Click Here To Return to the WEQ Home Page

Wholesale Electric

Retail ElectricWholesale GasRetail Gas
 


Search | What's Hot? | Press Release | Home  
 
WEQ Electronic Scheduling Subcommittee
 
WEQ Electronic Scheduling Subcommittee:


Procedures for ESS Interactive List Serv (Exploder)
WEQ Electronic Scheduling Subcommittee Mission Statement

Link to Joint WEQ BPS/ESS/ITS Meetings on ATC/AFC

WEQ ESS/ITS Progress Report - as of 12/08/08
  
Please note that we have started posting all files in editable format. If you experience problems accessing the formatted document, please call the NAESB office (713-356-0060) and it will be provided to you in Adobe Acrobat (pdf) format.

Date Event/Location Agenda Minutes Misc.
January 7, 2009 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda   C. Bigelow Concepts

Motions

Parking Lot

NITS Types of Transactions

Otondo Recommendation - Clean - 11/14/08

Bigelow Concepts with Cites

P. Sorenson NITS Application Concepts as amended on October 16, 2008

Draft V002 - NITS Interaction Specification - Submitted by G. Gilbert

OASIS WEQ-002 August 2008 - Redlined

Technical Concepts for NITS - 10/29/08

OASIS WEQ-002 August 2008 - Redlined

Pro Forma Application Items - 9/19/08

NITS White Paper Submitted by G. Ridgely, Midwest ISO

Naming Conventions and DNR Application Input Table
December 15-16, 2008 WEQ ESS/ITS

Please note new meeting location: New Orleans, LA

Hosted by Entergy

With Web Conferencing provided by Entergy
Agenda Agenda - as revised during the meeting Nearby Hotels

C. Bigelow Concepts

Motions

Parking Lot

NITS Types of Transactions

Otondo Recommendation - Clean - 11/14/08

Bigelow Concepts with Cites

P. Sorenson NITS Application Concepts as amended on October 16, 2008

Draft V002 - NITS Interaction Specification - Submitted by G. Gilbert

OASIS WEQ-002 August 2008 - Redlined

Technical Concepts for NITS - 10/29/08

OASIS WEQ-002 August 2008 - Redlined

Pro Forma Application Items - 9/19/08

NITS White Paper Submitted by G. Ridgely, Midwest ISO
December 4, 2008 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Agenda - as revised during the meeting

Order 890 Work Plan - Clean - August 2008

A. Pritchard Document

C. Bigelow Concepts

Motions

Parking Lot
NITS Combined Parking Lot

Motions as of 11/14/08

NITS Types of Transactions

A. Pritchard document - 11/14/08

Otondo Recommendation - Clean - 11/14/08

Bigelow Concepts Matrix Discussed 11/14/08

Bigelow Concepts with Cites

P. Sorenson NITS Application Concepts as amended on October 16, 2008

Draft V002 - NITS Interaction Specification - Submitted by G. Gilbert

OASIS WEQ-002 August 2008 - Redlined

Technical Concepts for NITS - 10/29/08

OASIS WEQ-002 August 2008 - Redlined

Pro Forma Application Items - 9/19/08

NITS White Paper Submitted by G. Ridgely, Midwest ISO
November 12-14, 2008

Please note new meeting dates
WEQ ESS/ITS

Houston, TX

Held at the NAESB office

With Web Conferencing
Agenda Agenda - as revised during the meeting

Motions as of 11/14/08

NITS Types of Transactions

A. Pritchard document - 11/14/08

Otondo Recommendation - Clean - 11/14/08

NITS Parking Lot - 11/14/08

Bigelow Concepts Matrix Discussed 11/14/08

Bigelow Concepts with Cites
Nearby Hotels with 2008 Rates

P. Sorenson NITS Application Concepts as amended on October 16, 2008

Draft V002 - NITS Interaction Specification - Submitted by G. Gilbert

O2 Architecture - Submitted by B. Rehman, BPA

O2 Scope - Submitted by B. Rehman, BPA

O2 Vision - Submitted by B. Rehman, BPA

O2 NOPR - Submitted by B. Rehman, BPA

OASIS WEQ-002 August 2008 - Redlined

Technical Concepts for NITS - 10/29/08

Parking Lot - Part 2 - 10/29/08

OASIS WEQ-002 August 2008 - Redlined

NITS Motions - October 16, 2008

NITS Types of Transaction

Pro Forma Application Items - 9/19/08

NITS Concepts with Order Cites - Submitted by C. Bigelow

INDEX NITS Concepts - Submitted by C. Bigelow

Concepts for NITS on OASIS Matrix - Submitted by C. Bigelow

Draft NITS Recommendation (Redline) - Submitted by M. Otonto

Draft NITS Recommendaiton (Clean) - Submitted by M. Otonto

Revised NITS on OASIS Parking Lot

Comments on Resales Submitted by K. Gresh, PJM

NITS on OASIS - Types of Transaction - Updated

Work Paper Submitted by A. Pritchard, Duke Energy

NITS White Paper Submitted by G. Ridgely, Midwest ISO
October 29, 2008 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes

Agenda - as revised during the meeting

Technical Concepts for NITS - 10/29/08

Parking Lot - Part 2 - 10/29/08

OASIS WEQ-002 August 2008 - Redlined
NITS Motions - October 16, 2008

NITS Types of Transaction

NITS Concepts - Revised 10/1/08

Pro Forma Application Items - 9/19/08

NITS Concepts with Order Cites - Submitted by C. Bigelow

INDEX NITS Concepts - Submitted by C. Bigelow

Concepts for NITS on OASIS Matrix - Submitted by C. Bigelow

Draft NITS Recommendation (Redline) - Submitted by M. Otonto

Draft NITS Recommendaiton (Clean) - Submitted by M. Otonto

Draft V002 - NITS Interaction Specification - Submitted by G. Gilbert
October 15-16, 2008 WEQ ESS/ITS

Norristown, PA

Hosted by PJM Interconnection

With Web Conferencing and Audio provided by PJM
Agenda Agenda - as revised during the meeting

NITS Motions - October 16, 2008

P. Sorenson NITS Application Concepts as amended on October 16, 2008
Nearby Hotels

Audio and Web Cast details as provided by PJM

NITS Types of Transaction

NITS Concepts - Revised 10/1/08

NITS Motions - Revised 9/18/08

Pro Forma Application Items - 9/19/08

NITS Displace Concepts from OATI

NITS Concepts with Order Cites - Submitted by C. Bigelow

INDEX NITS Concepts - Submitted by C. Bigelow

Concepts for NITS on OASIS Matrix - Submitted by C. Bigelow

Draft NITS Recommendation (Redline) - Submitted by M. Otonto

Draft NITS Recommendaiton (Clean) - Submitted by M. Otonto

Draft V002 - NITS Interaction Specification - Submitted by P. Sorenson

NITS Application Concept - Conf. Call Suggestions - Submitted by P. Sorenson
October 1, 2008 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Agenda - as revised during the meeting

NITS Types of Transaction

NITS Concepts - Revised 10/1/08

NITS Parking Lot - Revised 10/1/08
NITS Motions - Revised 9/18/08

NITS Parking Lot - Revised 9/19/08

NITS Concepts - Revised 9/19/08

Pro Forma Application Items - 9/19/08

NITS Displace Concepts from OATI

Draft NITS Recommendation Submitted by M. Otondo, APS
September 17-19, 2008 WEQ ESS/ITS

Phoeniz, AZ

Hosted by Salt River Project

With Web Conferencing provided by Salt River Project
Agenda NITS Concepts - Revised 9/17/08

NITS Motions - Revised 9/17/08

NITS Concepts - Revised 9/18/08

NITS Motions - Revised 9/18/08

NITS Parking Lot - Revised 9/19/08

NITS Concepts - Revised 9/19/08

Pro Forma Application Items - 9/19/08
General

Meeting Arrangements

Nearby Hotels

Web Cast details as provided by SRP

Annual Plan Items

WEQ 2008 Annual Plan Item 6.h Recommendation

WEQ 2008 Annual Plan Item 3.a.vi.3 Recommendation

WEQ 2008 Annual Plan Item 6.j Recommendation

WEQ 2008 Annual Plan Item 6.k Recommendation

WEQ 2008 Annual Plan Item 3.a.i Recommendation

Other Business

Proposal to Transfer e-Tag Specifications and Schema from NERC to NAESB with the ESS/ITS

NITS

NITS Motions

NITS Concepts

NITS Parking Lot

NITS Displace Concepts from OATI

Draft NITS Recommendation Submitted by M. Otondo, APS
September 3, 2008 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes

Agenda - as revised during the meeting

Rollover of Redirects Motions

Motion 11 Proposed Language

Rollover of Redirects Parking Lot

Rollover of Redirects Concepts
Draft Recommendation - 2008 AP item 2(a)(iv)(3),3(a)(vii),6(l) - Rollover Rights on Redirect on a Firm Basis

Rollover of Redirect Parking Lot - 8/22/08

Rollover of Redirect Concepts

Rollover of Redirect Motions - 8/22/08

SRP Modifications to Y3
August 20-22, 2008 WEQ ESS/ITS

Colorado Springs, CO

Hosted by El Paso

With Web Conferencing
Agenda

Please note that the meeting time for August 22, 2008 has been changed to 9:00am to Noon (Mountain)

Attachments:
Rollover of Redirects Parking Lot


Rollover of Redirects Concepts

Rollover of Redirects Motions

Response to Comments Submitted by R. Martinko, FirstEnergy Service Company
General

Nearby Hotels

Other Business

Proposal to Transfer e-Tag Specifications and Schema from NERC to NAESB with the ESS/ITS

NITS

NITS Motions

NITS Concepts

NITS Parking Lot

NITS Displace Concepts from OATI

Rollover of Redirects

2008 AP Item 2(a)(iv)(3)Recommendation - Rollover Rights on Redirect on a Firm Basis

Comments Submitted by J. Dison, Southern Company Generation

Comments File 1 Submitted by E. Davis, Entergy

Comments File 2 Submitted by E. Davis, Entergy

Comments Submitted by B. Rehman, BPA

Rollover of Redirects Motions (Revised 7/15/08)

Comments Submitted by R. Martinko, FirstEnergy Service Company

Comments Submitted by C. Wesley, PJM

Comments Submitted by B. Green, EPSA

Comments Submitted by R. Lamoureux, Midwest ISO and C. Yeung, SPP
July 18, 2008 Request for Informal Comments
Due
August 15, 2008
    Request for Informal Comments due August 15, 2008

2008 AP Item 2(a)(iv)(3)Recommendation - Rollover Rights on Redirect on a Firm Basis

Comments Submitted by J. Dison, Southern Company Generation

Comments File 1 Submitted by E. Davis, Entergy

Comments File 2 Submitted by E. Davis, Entergy

Comments Submitted by B. Rehman, BPA

Comments Submitted by R. Martinko, FirstEnergy Service Company

Comments Submitted by C. Wesley, PJM

Comments Submitted by B. Green, EPSA

Comments Submitted by R. Lamoureux, Midwest ISO and C. Yeung, SPP
July 15-16, 2008 WEQ ESS/ITS

Carmel, IN

Hosted by Midwest ISO

With Web Conferencing provided by Midwest ISO
Agenda General

Agenda - as revised during the meeting

Rollover of Redirects

Rollover of Redirects Motions (Revised 7/15/08)

Rollover of Redirects Draft Recommendation (Revised 7/15/08)

Rollover of Redirects BPA Comments - Subcommittee Response

Rollover of Redirects Midwest ISO - Subcommittee Response

Rollover of Redirects Concepts (Revised 7/15/08)

Rollover of Redirects Recommendation as discussed on 7/16/08
General

Directions to Midwest ISO

Nearby Hotels

Web Cast Information Provided by Midwest ISO

Midwest ISO Meeting Registration Link

Parking Lot General

Rollover of Redirects

Rollover of Redirects Parking Lot

Rollover of Redirects Draft Recommendation

Rollover of Redirects Response to Southern

Rollover of Redirects Concepts

Rollover of Redirects Comments of BPA

Rollover of Redirects Comments of PJM

Rollover of Redirects Comments of APS

Rollover Redirects Late Comments of SOCO

Rollover of Redirects Comments of Midwest ISO

Rollover of Redirects Motions

Update to Redirect Recommendation Submitted by P. Sorenson, OATI

NITS

NITS Motions

NITS Concepts

NITS Parking Lot

NITS Displace Concepts from OATI

Minor Corrections Submitted to the EC

Minor Corrections Submitted by OATI

Minor Corrections Submitted by BPA
June 23-24, 2008 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda

The agenda items were not completed on June 23 so the meeting will continue June 24 from 9am - 3pm Central
Final Minutes

Attachments:
CCO Motions - 6/24/04


CCO Parking Lot - 6/24/08

Agenda - as Revised during the meeting
NITS Concepts - 3/24/08

CCO Recommendation - 6/18/08 - Submitted by P. Sorenson, OATI

CCO Recommendation - 6/18/08 - Submitted by M. Otondo, APS

Conditional Firm Parking Lot - Revised 6/11/08

Conditional Firm Motions - Revised 6/11/08

CCO Parking Lot - Revised 6/23/08

CCO Motions - Revised 6/23/08

M. Otondo CCO Recomendation with Southern Changes - Submitted by JT Wood, Southern

CCO Recomendation with Southern Changes Revised
June 23, 2008 Joint NERC/NAESB ESS/ITS

Conference Call

With Web Conferencing
CANCELLED    
June 10-11, 2008 WEQ ESS/ITS

Charlotte, NC

Hosted by Duke

With Web Conferencing provided by Duke
Agenda Final Minutes

Agenda - as Revised during the meeting

2008 AP 2.a.i.2 and 2008 AP 2.a.vii.1 Conditional Firm Business Practice Standards

Conditional Firm Parking Lot - Revised 6/11/08

Conditional Firm Motions - Revised 6/11/08
General

Meeting Arrangements

Web Cast Information

Conditional Firm

2008 AP 2.a.i.2 and 2008 AP 2.a.vii.1, Conditional Firm Business Practice Standards associated with S&CP Requirements completed in 2008 AP 2(a)(i)(1)Conditional Firm Recommended Standard

Comments Submitted by P. Sorenson, OATI

Comments Submitted by W. Weathers, SRP

Comments Submitted by B. Rehman, BPA

Comments Submitted by M. Otondo, APS

Comments Submitted by B. Green, EPSA

Comments Submitted by R. Lamoureux and E. Skiba, Midwest ISO

Comment file 1 Submitted by N. McIntire, American Wind Energy Association

Comment file 2 Submitted by N. McIntire, American Wind Energy Association

Comments Submitted by A. Pritchard, Duke Energy

Comments Submitted by C. Wesley, PJM

Conditional Firm Issues

Conditional Firm Motions

Conditional Firm Parking Lot

Late Comments Submitted by N. Saini, Entergy

Late Comments Submitted by JT Wood, Southern Company

Comments Submitted by B. Weber, PacifiCorp

Conditional Firm Recommended Standard with SRP Comments - Revised June 10, 2008

Rollover of Redirects

Rollover Recommendation Revised 04/04/08

ESS/ITS Response to Rollover Comments of Southern Generation

Rollover of Redirects Concepts

Comments Submitted by B. Rehman, BPA

Comments Submitted by P. Brown, PJM

Comments Submitted by M. Otondo, APS

Late Comments Submitted by JT Wood, Southern Company Transmission
May 30, 2008 Request for Informal Comments
Due
June 6, 2008
    Request for Informal Comments due June 6, 2008

2008 AP 2.a.i.2 and 2008 AP 2.a.vii.1, Conditional Firm Business Practice Standards associated with S&CP Requirements completed in 2008 AP 2(a)(i)(1)Conditional Firm Recommended Standard

Comments Submitted by P. Sorenson, OATI

Comments Submitted by W. Weathers, SRP

Comments Submitted by B. Rehman, BPA

Comments Submitted by M. Otondo, APS

Comments Submitted by B. Green, EPSA

Comments Submitted by R. Lamoureux and E. Skiba, Midwest ISO

Comment file 1 Submitted by N. McIntire, American Wind Energy Association

Comment file 2 Submitted by N. McIntire, American Wind Energy Association

Comments Submitted by A. Pritchard, Duke Energy

Comments Submitted by C. Wesley, PJM

Late Comments Submitted by N. Saini, Entergy

Late Comments Submitted by JT Wood, Southern Company

Comments Submitted by B. Weber, PacifiCorp
May 27-28, 2008

Please note this is now a two day meeting
WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes

Agenda - as Revised during the meeting

Conditional Firm Issues

Conditional Firm Motions

Conditional Firm Parking Lot

Technical specs from P. Sorenson as edited by ESS-ITS on 5/28/08
Conditional Firm

CCO - 5/22/08

Conditional Firm Issues - 5/22/08

Conditional Firm Motions - 5/22/08

Conditional Firm Parking Lot - 5/22/08

Transfers Resale and Redirects of CF Submitted by A. Pritchard, Duke Energy

Conditional Firm Recommendation - 5/27/08 - Redline

Conditional Firm Recommendation - 5/27/08 - Clean

Paragraphs 980 and 981

CCO Tech Updates Submitted by P. Sorenson, OATI

CCO Tech Updates - Comments Submitted by G. Gilbert, Southern Company

Rollover of Redirects

Rollover Recommendation Revised 04/04/08

ESS/ITS Response to Rollover Comments of Southern Generation

Rollover of Redirects Concepts

Comments Submitted by B. Rehman, BPA

Comments Submitted by P. Brown, PJM

Comments Submitted by M. Otondo, APS

Late Comments Submitted by JT Wood, Southern Company Transmission
May 21-22, 2008 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes

Agenda - as revised in the meeting

CCO - 5/22/2008

Conditional Firm Issues - 0/22/08

Conditional Firm Motions Page - 5/22/08

Conditional Firm Parking Lot - 5/22/08
Conditional Firm

Conditional Firm Recommendation as Revised 5/5/08 - Submitted by P. Sorenson, OATI

Additional OATI Comments on Conditional Firm Recommendation as Revised 5/5/08 concentrating on old "Section 6"

Comments on CCO required Changes to S&CP - 5/5/08 - Submitted by P. Sorenson, OATI

Comments on CCO required Changes to S&CP - 5/5/08 by P. Sorenson- Submitted by N. McIntire

Conditional Firm Recommendation as Revised 5/21/08

Rollover of Redirects

Rollover Recommendation Revised 04/04/08

ESS/ITS Response to Rollover Comments of Southern Generation

Rollover of Redirects Concepts

Comments Submitted by B. Rehman, BPA

Comments Submitted by P. Brown, PJM

Comments Submitted by M. Otondo, APS

Late Comments Submitted by JT Wood, Southern Company Transmission
May 7, 2008 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes

Agenda - as revised in the meeting

Conditional Firm Issues Revised

Conditional Firm Motion Page
NITS

NITS Concepts - 3/24/08

Conditional Firm

Conditional Firm Recommendation as Revised 5/5/08 - Submitted by P. Sorenson, OATI

Additional OATI Comments on Conditional Firm Recommendation as Revised 5/5/08 concentrating on old "Section 6"

Comments on CCO required Changes to S&CP - 5/5/08 - Submitted by P. Sorenson, OATI

Comments on CCO required Changes to S&CP - 5/5/08 by P. Sorenson- Submitted by N. McIntire
April 29-30, 2008

Please note this is now a 2 day meeting
WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes

Proposed CF Standard at COB 4/29/2008

4/29/08 Revised Agenda

Conditional Firm Motion Page

Conditional Firm Parking Lot

Conditional Firm Recommendation as revised 4/30/08

ESS/ITS General Parking Lot
Conditional Firm

CCO Option 1 Revised S&CP 4/14/08 Sumbitted by P. Sorenson, OATI

CCO Option 2 Revised S&CP 4/14/08 Sumbitted by P. Sorenson, OATI

CCO Option 3 Revised S&CP 4/14/08 Sumbitted by P. Sorenson, OATI

PRS Revised OATI and WestConnect CCO Recommendation - 04/24/08

Comments Submitted by N. McIntire, American Wind Energy Association

Comments Submitted by K. Gresh, PJM

Comments Submitted by E. Skiba, Midwest ISO - File 1

Comments Submitted by E. Skiba, Midwest ISO - File 2

Comments Submitted by B. Rehman, BPA

ESS/ITS CF Motion Page

Conditional Firm Issues - Revised

Proposed Revisions WEQ-001 Appendix C

Revised CCO Recommendation - 04/25/08 - Submitted by B. Harshbarger, Puget Sound

Draft LT PTP Process - 4/27/08 - Submitted by B. Harshbarger, Puget Sound

Comments Submitted by W. Weathers, SRP (Redlines incorporated with those of P. Sorenson and B. Harshbarger)

SOCO Comments for Conditional Firm Submitted by J. Woods

Comments Submitted by B. Rehman, BPA on P. Sorenson's Latest CF.

Rollover of Redirects

Rollover Recommendation Revised 04/04/08

ESS/ITS Response to Rollover Comments of Southern Generation

Rollover of Redirects Concepts

Comments Submitted by B. Rehman, BPA

Comments Submitted by P. Brown, PJM

Comments Submitted by M. Otondo, APS

Late Comments Submitted by JT Wood, Southern Company Transmission

Formal Comments on WEQ-001

Annual Plan Items 2.a.ii.1-3 Recommendation (Clean)

Annual Plan Items 2.a.ii.1-3 Recommendation (Redlined)

Comments Submitted by NAESB Joint WEQ ESS/ITS/BPS Subcommittees

Comments Submitted by R. Lamoureux, Midwest ISO

Comments Submitted by P. Brown, PJM

Comments Submitted by NAESB WEQ Standards Review Subcommittees

Comments Submitted by B. Rehman, BPA

Late Comments Submitted by JT Wood, Southern Company

General

Parking Lot - General - ESS/ITS - Revised

HOW Response to 605 - 9/23/99 - Submitted by B. Rehman, BPA

FERC on Curtailment Postings - Submitted by B. Rehman, BPA
April 15, 2008 WEQ ESS/ITS

Charlotte, NC

Hosted by Duke

With Web Conferencing provided by Duke
Revised Agenda Final Minutes

Parking Lot - General - ESS/ITS - Revised

ESS/ITS CF Motion Page

Agenda as Approved

Conditional Firm Issues - Revised
Meeting Arrangements

Conditional Firm Issues - 4/4/08

April 4, 2008 OATI + WC Conditional Firm

Parking Lot - General - ESS/ITS

Rollover Recommendation Revised 04/04/08

ESS/ITS Response to Rollover Comments of Southern Generation

Rollover of Redirects Concepts

Proposed Revisions WEQ-001 Appendix C
April 4, 2008 Request for Comments Due April 11, 2008     Request for Comments Due April 11, 2008

April 4th 2008 OATI + WC Conditional Firm Draft Standard

WEQ ESS/ITS Conditional Firm Issues

Comments Submitted by N. McIntire, American Wind Energy Association

Comments Submitted by K. Gresh, PJM

Comments Submitted by E. Skiba, Midwest ISO - File 1

Comments Submitted by E. Skiba, Midwest ISO - File 2

Comments Submitted by B. Rehman, BPA
April 3-4, 2008 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes

Conditional Firm Issues - 4/4/08

April 4, 2008 OATI + WC Conditional Firm

Parking Lot - General - ESS/ITS

Rollover Recommendation Revised 04/04/08

ESS/ITS Response to Rollover Comments of Southern Generation

Rollover of Redirects Concepts
Order 890 Work Plan 2/28/08 with 2008 Annual Plan numbers with 890-A

Recommendation on Conditional Firm - 3/18/08 - Submitted by P. Sorenson, OATI

NITS Concepts - 3/24/08

Recommendation for Rollover Rights on Redirect on a Firm Basis - Reviewed February 12, 2008 (Clean)

Recommendation for Rollover Rights on Redirect on a Firm Basis - Reviewed February 12, 2008 (Redline)

Comments Submitted by J. Dison, Southern Company Generation

Comments Submitted by J. Pewarski and R. Lamoureux, Midwest ISO

Comments Submitted by B. Rehman, BPA

Comments Submitted by P. Brown, PJM

Comments Submitted by M. Otondo, APS

Late Comments Submitted by JT Wood, Southern Company Transmission

Draft BPS Conditional Firm OATI and WC

Conditional Firm Issues
March 24, 2008 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes NITS Concepts - 3/17/08
March 17, 2008 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes  
March 10-11, 2008 WEQ ESS/ITS

Phoenix, AZ

Hosted by APS

With Web Conferencing provided by APS
CANCELLED   Meeting Arrangements
March 3, 2008 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Concepts for Designation, Un-designation of Resources and Loads ESS/ITS Motions – NITS revised 2/25/08

ESS/ITS Parking Lot – NITS revised 2/25/08

NITS Displacement Concepts 11/7/07 - Submitted by P. Sorenson, OATI
February 25, 2008 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes

ESS/ITS Motions – NITS

ESS/ITS Parking Lot - NITS
 
February 20, 2008 Request for Comments Due March 25, 2008     Request for Comments Due March 25, 2008

Recommendation for Rollover Rights on Redirect on a Firm Basis - Reviewed February 12, 2008 (Clean)

Recommendation for Rollover Rights on Redirect on a Firm Basis - Reviewed February 12, 2008 (Redline)

Comments Submitted by J. Dison, Southern Company Generation

Comments Submitted by J. Pewarski and R. Lamoureux, Midwest ISO

Comments Submitted by B. Rehman, BPA

Comments Submitted by P. Brown, PJM

Comments Submitted by M. Otondo, APS

Late Comments Submitted by JT Wood, Southern Company Transmission
February 11-12, 2008 WEQ ESS/ITS

Reno, NV

Hosted by Sierra Pacific Resources

With Web Conferencing provided by Sierra Pacific
Revised Agenda Recommendation - 2008 AP Items - 2.a.1.5 2.a.i.6 2.1.ii.1-3

Motions - 2008 AP Items - 2.a.1.5 2.a.i.6 2.1.ii.1-3

ESS-ITS Parking Lot General

Parking Lot - 2008 AP Items - 2.a.1.5 2.a.i.6 2.1.ii.1-3

ESS-ITS Motions General
Nearby Hotels

JISWG’s draft EIR – ESS/ITS participation

WEQ ESS/ITS Parking Lot Issues

WEQ ESS/ITS Motions

Recommendation 1/31/08

NAESB Confidentiality Agreement rev 1/23/08 (Corrected)

Tier Table - January 16, 2008

NITS Displacement Concepts 11/7/07 Submitted by P. Sorenson, OATI

Recommended Standards for Rollover on Redirect - February 5, 2008 - Submitted by P. Sorenson, OATI

Comments on Recommendation for modifications to WEQ-001 and WEQ-002 submitted by W. Weathers, SRP

Annulment for SIS - Submitted by W. Weathers, SRP

Alternative Table 4-3 - Submitted by P. Sorenson, OATI

OATI Alternative Table 4-3 - 2/12/08

Treatment of Counteroffers and Rebids of Pre-Confirmed Requests Submitted by A. Pritchard, Duke
January 31, 2008 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes

Recommendation 1/31/08

WEQ ESS/ITS Response to Comments from S. McKean (SRP) 1/31/08

WEQ ESS/ITS 1/31/08 Approved Agenda

WEQ ESS/ITS Parking Lot Issues

WEQ ESS/ITS Motions

WEQ ESS/ITS Response to SPP Comments 1/31/08

WEQ ESS/ITS Response to Comments 1/31/08

WEQ ESS/ITS Response to MISO Comments 1/31/08
Parking Lot Issues - January 16, 2008

Tier Table - January 16, 2008

WEQ ESS/ITS Response to Comments from S. McKean, SRP - January 16, 2008

ESS-ITS WEQ 001-002 - Recommendation (revised 1/16/08)

NAESB Confidentiality Agreement rev 1/23/08 (Corrected)

EIR System Requirements (Registry specs) rev 1/23/08 (Corrected)

Comments on Recommendation for modifications to WEQ-001 and WEQ-002 submitted by C. Yeung, Southwest Power Pool

Comments on Recommendation for modifications to WEQ-001 and WEQ-002 submitted by J. Castle and P. Kiernan, NYISO

Comments on Recommendation for modifications to WEQ-001 and WEQ-002 submitted by E. Skiba, MISO
January 15-16, 2008 WEQ ESS/ITS Meeting

Carmel, IN

Hosted by MISO

With Web Conferencing provided by MISO
Revised Agenda Final Minutes

January 15-16, 2008 WEQ ESS/ITS Redlined Agenda

WEQ ESS/ITS Parking Lot Issues - Revised January 17, 2008

Proposed Tier Tables - Revised January 16, 2008

WEQ ESS/ITS Response to Comments on Recommendation for Modifications to WEQ-001 Submitted by J. Su, Progress - January 16, 2008

WEQ ESS/ITS Response to Comments on Recommendation for Modifications to WEQ-001 Submitted by S. McKean, SRP - January 16, 2008

WEQ ESS/ITS Response to Comments on Recommendation for Modifications to WEQ-001 Submitted by A. Rodriguez, NERC - January 15, 2008

WEQ ESS/ITS Response to Comments on Recommendation for Modifications to WEQ-001 Submitted by B. Harshbarger, Puget Sound Energy

Recommendation for modifications to WEQ-001 and WEQ-002 (rebid, preconfirmation, home page links, misc service attribute) - Revised January 16, 2007
Meeting Arrangements

Web Conference Details provided by MISO

Updated Recommendation for modifications to WEQ-001 and WEQ-002 (rebid, preconfirmation, home page links, misc service attribute) submitted by P. Sorenson OATI rev 12/18/07

Order 890 Work Plan 1-10-2008 with 2008 Annual Plan numbers without 890-A clean - submitted by M. Otondo

Order 890 Work Plan 1-10-2008 with 2008 Annual Plan numbers without 890-A redline - submitted by M. Otondo

Recommendation for modifications to WEQ-001 and WEQ-002 (rebid, preconfirmation, home page links, misc service attribute) - as revised mid meeting - January 15, 2007

Tier Table Submitted by J. Eckelkamp, Progress Energy

Order 890-A Cites
December 20, 2007 Request for Comments Due January 11, 2008     Request for Comments due January 11, 2008

Recommendation for modifications to WEQ-001 and WEQ-002 (rebid, preconfirmation, home page links, misc service attribute) submitted by P. Sorenson OATI, revised 12/18/2007

Comments on Recommendation for modifications to WEQ-001 and WEQ-002 submitted by A. Rodriquez, NERC

Comments on Recommendation for modifications to WEQ-001-4.16 submitted by B. Harshbarger, Puget Sound Energy

Comments on Recommendation for modifications to WEQ-001 Submitted by J. Su, Progress Energy

Comments on Recommendation for modifications to WEQ-001 and WEQ-002 submitted by S. McKean, SRP

Comments on Recommendation for modifications to WEQ-001 and WEQ-002 submitted by C. Yeung, Southwest Power Pool

Comments on Recommendation for modifications to WEQ-001 and WEQ-002 submitted by J. Castle and P. Kiernan, NYISO

Comments on Recommendation for modifications to WEQ-001 and WEQ-002 submitted by E. Skiba, MISO
December 18, 2007 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes

Comments on Preconfirmation and Rebid- Submitted by B. Rehman, BPA revised 12/18/07

Comments on proposed changes to WEQ-001 -Submitted by K. Anderson, Idaho Power Co. revised 12/18/07
NITS Displacement Concepts 11/7/07 - Submitted by P. Sorenson, OATI

WEQ-001 890 Updates to Address Reconfirmation Priority

WEQ-001 Misc Changes (rebid of partial service, preconfirmation, misc service attribute, home page links) 12/11/07 Submitted by P. Sorenson, OATI

WEQ-001 Appendix C Submitted by E. Skiba, Midwest ISO

WEQ-001 Appendix C - Recommendation Submitted by E. Skiba, Midwest ISO
December 6, 2007 WEQ ESS/ITS Meeting

Charlotte, NC

Hosted by Duke

With Web Conferencing provided by Duke
Agenda Final Minutes

Attachment to the Recommendations - Draft Appendix C- OASIS Standards Exemptions (Response) rev 12/06/07

Recommendation - Appendix C - OASIS Exemptions (Response) rev 12/06/07

Draft for Performance Metric as required by Group 2 Metrics - Submitted by JT Wood, Southern Co. - revised 12/06/07

Comments on Appendix C Exemptions- Submitted by J. Dison, Southern Company Generation (response) revised 12/06/07

Comments on ReBid of Partial Service - Submitted by B. Rehman, BPA - revised 12/06/07

Comments Submitted by N. Saini, Entergy -File 1 revised 12/06/07

Comments on Rebid of Partial Service - Submitted by W. Weathers, SRP (WEQ Response) revised 12/06/07
Meeting Arrangements

Action Items List

WEQ-001 890 Updates to Address Reconfirmation Priority

Preconfirmation Priority - Submitted by B. Harshbarger, Puget Sound Energy

NAESB Rebid of Partial Service

NITS Displacement Concepts 11/7/07 Submitted by P. Sorenson, OATI

Comments Submitted by J. Dison, Southern Company Generation

Comments on Rebid of Partial Service Submitted by W. Weathers, SRP

Comments on WEQ-001 890 Updates to Address Reconfirmation Priority Submitted by W. Weathers, SRP

Comments Submitted by B. Harshbarger, Puget Sound Energy

Comments Submitted by K. Anderson, Idaho Power Company

Comments Submitted by J. Dison, Southern Company Generation

Late Comments Submitted by C. Mendrala, ISO New England - File 1

Late Comments Submitted by C. Mendrala, ISO New England - File 2

Attachment to the Recommendation – Draft Appendix C – OASIS Exemptions

Recommendation – Appendix C – OASIS Exemptions

Draft for Performance Metric as required by Group 2 Metrics - Submitted by JT Wood, Southern Co. - revised 11/20/07

Comments Submitted by C. Mendrala, ISO NE

Comments Submitted by N. Saini, Entergy - File 1

Comments Submitted by N. Saini, Entergy - File 2

Comments on Preconfirmation and Rebid – Submitted by B. Rehman, BPA

Comments on ReBid of Partial Service – Submitted by B. Rehman, BPA
December 3, 2007 Request for Comments Due December 5, 2007     Request for Comments due December 5, 2007

NAESB Rebid of Partial Service

WEQ-001 890 Updates to Address Reconfirmation Priority

Comments Submitted by J. Dison, Southern Company Generation

Comments on Rebid of Partial Service Submitted by W. Weathers, SRP

Comments on WEQ-001 890 Updates to Address Reconfirmation Priority Submitted by W. Weathers, SRP

Comments Submitted by B. Harshbarger, Puget Sound Energy

Comments Submitted by K. Anderson, Idaho Power Company

Comments Submitted by C. Mendrala, ISO NE

Comments Submitted by N. Saini, Entergy - File 1

Comments Submitted by N. Saini, Entergy - File 2

Comments on Preconfirmation and Rebid – Submitted by B. Rehman, BPA

Comments on ReBid of Partial Service – Submitted by B. Rehman, BPA
November 20, 2007 Request for Comments Due December 4, 2007     Request for Comments due December 4, 2007

Attachment to the Recommendation – Draft Appendix C – OASIS Exemptions

Recommendation – Appendix C – OASIS Exemptions

Draft for Performance Metric as required by Group 2 Metrics - Submitted by JT Wood, Southern Co. - revised 11/20/07

Comments Submitted by J. Dison, Southern Company Generation

Late Comments Submitted by C. Mendrala, ISO New England - File 1

Late Comments Submitted by C. Mendrala, ISO New England - File 2
November 20, 2007 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes

Order 890 Work Plan - revisions by M. Otondo, APS - revised 11/20/07

WEQ001.C Draft 11.15.2007 - Submitted by E. Skiba, MISO - revised 11/20/07

WEQ 001 Appendix C recommendation - Submitted by E. Skiba, MISO - revised 11/20/07

Draft for Performance Metric as required by Group 2 Metrics - Submitted by JT Wood, Southern Co. - revised 11/20/07
Comments on Language for ATC Annotations Submitted by P. Sorenson, OATI

WEQ001.C Draft 11.15.2007 – Submitted by E. Skiba, MISO

WEQ 001 Appendix C recommendation – Submitted by E. Skiba, MISO

Draft for Performance Metric as required by Group 2 Metrics Revised 11/16/07

Work Plan Assignments Submitted by JT Wood, Southern

Resale Draft Document Flowchart for Resale Submitted by K. Gresh, PJM - VSD format

Resale Draft Document Flowchart for Resale Submitted by K. Gresh, PJM - PDF format

Order 890 Work Plan – revisions by M. Otondo, APS
November 8, 2007 WEQ ESS/ITS Meeting

Houston, TX

Held at the NAESB Office

With Web Conferencing
Announcement

Agenda
Final Minutes

Work Plan Assignments

Draft for Performance Metric as required by Group 2 Metrics

Appendix C - OASIS Standards Exemptions Revised 11/8/07

Draft for Performance Metric as required by Group 2 Metrics Revised 11/8/07
Nearby Hotels

Order 890 Work Plan - Revised 11/01/07

Appendix C – OASIS Standards Exemptions

Business Practice for Conditional Firm Transmission Service

Strawman Business Practice Conditional Firm Transmission Service

NITS Displacement Concepts 11/7/07 Submitted by P. Sorenson, OATI
November 7, 2007 WEQ ESS/ITS Meeting

Houston, TX

Held at the NAESB Office

With Web Conferencing
Rescheduled to November 8, 2007   Nearby Hotels

November 1, 2007 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes

Order 890 Work Plan - Revised 11/01/07 - Redline

Order 890 Work Plan - Revised 11/01/07 - Clean

Check list for NAESB WEQ PKI Authorized Certification Authorities (WEQ-012)

Formal Comments for the Recommendation: WEQ Annual Plan item 2(ii) Group 1
WEQ 001 Appendix C (Draft)

Final Conditional Firm Business Practice 09/11/07

Conditional Firm Strawman Business Practice

Order 890 Work Plan Submitted by M. Otondo, APS

Check List for NAESB WEQ PKI Authorized Certification Authorities (WEQ-012)

Minor Corrections to WEQ-003 Data Dictionary, submitted by E. Skiba, MISO

Minor Corrections to WEQ-013 Implementation Guide, submitted by E. Skiba, MISO

Minor Corrections to WEQ-002 S&CPs, submitted by E. Skiba, MISO
October 9, 2007 WEQ ESS/ITS Meeting

Houston, TX

Held at the NAESB Office

With Web Conferencing
Agenda Final Minutes Nearby Hotels

Check List for NAESB WEQ PKI Authorized Certification Authorites (WEQ-012)

NAESB Public Key Infrastructure (PKI) Standards (WEQ-012)

NAESB Order 890 Work Plan - 09/14/2007

Draft for Performance Metric as required by Group 2 Metrics

OATI Comments on Performance Metrics Submitted by P.Sorenson
September 25, 2007 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes

Responses to Southern Company Comments – 09/25/07

Responses to MISO Comments – 09/25/07

Attachment to Recommendation 1 - Proposed Revisions to the OASIS S&CPs (WEQ 002)

Attachment to Recommendation 2 - Proposed Revisions to the WEQ OASIS Data Dictionary (WEQ 003)

Attachment to Recommendation 3 - Implementation Guide (WEQ 013)

Attachment Recommendation WEQ 2007 Annual Plan Item 2(ii)
890 WEQ 013 Reversion Submitted by P.Sorenson, OATI

890 WEQ 002 Reversion Submitted by P.Sorenson, OATI

890 WEQ 003 Reversion Submitted by P.Sorenson, OATI

Draft Recommendation for WEQ Annual Plan Item 2(a)(ii) – Submitted by C. Mendrala, ISO NE

Informal Comments WEQ 002, WEQ 003 and WEQ 013 Submitted by E.Skiba, Midwest ISO

Comments from Southern Company on S&CP; Data Dictionary; and Implementation Guide – Submitted by J. Wood 09/25/07
September 10-11, 2007

Please note new meeting dates
WEQ ESS/ITS Meeting

Houston, TX

Held at the NAESB Office

With Web Conferencing
Agenda Final Minutes

WEQ 003 Data Dictionary Minor Corrections to R07002 – revised by ESS/ITS on 9/10/07

WEQ 002 S&CP Minor Corrections to R07002 – revised by ESS/ITS on 09/10/07

Responses to ISO New England Comments – 9/10/07

Responses to Southern Company Comments – 9/11/07

Order 890 OASIS Data Dictionary (WEQ 003) – revised by ESS/ITS 9/11/07

Order 890 Implementation Guide (WEQ 013) revised by ESS/ITS on 9/11/07

Order 890 S&CPs (WEQ 002) revised by ESS/ITS on 9/11/07
Nearby Hotels

Responses to PJM Comments - 8/15/07

Responses to Southern Company comments - 8/15/07

Responses to ISO New England Comments

NAESB Order 890 Work Plan - 8/22/07

WEQ-002 Minor Corrections 2007 - Submitted by E. Skiba, MISO on 8/24/07

OASIS Minor Corrections Request WEQ-002 - Submitted by E. Skiba, MISO on 8/24/07

WEQ Data Dictionary Minor Corrections - Submitted by E. Skiba, MISO on 8/24/07

OASIS Minor Corrections Request WEQ-003 - Submitted by E. Skiba, MISO on 8/24/07

Order 890 OASIS Data Dictionary – revised by ESS/ITS 8/27/07

Order 890 Implementation Guide (WEQ 013) revised by ESS/ITS on 8/27/07

Order 890 S&CPs (WEQ 002) revised by ESS/ITS on 8/15/07

Recommendation on WEQ Annual Plan Item 2(ii)

NAESB WEQ PKI Certification Checklist - 08/22/07 - Submitted by P.Sorenson, OATI

WEQ BPS PKI WEQ-012 Draft V1 - Submitted by P.Sorenson, OATI

Draft Recommendation for R07010 Submitted by E.Skiba, Midwest ISO

Southern's Comments- Submitted by J. Wood and G. Gilbert, Southern Company

RTO-ISO Waivers-Exceptions - Submitted by E. Skiba, C. Advena, and C. Mendrala

Order 890 Workplan Revised 09/10/07

Updated Baseline Examples Submitted by P.Sorenson, OATI
August 27, 2007 WEQ ESS/ITS

Conference Call

With Web Conferencing
Revised Agenda Final Minutes

Responses to ISO New England Comments

Order 890 OASIS Data Dictionary – revised by ESS/ITS 8/27/07

Order 890 Implementation Guide (WEQ 013) revised by ESS/ITS on 8/27/07
Responses to Southern Company comments - 8/15/07

Order 890 OASIS Data Dictionary - 8/7/07

Order 890 Implementation Guide - Reflecting Modifications from 8/7/07

Order 890 SC&CPs (WEQ 002) as revised on 8/15/07

Recommendation on WEQ Annual Plan Item 2(ii)

Comments Submitted by C.Mendrala, New England ISO

NAESB Order 890 Work Plan - 8/22/07

WEQ-002 Minor Corrections 2007 - Submitted by E. Skiba, MISO on 8/24/07

OASIS Minor Corrections Request WEQ-002 - Submitted by E. Skiba, MISO on 8/24/07

WEQ Data Dictionary Minor Corrections - Submitted by E. Skiba, MISO on 8/24/07

OASIS Minor Corrections Request WEQ-003 - Submitted by E. Skiba, MISO on 8/24/07
August 15, 2007 WEQ ESS/ITS Meeting

Colorado Springs, CO

Hosted by El Paso Western Pipelines

With Web Conferencing
Agenda Final Minutes

Responses to PJM Comments - 8/15/07

Responses to Southern Company comments - 8/15/07

Order 890 S&CPs (WEQ 002) as revised on 8/15/07
Nearby Hotels

Request for Comments due August 14, 2007

Recommendation on WEQ Annual Plan Item 2(ii)

Attachment to Recommendation 1 - Proposed Revisions to the OASIS S&CPs (WEQ 002)

Attachment to Recommendation 2 - Proposed Revisions to the WEQ OASIS Data Dictionary (WEQ 003)

Attachment to Recommendation 3 - Implementation Guide (WEQ 013)

Comments Submitted by JT Wood, Southern Company

Comments Submitted by C. Mendrala, New England ISO

NAESB Work Plan - July 23, 2007

Comments Submitted by K. Gresh, PJM Interconnection
August 7, 2007 WEQ ESS/ITS

Conference Call

With Web Conferencing
Agenda Final Minutes

Order 890 OASIS Data Dictionary - 8/7/07

Order 890 Implementation Guide - Reflecting Modifications from 8/7/07
Clean Order 890 OASIS S&CP - reflecting modifications from July 25, 2007

Clean Order 890 OASIS Implementation Guide - reflecting modifications from July 25, 2007

Redlined Order 890 OASIS Data Dictionary - July 25, 2007

Order 890 Work Plan - June 27, 2007
August 2, 2007 Request for Comments Due August 14, 2007     Request for Comments due August 14, 2007

Recommendation on WEQ Annual Plan Item 2(ii)

Attachment to Recommendation 1 - Proposed Revisions to the OASIS S&CPs (WEQ 002)

Attachment to Recommendation 2 - Proposed Revisions to the WEQ OASIS Data Dictionary (WEQ 003)

Attachment to Recommendation 3 - Implementation Guide (WEQ 013)

Comments Submitted by JT Wood, Southern Company

Comments Submitted by C. Mendrala, New England ISO

Comments Submitted by K. Gresh, PJM Interconnection
July 24-25, 2007 WEQ ESS/ITS Meeting

Houston, TX

Held at the NAESB Office

With Web Conferencing
Agenda Final Minutes

Redlined OASIS Order 890 S&CP - July 25, 2007

Redlined Order 890 OASIS Data Dictonary - July 25, 2007

OASIS Data Mapping - July 25, 2007

Redlined Order 890 OASIS Implementation Guide - July 25, 2007