| Date |
Event/Location |
Agenda |
Minutes |
Misc. |
| January 12, 2009 |
WEQ BPS Conference Call
With Web Conferencing |
Agenda |
|
Draft Recommendation R08004
Standards Request R08020
Draft 2009 Annual Plan
WEQ BPS Mission-Scope Draft |
| December 10-11, 2008 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Held in Toronto, Canada
Audio and Web Cast to be provided by NERC |
Agenda
NOTE: DAY 2 CANCELLED (Dec 11, 2008) - Due to completion of agenda items on Dec. 10, 2008 |
|
|
| December 1, 2008 |
Joint NAESB WEQ BPS, WEQ TIMTF and NERC BACSDT
Conference Call
With Web Conferencing |
Agenda |
|
WEQ 2008 Annual Plan Item 6b/R07020 Recommendation Redlne
WEQ AP Item 6.b (R07020) Formal Comments Review
Email from A. Rodriquez
r07020 - TVA Comments
r07020 - TVA Supplemental Comments |
| November 17, 2008 |
WEQ BPS Conference Call
With Web Conferencing |
Agenda |
Agenda - as revised during the meeting
WEQ AP Item 6.b (R07020) Formal Comments Review
Proposed 2009 BPS Meeting Dates |
WEQ EC Update
BPS Update to EC
TLR Coordination
IRO-006-5
IRO-006-EI-1
Time and Inadvertent Management
Redline Recommendation
M. Desselle/K. York
NERC
TVA
TVA Supplemental
Entergy 1
Entergy 2
BPA
ISO New England
Great River
JDRJC Associates
Otter Tail
Basin Electric
MidAmerican
Standards Review Subcommittee
Email from A. Rodriquez
Additional AP Items
R08004
R08020
2009 Annual Plan
BPS Co-Chairs Input |
| September 29-30, 2008 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Held in Orlando, FL
Audio and Web Cast to be provided by NERC |
Agenda |
|
Additional Meeting Materials |
| September 22, 2008 |
WEQ BPS Conference Call
With Web Conferencing |
Agenda |
R06010 - WEQ 2008 AP Item 6.1 - Modify the timeing chart for Western Interconnection in WEQ-006 to an initiation of manual time error at + or - 5 (clean)
R06010 - WEQ 2008 AP Item 6.1 - Modify the timeing chart for Western Interconnection in WEQ-006 to an initiation of manual time error at + or - 5 (redline)
WEQ 2008 AP Item 1.a.ii - Continuous Support of TLR Procedure in Alignment with NERC Efforts on Phase II and Phase III (clean)
WEQ 2008 AP Item 1.a.ii - Continuous Support of TLR Procedure in Alignment with NERC Efforts on Phase II and Phase III (redline)
WEQ Inadvertent Interchange Payback Standards - WEQ 007 (redline) |
TLR
Recommendation for 2008 Annual Plan – Item 1a(ii)
R07020
R07020 Recommendation (Revised 8/21/08)
Comments Submitted by L. Horn, Wisconsin Electric
Revised Comments Submitted by E. Davis, Entergy
Comments Submitted by D. Folk, FirstEnergy Corp.
Comments Submitted by W. Franklin, Entergy Services
Comments Submitted by L. Larson, Otter Tail Power Company
Comments Submitted by L. Akens, TVA
Comments Submitted by A. Rodriquez, NERC Staff
Comments Submitted by D. Hils, Duke Energy
NAESB Time and Inadvertent Management Business Practices FAQ - 8/16/-8
Response to NERC Comments
WEQ-007 - 9/19/08
Response to Otter Tail Comments
Response to FirstEnergy Comments
Response to Wisconsin Electric Comments
Response to Entergy Comments
Response to TVA Comments
Response to Entergy Services Comments
R07020 Recommendation
Time and Inadvertent Management Business Practices Implementation Plan - 9/19/08
WEQ BPS MTE WEQ-006 (Includes R07019) - 9/19/08
R06010
Draft Recommendation R06010
R08020
Request R08020 |
| August 26, 2008 |
Request for Comments Due September 17, 2008 |
|
|
Request for Comments Due September 17, 2008
R07020 Recommendation (Revised 8/21/08)
Comments Submitted by L. Horn, Wisconsin Electric
Revised Comments Submitted by E. Davis, Entergy
Comments Submitted by D. Folk, FirstEnergy Corp.
Comments Submitted by W. Franklin, Entergy Services
Comments Submitted by L. Larson, Otter Tail Power Company
Comments Submitted by L. Akens, TVA
Comments Submitted by A. Rodriquez, NERC Staff
Comments Submitted by D. Hils, Duke Energy |
| July 31, 2008 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Conference Call
Audio and Web Cast to be provided by NERC |
Agenda |
|
|
| July 29, 2008 |
WEQ BPS Conference Call
With Web Conferencing |
Agenda |
Final Minutes
Agenda - as Revised during the meeting
2008 AP Item 6 e iii (WEQ-011) Revised 7/29/08
2008 AP Item 6 e iii (WEQ-006) Revised 7/29/08
2008 AP Item 6 e iii (WEQ-007) Revised 7/29/08 |
R07019 Comments
Comments Submitted by J. Busbin, Southern Company Transmission
TLR Draft Recommendation
Recommendation TLR Support WEQ-008
Proposed WEQ-008 890 Related Changes
Definition of Terms (Draft Recommendation)
2008 AP Item 6 e iii (WEQ-007)
2008 AP Item 6 e iii (WEQ-011)
2008 AP Item 6 e iii (WEQ-005)
2008 AP Item 6 e iii (WEQ-006)
Other Business
Revised Draft Minutes from 4/25/08 Meeting Submitted by E. Skiba, Midwest ISO
Initial draft language (WEQ-007) from Time and Inadvertent Management Task Force
Initial draft language (WEQ-006) from Time and Inadvertent Management Task Force
Revised Draft Minutes from 6/4/08 Meeting Submitted by E. Skiba, Midwest ISO |
| June 26-27, 2008 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Minneapolis, MN
Held at the OATI Offices |
Agenda
Agenda Items Completed on June 26
Meeting CANCELLED for June 27 |
|
Item 1d - TLRDT Draft Meeting Notes 04/1-2/2008
Item 2 - Market Flow Threshold Field Test Report 6/1/08
Item 3 - Consider Comments TLR Manual 4/16/08
Item 3 - NERC-NAESB Operator's Reference Manual 4/24/08 reformat AJR REDLINE
Item 3 - NERC-NAESB Operator's Reference Manual 1/29/08 reformat AJR REDLINE
Item 4 - IRO-006-5
Item 4 - IRO-006-EI-1 |
| June 4, 2008 |
WEQ BPS
Houston, TX
Held at the NAESB office
with Web Conferencing |
Agenda |
Final Minutes
Agenda - as Revised during the meeting
Revised Recommendation R07019
| General Information
Nearby Hotels with 2008 Rates
TLR Materials
Future Direction TLR-White Paper
Future Path for TLR Proposal 6/4/08 Final - Revised
Time and Inadvertent Management
Standards Request R07020
NERC Minutes Extract - Time and Inadvertent Mgmt
Time and Inadvertent Management Business Practice
Manual Time Error Correction
Standards Request R07019
BAL-004-1 (Pending Filing)
WEQ-006 (Current Business Practice)
Recommendation R07019 (draft)
NERC/NAESB Definition Comparison
NERC NAESB Definition Comparison April 30, 2008 |
| April 25, 2008 |
WEQ BPS Conference Call
With Web Conferencing |
Agenda |
Final Minutes
Agenda - as Revised during the meeting |
Standards Request R05020
BAL-004-1(pending regulatory filing)
Future Direction TLR White Paper
Standards Request R07020
Standards Request R07019 |
| April 1-2, 2008 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Carmel, IN |
Agenda |
Draft Minutes |
|
| January 29-30, 2008 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Houston, TX
Held at the NAESB office
with Audio and Web Conferencing provided by NERC |
Agenda
Agenda Items Completed on January 29
Meeting CANCELLED for January 30 |
Draft Minutes |
Nearby Hotels with 2008 Rates |
| November 27-28, 2007 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Washington, DC
NERC offices
Audio and Web Conferencing provided by NERC |
Agenda |
Final Minutes
List of Phase III Changes
IRO-006-5 revised 11-28-07 |
Transmission Loading Relief Procedure for the Eastern Interconnection: IRO-006-5
Memorandum on WEQ Annual Plan Committee: To Determine Future Path for TLR in Concert with NERC
Market Flow Threshold Field Test
TLR Flowchart Diagram |
| October 15, 2007 |
WEQ BPS Conference Call
With Web Conferencing |
Agenda |
Final Minutes
R06002 Final Action Attachment - Minor Correction Applied 9-17-2007 (Revised 10/15/2007) |
Minor Corrections Needed for NAESB WEQ TLR BP - Request R06002
R06002 Final Action Attachment - Minor Correction Applied 9-17-2007 |
| October 4-5, 2007 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Minneapolis, MN
Hosted by OATI
Audio and Web Conferencing Provided by NERC |
Agenda |
Draft Minutes |
Market Flow Threshold Field Test 09/14/07
Draft NERC-NAESB Operator's Reference Manual - 10/01/2007
IRO-006-5 ELO Comments
TLR Summary
2006 - 2008 TLRSDT Inputs
Violation Severity Levels Development Guidelines Criteria 09/20/2007 TLRSDT Comment |
| September 13, 2007 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Conference Call
With Web Conferencing
Audio and Web Conferencing Provided by NERC |
CANCELLED |
|
|
| September 6, 2007 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Conference Call
With Web Conferencing
Audio and Web Conferencing Provided by NERC |
Agenda |
Minutes not made available by NERC |
Meeting Announcement
Consideration of Comments on Initial Ballot of IRO-006-4 — Reliability Coordination – Transmission Loading Relief - Revised |
| August 22-23, 2007 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
New Location: Carmel, IN
Hosted by MISO
Audio and Web Conferencing provided by NERC |
Agenda |
Draft Minutes
IRO-006-5 - End of Meeting |
July 9-10, 2007 Joint NAESB WEQ BPS and NERC TLR Draft Minutes
NERC/NAESB Joint Operator's TLR Reference Manual
IRO-006-5 - Redline
IRO-006-5 - Clean
IRO-006-5 - Attachment 1 - Alternate Language - Redline
Compliance Auditor's Guide - 7/16/07 |
| August 9, 2007 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Conference Call
With Web Conferencing
Audio and Web Conferencing Provided by NERC |
2:30pm - 4:00pm
(Eastern)
Single topic Meeting - no agenda to be provided by NERC |
Minutes not made available by NERC |
|
| July 20, 2007 |
WEQ BPS Conference Call
With Web Conferencing |
Agenda |
Revised Final Minutes
TLR Business Standards - Redline 7/20/07 |
IRO-006-4 Final
IRO-006-4-Attachment 1 Final
Final Action R06002
Final Action R06002 - Attachment
Minor Correction List Submitted by K. York, TVA |
| July 19, 2007 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Conference Call
With Web Conferencing
Audio and Web Conferencing Provided by NERC |
8:00am - 9:00pm
(Central)
No Agenda provided by NERC |
Minutes not made available by NERC |
Compliance Auditors Guide - 7/16/07
Joint Operator's Reference Manual |
| July 11-12, 2007 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Toronto, Canada
Audio and Web Conferencing Provided by NERC |
Rescheduled to July 9-10 |
|
|
| July 9-10, 2007 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Toronto, Canada
Audio and Web Conferencing Provided by NERC |
Agenda |
Draft Minutes |
List of Phase III Changes
June 19-20, 2007 Draft Minutes
May 23-24, 2007 Meeting Minutes
List of Phase III Changes
N.Muller's Response to A.Rodriquez's email on Phase III Changes
Email from A.Rodriquez to B.Li and N.Muller on IDC Reference Document
Draft Compliance Audit Guideline
IRO-006-5-V02
IRO-006-5 Attachment 1-V01
IRO-006-5 Revised Attachment 1 - Redlined 6/15/07
NERC/NAESB Operator's Reference Manual |
June 20-21, 2007
Please note new meeting dates |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Houston, TX
Held at the NAESB offices
With Web Conferencing |
2nd Rescheduling - back to June 19-20 |
|
|
| June 19-20, 2007 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Location and host of meeting TBD |
Rescheduled to June 20-21 |
|
|
June 19-20, 2007
Please note this is the 2nd date change for this meeting |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Houston, TX
Held at the NAESB offices
With Web Conferencing |
Agenda |
Draft Minutes
Attachment - IRO-006-4 Final
Attachment - Comment Report - IRO-006-4-a
Attachment - IRO-006-4-Attachment 1 Final |
Current Comments and Draft Responses |
| May 23-24, 2007 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Chattanooga, TN
Hosted by TVA
Web Conferencing provided by TVA |
Agenda |
Draft Minutes |
Hotel Information |
| May 1, 2007 |
WEQ BPS
Conference Call
with Web Conferencing |
Agenda |
Final Minutes
Minor corrections for TLR - 5/1/07
TLR redlined showing minor corrections only |
TLR BP for NAESB Revised March 28, 2007 |
| April 26, 2007 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Conference Call
with Webex provided by NERC |
Agenda |
Minutes not made available by NERC |
Draft Files for Review
IR0-006-4- White Paper 4/20/07
IR0-006-4- Questions 4/20/07
NERC TLR Implementation Plan 4/25/07
Comments by Mangum-Goins
Email Summary from Ben Li
Language for NAESB waiver to NERC for TLR comment period |
| April 18-19, 2007 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Carmel, IN
Hosted by MISO
Web Conferencing provided by MISO |
Agenda |
Draft Minutes
April 18-19, 2007 TLR Meeting Agenda
Items to be posted
TLR Whitepaper 4/18/07 KY AR
Mapping of IRO-006 NERC/NAESB Split Attachment 1 - 4/17-18/2007
Draft TLR Comment Questions 4/18-19/2007
Draft IRO-006-3 - 4/17-18/2007 Clean |
Nearby Hotels
Directions - Caremel, IN
Directions for the Lakeside Conference Center
Work Papers |
March 27-28, 2007
Please note new dates |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Houston, TX
NAESB Office, 13th Floor, San Jacinto Room
With Web Conferencing |
Agenda |
Redlined Draft Minutes
TLR joint group Action Plan 3/30/07
Revised Agenda with Timeline included for NERC posting
Revised IRO-006 Attachment 1 3/27/07
Revised R06002 - 3/28/07
Revised IRO-006 3/30/07 |
Nearby Hotels
R06002 NAESB TLR with level 5A change
IRO-006 Attachment 1 General Update NERC/NAESB split revised 2/27-28/2007
IRO-006-3 as revised during 2/27-28/2007 meeting
NERC IDC Reference Document /Attachment 2 Revised 2/28/07
IRO-006 General Update NERC Sar attachment 2/28/07 - Clean
IRO-006 General Update NERC Sar attachment 2/28/07 - Redline
Draft TLR Comment Questions
IRO from FERC Filing Volumes I-III Reliability Standards Development Plan
Excerpt from Order 693 Re: TLR |
| March 19, 2007 |
WEQ BPS
Conference Call
with Web Conferencing |
Agenda |
Final Minutes
TLR with level 5A change included |
IRO-006-3 (version of IRO006-3 the committee plans to use in the mapping process)
R04013A Final Action - Recommendation for Development of post-split "Version 0" Transmission Loading Relief (TLR) Business Practice Standard - Ratified April 10, 2006
R04013A Final Action - Attachment
R06002 Final Action - Recommendation - Modify NAESB per split "Version 0" TLR Business Practices to remain consistent with NERC IRO-006-1 pre split TLR Reliability Standards (inclusion of market flows) - Ratified Septemer 1, 2006
R06002 Final Action - Attachment
IRO-006 Attachment 1 General Update NERC/NAESB split revised 2/27-28/2007
IRO-006-3 as revised during 2/27-28 Meeting
NERC IDC Reference Document/Attachment 2 Revised 2/28/2007 |
| February 27-28, 2007 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team
Birmingham, AL
Hosted by Southern
Held at the Birmingham Marriott
Web Conferencing provided by NAESB |
Agenda |
Final Minutes
IRO-006 Attachment 1 General Update NERC/NAESB split revised 2/27-28/2007
IRO-006-3 as revised during 2/27-28 Meeting
NERC IDC Reference Document/Attachment 2 Revised 2/28/2007 |
Nearby Hotels - Birmingham, AL
Mapping of Separation of Reliability Policies and Business Practice Standards 2/22/07
IRO-006-3 (version of IRO006-3 the committee plans to use in the mapping process)
NERC IRO-006-2
NERC General Update with NAESB SAR IRO-006 Attachment 1
R04013A Final Action - Recommendation for Development of post-split "Version 0" Transmission Loading Relief (TLR) Business Practice Standard - Ratified April 10, 2006
R04013A Final Action - Attachment
R06002 Final Action - Recommendation - Modify NAESB per split "Version 0" TLR Business Practices to remain consistent with NERC IRO-006-1 pre split TLR Reliability Standards (inclusion of market flows) - Ratified Septemer 1, 2006
R06002 Final Action - Attachment
Draft Minutes 1/10/07 - 1/11/07
Exhibit A - IRO-006 General Update NERC/NAESB split 1/12/07
NAESB TLR Business Practice Review
IDC Reference Documentation Submitted by L.Kezele, NERC
Market Flow Field Trial Monitoring Procedure - 2/15/07 |
| January 10-11, 2007 |
Joint NAESB WEQ BPS and NERC TLR Drafting Team Houston, TX
Hosted by NERC and held at the Hyatt Regency Hotel
Web Conferencing provided by NERC |
Agenda |
Final Minutes |
|
| January 3, 2007 |
WEQ BPS Conference Call
With Web Conferencing |
Agenda |
Final Minutes |
Updated TLR Matrix
TLR Team letter to NERC and NAESB |
| August 21, 2006 |
WEQ BPS Conference Call
With Web Conferencing |
Agenda |
Final Minutes |
Request R06010 |
| August 11, 2006 |
WEQ BPS Conference Call
With Web Conferencing |
Agenda |
Final Minutes |
WEQ Annual Plan Item 3(c)(i) Revised Recommendation
Comments Submitted by Basin Electric Power Cooperative
Comments Submitted by JT Wood, Southern Company
Request R06010 |
| June 26, 2006 |
WEQ BPS Conference Call
With Web Conferencing |
Agenda |
Final Minutes
Revised SOC Recommendation as of 6/26/06
| Recommendation as of 6/16/06
Standards of Conduct Redlined Recommendation by K. York, Submitted 6/26/06 |
| June 16, 2006 |
WEQ BPS Conference Call
With Web Conferencing |
Agenda |
Final Minutes
Attachment Recommendation as of 6/16/06 |
Explanation of EC remand of Standards of Conduct
Link to Presentation Submitted by N. Saini |
| April 25, 2006 |
WEQ BPS
Conference Call
with Web Conferencing |
Agenda |
Final Minutes
Redlined Recommendation for WEQ 2006 AP Item 3(c)(i) |
WEQ 2006 Annual Plan Item (3)(c)(i)
Recommendation
Request for Comments due April 26, 2006
Comments Submitted by NAESB WEQ ESS/ITS
Comments Submitted by N.Saini, Entergy
R05007
Recommendation
Request for Comments due April 23, 2006
R06002
Recommendation
Post Split TLR Business Practice Standard with SPP Regional Differences
Request for Comments due April 13, 2006
Comments Submitted by J.Cyrulewski, ITC Transmission |
| March 23-24, 2006 |
WEQ BPS Meeting
Houston, TX
Held a the NAESB Office, Suite 2350
With Web Conferencing |
Agenda
WEQ BPS Meeting
Agenda Items Completed on March 23
Meeting CANCELED for March 24 |
Final Minutes
Draft Recommendation WEQ 2006 AP (3)(c)
Draft Recommendation form for WEQ 2006 AP (3)(c) with Clean Standard Attached |
Nearby Hotels
Draft Recommendation for WEQ 2006 AP Item (3)(c)
Comments Submitted by R. Martin, Southern Company Services
Comments Submitted by B. Kedrowski, We Energies
Comments Submitted by S.Henry, Duke Energy
Comments Submitted by E.Davis, Entergy
Comments Submitted by B.Rehman, BPA |
| March 10, 2006 |
Request for Comments Due March 21, 2006 |
|
|
Notification of Request for Comments
Draft Recommendation for WEQ 2006 AP Item (3)(c)
Comments Submitted by R. Martin, Southern Company Services
Comments Submitted by B. Kedrowski, We Energies
Comments Submitted by S.Henry, Duke Energy
Comments Submitted by E.Davis, Entergy
Comments Submitted by B.Rehman, BPA |
| March 10, 2006 |
WEQ BPS
Conference Call
With Web Conferencing |
Agenda |
Final Minutes
Attachment - Draft Recommendation for Standards of Conduct 3/10/06
BPS Responses to Informal Comments on R05007
BPS Responses to Informal Comments on WEQ AP Item (3)(c)
BPS Responses to Informal Comments on R06002 |
For R05007
Notification of Requests for Comments
Inadvertent Interchange Payback - Redline 2/22/06
Manual Time Error - Redline 2/22/06
Entergy Comments on R05007 Submitted by E.Davis
California ISO Comments on R05007 Submitted by D.Hawkins
For R06002
Notification of Request for Comments
Draft Recommendation R06002 Redlined
Comments Submitted by E.Davis, Entergy
For Standards of Conduct
Draft Recommendation on WEQ Standards of Conduct 2/8/06
Instructional Memo to ESS/ITS on Draft Recommendation for Standards of Conduct
Comments from N. Saini on Standards of Conduct
Entergy Proposal on Order 2004 Standards of Conduct
Comments Submitted by Southern |
| March 6, 2006 |
Request for Comments Due March 9, 2006 |
|
|
Notification of Request for Comments
Draft Recommendation R06002 Redlined
Comments Submitted by E. Davis, Entergy |
| March 3, 2006 |
WEQ BPS
Conference Call
With Web Conferencing |
Agenda |
Final Minutes
Attachment - Draft Recommendation R06002 as redlined during the 03/03/06 meeting |
Changes to TLR Business Practices (Recommendation R04013A) by the BPS 11/22/05
Transmission Loading Relief (Eastern Interconnection Standards) (WEQ-008)
R06002
R06002 - Attachment
NERC TLR SPP Regional Difference Redline |
| February 23, 2006 |
Request for Comments Due March 9, 2006 |
|
|
Notification of Request for Comments
Inadvertent Interchange Payback - Redline 2/22/06
Manual Time Error - Redline 2/22/06
Entergy Comments on R05007 Submitted by E. Davis
California ISO Comments on R05007 Submitted by D. Hawkins |
| February 22, 2006 |
WEQ BPS Meeting
Houston, TX
Held a the NAESB Office, Suite 2350
With Web Conferencing |
Agenda |
Final Minutes
Inadvertent Interchange Payback - Redline 2/22/06
Manual Time Error - Redline 2/22/06 |
Nearby Hotels
Coordinate Interchange Standards (WEQ-004)
Area Control Error (ACE) Equation Special Cases Standards (WEQ-005)
Manual Time Error Correction Standards (WEQ-006)
Inadvertent Interchange Payback Standards (WEQ-007)
Transmission Loading Relief (Eastern Interconnection Standards) (WEQ-008)
R05007
R06002
R06002 - Attachment
CIBP as of 2/17/06
Link to Presentation Submitted by N. Saini |
| February 7-8, 2006 |
WEQ BPS Meeting
Houston, TX
Held a the NAESB Office, Suite 2350
With Web Conferencing |
Agenda |
Final Minutes
Instructional Memo to ESS/ITS on Draft Recommendation for Standards of Conduct
Draft Recommendation on WEQ Standards of Conduct 2/8/06 |
Nearby Hotels
R05007
R06002
Final Action for WGQ 2004 AP Item 2
WGQ Final Action on Affiliate Reporting |
| November 22, 2005 |
WEQ BPS Conference Call
With Web Conferencing |
Agenda |
Final Minutes
Changes to TLR Business Practices (Recommendation R04013A) by the BPS
Response to General Comments
Response to American Transmission Comments
Response to Entergy Comments
Response to TVA Comments |
Recommendation for R04013A
Post Split Version 0 TLR Business Practices Standards
Request for Comments on R04013A due November 18, 2005
Comments (R04013A- TLR) Submitted by: E. Davis, Entergy Services, Inc.
Comments by: J. Voeck, American Transmission Company
Comments by: C. Yeung, ISO RTO Councils Standards Review Committee
Comments by: O. Frazier, Duke Energy
Comments by: R. Carter, Southern Company Generation
Comments by: E. Senkowicz, Florida Reliability Coordinating Council
Comments by: K. Warren, NERC Operating Reliability Subscommittee
Attachment to NERC Comments
Comments by: K. York, Tennessee Valley Authority
Comments by: J. Busbin, Southern Company Transmission |
| October 26-27, 2005 |
WEQ BPS Meeting
Houston, TX
Held at the NAESB Office, Suite 2350
With Web Conferencing |
CANCELLED |
|
|
| October 19, 2005 |
WEQ BPS Conference Call
With Web Conferencing |
CANCELLED |
|
|
| October 17, 2005 |
WEQ BPS Conference Call
With Web Conferencing |
CANCELLED |
|
|
| October 12, 2005 |
WEQ BPS Conference Call
With Web Conferencing |
Agenda |
Final Minutes
TLR as Revised during Meeting on 10/12/05 and with Offline Changes made 10/13/05 |
Comments from L.Kezele on TLR
TLR Revised 10/6/05
PJM/MISO; Managing Congestion to Address Seams |
| October 4-5, 2005 |
WEQ BPS Meeting
Houston, TX
Held at the NAESB Office, Suite 2350
With Web Conferencing |
Agenda |
Final Minutes
Attachment-Redlined Draft NAESB TLR Business Practice Standards as of 10/5/05
Attachment-Clean Draft NAESB TLR Business Practices Standards as of 10/5/05 |
Nearby Hotels
TLR with Offline Changes made 9/15/05 |
| September 23, 2005 |
WEQ BPS Conference Call
With Web Conferencing |
CANCELED |
|
TLR with Offline Changes made 9/15/05 |
| September 13-14, 2005 |
WEQ BPS Meeting
Houston, TX
Held at the NAESB Office, Suite 2350
With Web Conferencing |
CANCELLED |
|
|
| September 7, 2005 |
WEQ BPS Conference Call
With Web Conferencing |
Agenda |
Final Minutes
Attachment-NAESB TLR Business Practices Clean Draft - 9/7/05
Attachment-NAESB TLR Business Practices Redlined Draft - 9/7/05 |
TVA Comments on TLR 8-19-05
NAESB TLR Business Practice Clean Draft 8/9-10/05
Proposed Language Addressing Pro Rata Basis
NERC Draft Changes to IRO-006 Attachment 1 |
| August 9-10, 2005 |
WEQ BPS Meeting
Houston, TX
Held at the NAESB Office, Suite 2350
With Web Conferencing |
Revised Agenda |
Final Minutes
Attachment-NAESB TLR Business Practices Redline Draft 8/9-10/05
Attachment-NAESB TLR Business Practices Clean Draft 8/9-10/05 |
Nearby Hotels
Email from Rodriquez,PJM on Requirements 3.1
TLR Business Practices - Version with Accepted Changes from 7/20/05 and with Redline Revisins Made by K. York on 8/4/05
NAESB Progress Report on July 1 Comments to NOPR
2004 WGQ Annual Plan Item #2 FERC Order 2004 (Affiliate Order)
R04006C - OASIS 1A Enhancements - Redirects |
| July 20-21, 2005 |
WEQ BPS Meeting
Houston, TX
Held at the NAESB Office, Suite 2350
With Web Conferencing |
Agenda
WEQ BPS Meeting
Agenda Items Completed on July 20
Meeting CANCELED for July 21 |
Final Minutes
Attachment-NAESB TLR Business Practices Redline Draft 7/20/05
Attachment-NAESB TLR Business Practices Clean Draft 7/20/05 |
Nearby Hotels
NAESB TLR Business Practices Clean Draft 6/29/05
TVA Questions and Comments on the Draft TLR Business Practices |
| June 29, 2005 |
WEQ BPS Meeting
Houston, TX Held at the NAESB Office, Suite 2350
with Web Conferencing |
Agenda |
Final Minutes
Attachment-NAESB TLR Business Practices Redline Draft 6/29/05
Attachment-NAESB TLR Business Practices Clean Draft 6/29/05 |
Nearby Hotels
TLR Matrix - 6/21/05
Request for Comments on Draft TLR Business Practices
TVA Questions and Comments on the Draft TLR Business Practices
Entergy Comments on the Draft TLR Business Practices, Submitted by E. Davis
IDC Reference Document 4/20/05 |
| June 17, 2005 |
Request for Comments Due June 24, 2005 |
|
|
Request for Comments on Draft TLR Business Practices
TVA Questions and Comments on the Draft TLR Business Practices
Entergy Comments on the Draft TLR Business Practices, Submitted by E. Davis |
| June 14-15, 2005 |
WEQ BPS Meeting
Houston, TX
Held at the NAESB Office, Suite 2350
With Web Conferencing |
Revised Agenda |
Final Minutes
Attachment-NAESB TLR Business Practices Redline Draft 6-15-05
Attachment-NAESB TLR Business Practices Clean Draft 6-15-05 |
Nearby Hotels
NAESB TLR Business Practices Revised Draft 3
Entergy Comments NERC/NAESB draft TLR Split
SPP Comments (noted in Pink) on NAESB TLR
Final Consensus Division of TLR for Version 0 Business Practices, June 1, 2005 (Clean)
Final Consensus Division of TLR for Version 0 Business Practices, June 1, 2005 (Redline)
Review of IRO-006 to NAESB TLR Business Practices by Ed Davis |
| June 2, 2005 |
WEQ BPS Meeting
Houston, TX
Held at the NAESB Office, Suite 2350
With Web Conferencing |
CANCELED |
|
Nearby Hotels |
| May 9, 2005 |
WEQ BPS
Conference call OR Meeting |
CANCELLED |
|
|
| April 5, 2005 |
WEQ BPS Meeting
Washington, DC
Hosted by Edison Electric Institute |
CANCELLED |
|
Nearby Hotels |
| February 11, 2005 |
WEQ BPS Update Conference Call
with Web Conferencing |
Agenda |
Final Minutes |
Chart of Version 1 Modifications and Additions - Revised |
January 25, 2005
PLEASE NOTE DATE CHANGE |
Conference Call
with Web Conferencing |
CANCELLED |
|
|
| November 29, 2004 |
Conference Call
With Web Conferencing |
Revised Agenda |
Final Minutes
Attachment-Letter to EC
Attachment-Doc Incorporating Comments
Attachment-Replacement Definitions |
Response on (Coordinate Interchange) Comments Submitted by G. Nolan - Salt River Project
Response on (Coordinate Interchange) Comments Submitted by M. Pfeister - Salt River Project
Response on (Inadvertent Interchange) Comments Submitted by C. Monroe - NERC
Response on (ACE Special Cases) Comments Submitted by C. Monroe - NERC
Response on (Time Error) Comments Submitted by C. Monroe - NERC
Response on (Time Error) Comments Submitted by G. Nolan - Salt River Project
Response on (Inadvertent Interchange) Comments Submitted by G. Brown - CASIO
Response on (Coordinate Interchange) Comments Submitted by G. Brown - CASIO
Response on (ACE Special Cases) Comments Submitted by G. Brown - CASIO
Response on (Time Error) Comments Submitted by G. Brown - CASIO
Response on (Time Error) Comments Submitted by A. Johnson - Mirant
Document Incorporating All Final Industry Comments on Version 0 and Responses to these Final Comments by the WEQ BPS - Updated 11/29/04, 9:00am
Overall comments submitted by O. Frazier - Duke Energy
Response on (Ace Special Case) Comments Submitted by A. Johnson - Mirant
Response on (Coordinate Interchange) Comments Submitted by W. Smith - Allegheny
Response on (Time Error) Comments Submitted by W. Smith - Allegheny
Response on (Overall) Comments Submitted by O. Frazier - Duke Energy
Proposed Replacement Definitions
NERC Glossary of Terms Used in Reliability Standards
Response on (Time Error) Comments Submitted by E. Davis - Entergy
Response on (Coordinate Interchange) Comments Submitted by E. Davis - Entergy
Response on (Inadvertent Interchange) Comments Submitted by E. Davis - Entergy
Response on (Ace Special Cases) Comments Submitted by E. Davis - Entergy
Response on (TLR) Comments Submitted by E. Davis - Entergy
Response on (Inadvertent Interchange) Comments Submitted by A. Johnson - Mirant
Response on (Coordinate Interchange) Comments Submitted by A. Johnson - Mirant
Response on (Time Error) Comments Submitted by K. Tammar - ISO RTO Council - SRC
Response on (Coordinate Interchange) Comments Submitted by K. Tammar - ISO RTO Council - SRC
Response on (Inadvertent Interchange) Comments Submitted by K. Tammar - ISO RTO Council - SRC
Response on (Ace Special Cases) Comments Submitted by K. Tammar - ISO RTO Council - SRC
Draft Cover Letter to the EC
Email Comment from NERC on TLR 11/29/04 |
| October 22, 2004 |
Conference Call
With Web Conferencing |
Agenda |
Final Minutes |
Timeline and Goals - updated 10/19/04
Draft Cover Letter
ACE Draft 2 Revised 10/19/04
Inadvertent Interchange Draft 2 Revised 10/19/04
TLR Draft 2 Revised 10/19/04
CI Version 0 Draft 2 Revised 10/19/04
Time Error Draft 2 Revised 10/19/04
ACE Special Cases Draft 3 Comment Form
Coordinate Interchange Draft 3 Comment Form
Inadvertent Interchange Draft 3 Comment Form
Time Error Draft 3 Comment Form
TLR Draft 3 Comment Form |
| October 12-13, 2004 |
Washington, DC
Hosted by the FERC, Room 3M-4 |
Agenda |
Final Minutes
ACE Draft 2 Revised 10/19/04
Inadvertent Interchange Draft 2 Revised 10/19/04
TLR Draft 2 Revised 10/19/04
CI Version 0 Draft 2 Revised 10/19/04
Time Error Draft 2 Revised 10/19/04
Correspondence with NERC re: Version 0 Development |
Timeline and Goals
Nearby Hotels |
| September 3, 2004 |
Request for Comments Due October 4, 2004 |
|
|
Request for Comments
ACE Special Cases Version 0, Draft 2 Comment Form
Coordinate Interchange Version 0, Draft 2 Comment Form
Inadvertent Interchange Version 0, Draft 2 Comment Form
Time Error Version 0, Draft 2 Comment Form
TLR Version 0, Draft 2 Comment Form
Comments Submitted by Hydro-Quebec TransEnergie on ACE Special Cases Version 0, Draft 2
Comments Submitted by Hydro-Quebec TransEnergie on Coordinate Interchange Version 0, Draft 2
Comments Submitted by Hydro-Quebec TransEnergie on Inadvertent Interchange Version 0, Draft 2
Comments Submitted by Hydro-Quebec TransEnergie on Time Error Version 0, Draft 2
Comments Submitted by Hydro-Quebec TransEnergie on TLR Version 0, Draft 2
Comments Submitted by Entergy Services, Inc. on ACE Special Cases Version 0, Draft 2
Comments Submitted by Entergy Services, Inc. on Coordinate Interchange Version 0, Draft 2
Comments Submitted by Entergy Services, Inc. on Inadvertent Interchange Version 0, Draft 2
Comments Submitted by Entergy Services, Inc. on Time Error Version 0, Draft 2
Comments Submitted by Entergy Services, Inc. on TLR Version 0, Draft 2
Comments Submitted by Salt River Project (Shirley McKean) on ACE Special Cases Version 0, Draft 2
Comments Submitted by Salt River Project (Gary Nolan) on ACE Special Cases Version 0, Draft 2
Comments Submitted by Salt River Project (Gary Nolan) on Coordinate Interchange Version 0, Draft 2
Comments Submitted by Salt River Project (Shirley McKean) on Coordinate Interchange Version 0, Draft 2
Comments Submitted by Salt River Project (Gary Nolan) on Inadvertent Interchange Version 0, Draft 2
Comments Submitted by Salt River Project (Shirley McKean) on Inadvertent Interchange Version 0, Draft 2
Comments Submitted by Salt River Project (Shirley McKean) on Time Error Version 0, Draft 2
Comments Submitted by Southwest Power Pool on Time Error Version 0, Draft 2
Comments Submitted by Southwest Power Pool on Coordinate Interchange Version 0, Draft 2
Comments Submitted by Cinergy Services on ACE Special Cases Version 0, Draft 2
Comments Submitted by Allegheny Power on TLR Version 0, Draft 2
Comments Submitted by NERC Resources Subcommittee on ACE Special Cases Version 0, Draft 2 |
| September 2, 2004 |
Conference Call |
Agenda |
Final Minutes |
Time Error Standard, Draft 2, Redlined
Time Error Standard, Draft 2, Clean
CIBP Draft 2 - Revised 9/1/04
TLR Draft 2
ACE Special Cases V0D2 Comment Form - Revised 9/2/04
Coordinate Interchange V0D2 Comment Form - Revised 9/2/04
Inadvertent Interchange V0D2 Comment Form - Revised 9/2/04
Time Error V0D2 Comment Form - Revised 9/2/04
TLR V0D2 Comment Form - Revised 9/2/04
ACE Draft 2, 9/1/04 Revised
Inadvertent Interchange Draft 2, Revised 8/31/04
Draft 2 Posting Letter - Revised 9/2/04 |
| August 31, 2004 |
Houston, TX
Held at the NAESB offices, 13th Floor, San Jacinto Room
With Web Conferencing during the afternoon portion of the meeting |
Agenda |
Final Minutes |
Nearby Hotels
Timeline and Goals
Draft NAESB Version 0 CIBP, Revised 8-26-04, Redline
Draft NAESB Version 0 CIBP, Revised 8-26-04, Clean
Chart 2 Version 0 BPs-Decision, Accepted Comments, and Agreements 8-19-04
Time Error Correction Standard Version 0 Draft 2 Template
TLR Draft 2 (8-27-04) - Clean
TLR Draft 2 (8-27-04) - Redline
Draft 2 ACE Equation Special Cases BPS
Version 0 Inadvertent Interchange Draft 2, August 30, 2004
NAESB ATC Standard PBJ 8/30/04 Draft
NAESB CBM Standard PBJ 8/30/04 Draft
039 Reliability Coordination - Transmission Loading Relief |
| August 17-18, 2004 |
Houston, TX
Held at the NAESB offices, 23rd Floor |
CANCELLED - RESCHEDULED FOR AUGUST 10-11, 2004 |
|
|
| August 17, 2004 |
Conference Call |
Agenda |
Final Minutes |
Timeline and Goals
Chart of Version 0 Updates from NERC-NAESB Version 0 Leadership Meeting on August 2-3, 2004 and WEQ BPS Meeting August 10-11, 2004
NERC-NAESB Collaborative Proposal for Version 0 Business Practice Standards |
| August 10-11, 2004 |
Houston, TX
Held at the NAESB offices, 23rd Floor
With Web Conferencing |
Agenda |
Final Minutes |
Recommendation for R03017
Meeting Arrangements
Timeline and Goals
Summary of NERC-NAESB Joint TF to Recommend Assignment of Business Practices
Goals Chart of NERC/NAESB Version 0 Decisions from 8/2-3 Chicago Meeting
Summary of NERC/NAESB Joint TF to Recommend Assignment of BPs - Revised
Summary of NERC/NAESB Joint TF to Recommend Assignment of BPs - Revised 2 |
August 18-20, 2004
Please note date change |
NERC Standards Drafting Team Meeting
Denver, CO
Held at the Marriott Denver City Center |
8:00am - 5:00pm on day 1,
8:00am - 5:00pm on day 2
and 8am - Noon on day 3 (Mountain) |
|
|
| July 9, 2004 |
Request for Comments on Version 0 Business Practices Due August 9, 2004 |
|
|
Request for Comments due August 9, 2004
Comments Submitted by Kathy Davis, TVA Electrical Systems Operations
Comments Submitted by Hydro-Quebec TransEnergie's
Comments Submitted by TVA Bulk Power Trading, NAESB ACE Version Standard
Comments Submitted by TVA Bulk Power Trading, NAESB Emergency Operations Business Standard
Comments Submitted by TVA Bulk Power Trading, NAESB TLR Verion 0 Standard
Comments Submitted by TVA Bulk Power Trading, NAESB CIBP Verion 0 Standard
Comments Submitted by TVA Bulk Power Trading, NAESB Inadvertent Interchange Standard
Comments Submitted by TVA Bulk Power Trading, NAESB Time Error Correction Standard
Comments Submitted by Salt River Project, NAESB ACE Version Standard
Comments Submitted by Salt River Project, NAESB Emergency Operations Business Standard
Comments Submitted by Salt River Project, NAESB TLR Verion 0 Standard
Comments Submitted by Salt River Project, NAESB CIBP Verion 0 Standard
Comments Submitted by Salt River Project, NAESB Inadvertent Interchange Standard
Comments Submitted by Salt River Project, NAESB Time Error Correction Standard
Comments Submitted by Florida Reliability Coordinating Council, NAESB Version 0 Standards
Comments Submitted by WECC
Comments Submitted by Mirant
Comments Submitted by We Energies
Comments Submitted by National Grid
Comments Submitted by Entergy Services, Inc.
Comments Submitted by Progress Energy - Carolinas
Comments Submitted by the following TAPS Members - IMPA, FMPA, WPPI, VPPSA nad Lincoln Nebraska Electric System |
| July 7-8, 2004 |
Houston, TX
Held at NAESB office, 13th Floor, Fannin Room |
Agenda |
Final Minutes |
Nearby Hotels
NAESB TLR Standard Version 0 Draft 1 - 6/29/04
NAESB TLR Standard Version 0 Supporting Documentation
NAESB Time Error Correction Draft 1 - 07/04 Clean
NAESB Time Error Correction Draft 1 - 07/04 Redline
Appendix 1A NAESB NKS Version 2 - Clean
Appendix 1A NAESB NKS Version 2 - Redline
NAESB Inadvertent Interchange Standard - Redline
NAESB Inadvertent Interchange Standard - Clean
NAESB Appendix 1A Redline Apdx1F BOT Approved-0203
NAESB Appendix 1A Clean Apdx1F BOT Approved-0203
Draft 1 Posting Letter
CIBP Standard Version 0 - 6/30/04
NAESB Version 0 Policy 3 Support Document
Version 0 Business Practices/NERC Operating Policy 5
Version 0 Business Practices/NERC Operating Policy 5/Clean |
| July 1-2, 2004 |
Chicago
Host TBD |
CANCELLED - MOVED TO JULY 7-8 |
|
|
| June 29, 2004 |
Conference Call |
Agenda |
Final Minutes |
Version 0 Business Practices Assignments
Version 0 Business Practices/NERC Operating Policy 5
Version 0 Business Practices/NERC Operating Policy 5/Clean
Version 0 Business Practices/NERC Operating Policy 3 and Appendices
Version 0 Business Practices/NERC Appendix 1A
Version 0 Business Practices/NERC Operating Policy 1, Section F 4 & 5/Clean
Version 0 Business Practices/NERC Operating Policy 1, Section F 4 & 5/Redline
Version 0 Business Practices/NERC Operating Policy 1, Section F 4 & 5/Original Text
NAESB Version 0 Business Practices TLR Standard
Version 0 Business Practices Draft Time Error Correction Standard
Version 0 SDT June 28-30, 2004 Meeting - Operating Policy Markups and Operations Draft Version 0 Standards
Version 0 SDT June 28-30, 2004 Meeting - Draft Planning Standards |
| June 28-30, 2004 |
NERC Standards Drafting Team Meeting
Chicago, IL |
All Day |
|
|
| June 17-18, 2004 |
Columbus, OH
Hosted by AEP |
Revised Agenda |
Final Revised Version 0 Action Plan
Final Minutes (Word Format)
| Meeting Arrangements
Updated Request for Standards Development and Timeline and Deliverable Dates for Preparing "Version 0" Business Practices
Disposition of Version 0 Business Practices Associated with NERC Version 0 Reliability Requirements
Appendix 9C1
Appendix 9C1B
Appendix 9C1C
Appendix 9C2
Appendix 9C3
CIBP Standard Version 0 6-11-04
Version 0 BPS Raw Text
Link to the NERC Functional Model
|