ Executive Committee on August 14, 2007 - Ratified October 4, 2007
R05018 Final Action - Revise the e-Tag Specification to allow PSEs associated with a transmission segment in the tag optional approval rights - Ratified September 17, 2007
Final Action R06026/WEQ 2007 Annual Plan Item 1(b) - Revise WEQ-004 Coordinate Interchange Business Practice Standard requirement 2.2 and the table contained in Appendix A, part B, to exempt the WECC - Ratified September 17, 2007
Final Action R06026/WEQ 2007 Annual Plan Item 1(b) Attachment
R07002 Final Action - Division of OASIS Standards and Communication Protocols (S&CP, WEQ 002, WEQ 003) - Ratified September 17, 2007
R07002 Final Action Attachment 1 - Revisions to S&CPs
R07002 Final Action Attachment 2 - Revisions to Data Dictionary
R07002 Final Action Attachment 3 - implementation Guide
2007 WEQ Annual Plan Item 2 Final Action - Recommendation for Revision to Final Action R04006D to align the Resales Standards with Order 890 - Ratified July 23, 2007
2007 WEQ Annual Plan Item 3(a)(2) Final Action - Recommendation for 2007 WEQ Annual Plan Item 3(a)(2) - Implementation of S&CP changes to support Standards of Conduct business practices
- Ratified April 7, 2007
2007 WEQ Annual Plan Item 3 (a)(2) Final Action Attachment
R04006C1 Final Action - Recommendation R04006C1 - OASIS 1A Enhancements – Redirects (Release Mechanism)- Ratified April 7, 2007.
R05001 Final Action - Recommendation - Amend WEQ R03013 to Align Coordinate Interchange Transactions with Version 0 (Ratified June 22, 2006) - Minor Correction Applied March 20, 2007.
R05001 Final Action Attachment - Permanent Numbering Applied November 16, 2006 - Minor Correction Applied March 20, 2007
R03007 and WEQ 2006 Annual Plan Item (3)(iii) Final Action - WEQ Public Key Infrastructure (PKI) Standards - Ratified February 10, 2007.
2006 WEQ Annual Plan Item 3 (c)(i) Final Action - Ratified October 2, 2006.
R04006D Final Action - Develop OASIS Phase 1A business practices. - Ratified October 2, 2006.
R04036 Final Action - Amend definitions, terms and numbering of WEQ Order 2004 (affiliate) standards. - Ratified October 2, 2006.
R06002 Final Action - Recommendation - Modify NAESB pre-split Version 0 TLR business practices to remain consistent with NERC IRO-006-1 pre-split TLR reliability standards (inclusion of market flows). - Ratified September 1, 2006. - Minor Correction Applied 09/17/2007.
R06002 Final Action Attachment - Minor Correction Applied 09/17/2007.
R05001 Final Action - Recommendation - Amend WEQ R03013 to Align Coordinate Interchange Transactions with Version 0 - Ratified June 22, 2006.
R05001 Final Action Attachment - Permanent Numbering Applied November 16, 2006
R05007 Final Action - Recommendation - Review of NAESB WEQ "Version 0" Business Practice Standards and remove any references to ERCOT. - Ratified June 22, 2006.
R04013A Final Action - Recommendation for Development of post-split "Version 0" Transmission Loading Relief (TLR) Business Practice Standard - Ratified April 10, 2006.
R04013A Final Action Attachment- Development of post-split "Version 0" Transmission Loading Relief (TLR) Business Practice Standard
R04035/R05002 Final Action - Revisions to OASIS for Redirects - Ratified January 5, 2006.
R04035/R05002 Final Action Attachment 1 - Appendix B
R04035/R05002 Final Action Attachment 2
R05009 Final Action - Modifications to Transmission Loading Relief (TLR) for Dynamic Schedules - Ratified October 10, 2005.
R04021 Final Action (Corrected with Permanent Numbers Applied) - Gas/Electric Coordination - Ratified July 8, 2005.
WEQ Final Actions - Published on January 18, 2005 and referenced in Version 0 of the WEQ Standards
WEQ Final Actions Version 0 Business Practice Standards
R04013 Final Action -Version 0 Business Practices Standards - Ratified December 31, 2004.
R04013 Final Action - Attachment 1 - Coordinate interchange - Ratified December 31, 2004.
R04013 Final Action - Attachment 2 - ACE Special Cases - Ratified December 31, 2004.
R04013 Final Action - Attachment 3 - Manual Time Error Correction - Ratified December 31, 2004.
R04013 Final Action - Attachment 4 - Inadvertent Interchange - Ratified December 31, 2004.
R04013 Final Action - Attachment 5 - Transmission Loading Relief (Eastern Interconnection) - Ratified December 31, 2004.
WEQ Final Actions OASIS
R04005A Final Action - OASIS Baseline Cleanup - Ratified December 30, 2004.
R04006A Final Action - OASIS 1A Enhancements - Standards of Conduct - Ratified December 30, 2004.
R04006B Final Action - OASIS 1A Enhancements - Multiple Requests - Ratified December 30, 2004.
R04006C Final Action - OASIS 1A Enhancements - Redirects - Ratified December 30, 2004.
R04011 Final Action - OASIS Requirements for FERC Order No. 2003 - Generation Interconnection - Ratified December 30, 2004.
FTAA Final Action - Ratified July 21, 2004.
R03013 Final Action - Ratified June 21, 2004.
R03013 Final Action Attachment 1 - Data Sheet
R03013 Final Action Attachment 2 - Timetable
R03013 Final Action Attachment 3 - Flow Diagram
R04005 Final Action - Ratified April 7, 2004.
R04005 Final Action Attachment 1
|