Click Here To Return To The WEQ Home PageClick Here To Return To The REQ Home PageClick Here To Return To The WGQ Home PageClick Here To Return To The RGQ Home Page

What's Hot? | Press Release | Home  
 
Related Government Activities
 
Related Government Activities
 
March 21, 2024 - FERC Notice of Proposed Rulemaking (WGQ, Version 4.0) Standards for Business Practices of Interstate Natural Gas Pipelines (Docket No. RM96-1-043).
November 8, 2023 - Michael Desselle Correspondence to NAESB Members
November 7, 2023 - FERC, NERC, and Regional Entity Staff Report - Inquiry to Bulk-Power System Operations During December 2022 Winter Storm Elliot
October 26, 2023 - FERC Final Rule - Electric Reliability Organization Proposal to Retire Requirements in Reliability Standards Under the NERC Standards Efficiency Review (Docket No. RM19-17-001; Order No. 902)
September 29, 2023 - NAESB Report for Submittal to the Commission on WGQ Standards for Business Practices of Interstate Natural Gas Pipelines, Version 4.0 (Docket No. RM96-1).
July 31, 2023 - NAESB Report for Submittal to the Commission on WEQ Standards for Business Practices and Communication Protocols for Public Utilities, Version 004 (Docket No. RM05-5).
July 28, 2023 - Michael Desselle Correspondence to NAESB Members
January 30, 2023 - NAESB Comments Submitted to the Transportation Safety Administration on Advanced Notice of Proposed Rulemaking issued November 30, 2022 for Enhancing Surface Cyber Risk Management (Docket No. TSA-2022-0001)
August 1, 2022 - NAESB Correspondence to FERC and NERC
July 29, 2022 - Joint FERC-NERC Letter to NAESB
November 16, 2021 - FERC, NERC, and Regional Entity Staff Report - The February 2021 Cold Weather Outages in Texas and the South Central United States
September 23, 2021 - February 2021 Cold Weather Grid Operations Preliminary Findings and Recommendations
September 2, 2021 - Green Button Ontario Regulation 633/21.
July 16, 2021 - Correspondence from Valerie Crockett regarding FERC Order 587-Z action on WGQ Version 3.2 Standards
July 15, 2021 - FERC Final Rule - Standards for Business Practices of Interstate Natural Gas Pipelines (Docket No. RM96-1-042; Order No. 587-Z)
June 21, 2021 - NAESB Informational Status Update on NAESB Standard Development Efforts to Support FERC Order Nos. 841 and 2222 (Docket No. RM05-5-000)
May 21, 2021 - Correspondence from Michael Desselle regarding FERC Order 676-J action on WEQ Version 003.3 Standards
May 20, 2021 - FERC Final Rule - Standards for Business Practices and Communication Protocols for Public Utilities (Docket Nos. RM05-5-029 and RM05-5-030; Order No. 676-J)
March 19, 2021- NAESB Comments Submitted to FERC on NOPR issued February 18, 2021 for (WGQ Version 3.2) Standards for Business Practices of Interstate Natural Gas Pipelines (Docket No. RM96-1-042).
February 18, 2021 - FERC Notice of Proposed Rulemaking (WGQ, Version 3.2) Standards for Business Practices of Interstate Natural Gas Pipelines (Docket No. RM96-1-042).
November 25, 2020 - FERC Order on Clarification re Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-028).
August 17, 2020 - NAESB WGQ Version 3.2 Report
July 17, 2020 - FERC Revisions to the Filing Process for Commission Forms (Docket No. RM19-12-000).
July 16, 2020 - FERC Notice of Proposed Rulemaking (WEQ, Version 003.3) Standards for Business Practices and Communication Protocols for Public Utilities (Docket Nos. RM05-5-029, RM05-5-030).
June 3, 2020 - FERC Notice of Procedures for Making Statutory Filings When Authoritzation for New or Revised Tariff Provisions is Not Required - Electronic Tariff Filings (Docket No. RM01-5-000).
April 3, 2020 - FERC Formal Notice of Extension of Time re Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-028).
March 30, 2020 - NAESB WEQ Version 003.3 Report
February 28, 2020 - Correspondence from Michael Desselle regarding FERC Order 676-I action on WEQ Version 003.2 Standards
February 10, 2020 - NAESB Status Report to the Commission Concerning Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-027).
February 4, 2020 - FERC Final Rule (WEQ, Version 003.2) Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-025; Docket No. RM05-5-026; Docket No. RM05-5-027, Order No. 676-I).
July 23, 2019 - NAESB Wholesale Electric Quadrant Version 003.2 Errata Filing - Standards for Business Practices and Communication Protocols for Public Utilities Notice of Proposed Rulemaking (Docket No. RM05-5-027)
July 23, 2019 - NAESB Submittal to the Commission on the Parallel Flow Visualization Project Status (Docket No. EL14-82-000).
June 20, 2019 - FERC Final Rule (Order No. 859) Revisions to the Filing Process for Commission Forms (Docket No. RM19-12-000).
June 5, 2019 - FERC Errata to the 5/16/2019 NOPR (WEQ Version 003.2) Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-027).
June 5, 2019 - NAESB Comments Submitted to FERC on NOPR issued May 16, 2019 for (WEQ Version 003.2) Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-027).
May 16, 2019 - FERC NOPR (WEQ Version 003.2) Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-027).
January 17, 2019 - FERC Notice of Proposed Rulemaking, Revisions to the Filing Process for Commission Forms (Docket No. RM19-12-000).
November 28, 2018 - NAESB Comments in Response to FERC Standards for Business Practices and Communication Protocols for Public Utilities Notice of Proposed Rulemaking issued on October 4, 2018 (Docket No. RM05-5-026).
November 15, 2018 - FERC Final Rule (WGQ Version 3.1) Standards for Business Practices of Interstate Natural Gas Pipelines (Docket No. RM96-1-041, Order No. 587-Y).
November 1, 2018 - NAESB Submittal to the Commission on the Parallel Flow Visualization Project Status (Docket No. EL14-82-000).
October 4, 2018 - FERC NOPR (WEQ Version 003) Standards for Business Practices and Communication Protocols for Public Utilities, WEQ-006 Time Error Correction Business Practice Standards (Docket No. RM05-5-026).
August 21, 2018 - FERC NOPR (WGQ Version 3.1) Standards for Business Practices of Interstate Natural Gas Pipelines (Docket No. RM96-1-041).
December 8, 2017 - NAESB Report to FERC on WEQ Standards for Business Practices and Communication Protocols for Public Utilities, Version 003.2 (Docket No. RM05-5-000).
October 2, 2017 - NAESB Submittal to the Commission on the Parallel Flow Visualization Project Status (Docket No. EL14-82-000).
September 29, 2017 - NAESB Report to FERC on WGQ Standards for Business Practices of Interstate Natural Gas Pipelines, Version 3.1 (Docket No. RM96-1 et al.).
August 24, 2017 - NAESB Letter to K. John Holmes, National Academy of Sciences in Response to the NAS Report.
August 24, 2017 - NAESB Letter to Dr. M. Granger Morgan, Carnegie Mellon University in Response to the NAS Report.
August 23, 2017 - The Secretary of Energy, Rick Perry Grid Study Cover Letter.
August 2017 - DOE Staff Report to the Secretary on Electricity Markets and Reliability.
June 9, 2017 - NAESB Comments to the Office of the United States Trade Representative regarding NAFTA Negotiations; Docket No. USTR-2017-0006.
April 12, 2017 - Correspondence to Rae McQuade from Chairman LaFleur regarding FERC Order No. 809, Coordination of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities (Docket No. RM14-2-000) - with FERC Stamp.
April 12, 2017 - Correspondence to Rae McQuade from Chairman LaFleur regarding FERC Order No. 809, Coordination of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities (Docket No. RM14-2-000).
March 30, 2017 - NAESB Status Report for Submittal to the Commission Concerning FERC Order No. 809, Coordination of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities (Docket No. RM14-2-000).
March 27, 2017 - NAESB Status Report on the Reservation of WEQ-006 Manual Time Error Correction Business Practice Standards (Docket Nos. RM05-5-000 and RD17-1-000).
December 20, 2016 - NAESB Status Report for Submittal to the Commission Concerning FERC Order No. 809, Coordination of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities (Docket No. RM14-2-000).
October 26, 2016 - Correspondence from Rae McQuade to Chairman Bay regarding Gas-Electric Coordination Standards Development.
October 18, 2016 - Correspondence to Rae McQuade from Chairman Bay regarding Gas-Electric Coordination Standards Development.
October 17, 2016 - NAESB Submittal to the Commission on the Parallel Flow Visualization Project Status (Docket No. EL14-82-000).
October 17, 2016 - NAESB Status Report for Submittal to the Commission Concerning FERC Order No. 809, Coordination of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities (Docket No. RM14-2-000).
September 28, 2016 - Energy Intelligence Meets With Chairman Bay, FERC on Gas Price Reporting
July 29, 2016 - NAESB Status Report for Submittal to the Commission Concerning FERC Order No. 809, Coordination of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities (Docket No. RM14-2-000).
July 21, 2016 - FERC NOPR (WEQ Version 003.1) Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-025).
June 23, 2016 - FERC Notice Granting Limited Extension of Time: re Standards for Business Practices and Communication Protocols for Public Utilities (WEQ, Version 003), Docket No. RM05-5-022.
March 17, 2016 - FERC Notice Granting Limited Time Extension: re Standards for Business Practices and Communication Protocols for Public Utilities (WEQ, Version 003), Docket No. RM05-5-022.
January 29, 2016 - NAESB Status Report on the Parallel Flow Visualization Project (Docket No. EL14-82-000).
January 25, 2016 - FERC vs. Electric Power Supply Association (Docket No. 14-840).
January 15, 2016 - FERC Proposed rule; request for comment on filing (NAESB Wholesale Gas Quadrant Version 3.0 Errata Filing (Minor Correction MC15021)), Standards for Business Practices of Interstate Natural Gas Pipelines (Docket No. RM96-1-040)
January 14, 2016 - NAESB Notice to FERC of Correction to Version Cross Reference – Report on Version 3.0 of the NAESB Wholesale Gas Quadrant Standards for Business Practices of Interstate Natural Gas Pipelines (Docket No. RM 96-1-038)
January 13, 2016 - Sample Tariff Record, General Terms and Conditions in Compliance with 18 CFR, Section 284.12 under Docket No. RM96-1.
January 11, 2016 - NAESB Wholesale Gas Quadrant Version 3.0 Errata Filing - Standards for Business Practices of Interstate Natural Gas Pipelines (Docket No. RM 96-1-038)
December 22, 2015 - NAESB Status Report for Submittal to the Commission Concerning FERC Order No. 809, Coordination of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities (Docket Nos. RM14-2-000).
November 19, 2015 - FERC Order No 771-B, Order on Rehearing and Clarification - Availability of E-Tag Information to Commission Staff (Docket No. RM11-12-001)
November 13, 2015 - FERC Notice of Technical Conference - Collection of Connected Entity Data from Regional Transmission Organizations and Independent System Operators (Docket No. RM15-23-000).
October 26, 2015 - NAESB Report to FERC on Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-000), WEQ Version 003.1
October 16, 2015 - FERC Final Rule (WGQ Version 3.0); Order No. 587W regarding Standards for Business Practices of Interstate Natural Gas Pipelines; Coordination of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities (Docket Nos. RM96-1-038 and RM14-2-003).
October 15, 2015 - Order Establishing Default Interpretations for Capacity Release Contracts re Coordination of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities (Docket No. RM14-2-002).
September 25, 2015 - Errata for NAESB Wholesale Gas Quadrant (WGQ) Standards for Business Practices of Interstate Natural Gas Pipelines, Versions 2.0, 2.1 and 3.0 (Docket Nos. RM 96-1-038).
September 25, 2015 - NAESB Status Report on the Development of Modeling, Data, and Analysis Business Practice Standards (Docket Nos. RM05-5-000 and RM14-7-000).
September 17, 2015 - FERC Notice of Proposed Rulemaking - Collection of Connected Entity Data from Regional Transmission Organizations and Independent System Operators (Docket No. RM15-23-000).
September 17, 2015 - FERC Order No. 809 Order on Rehearing (Docket No. RM14-2-001).
August 4, 2015 - NAESB Update Report Concerning FERC Order No. 809 (Docket No. RM14-2-000).
July 31, 2015 - FERC Order on Rehearing for Clarification and Notice of Comment Procedures (Docket No. RM14-2-002; Order No. 809).
July 16, 2015 - FERC NOPR (WGQ Version 3.0) Standards for Business Practices of Interstate Natural Gas Pipelines (Docket No. RM96-1-038).
July 6, 2015 - FERC Filing: Coordination of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities - Errata for NAESB WGQ Standards, Version 2.0 to support FERC Order No. 809 (Docket No. RM14-2-000).
July 6, 2015 - FERC Filing: Standards for Business Practices of Interstate Natural Gas Pipelines - Errata for NAESB WGQ Standards, Version 3.0 to support FERC Order No. 809 (Docket No. RM96-1 et al).
June 12, 2015 - FERC Order Granting Rehearing for Further Consideration (Docket No. RM14-2-001; Order No. 809).
May 1, 2015 - FERC Notice of Technical Conference (June 10, 2015) with NAESB on Order Instituting Proceeding to Develop Electroinc Filing Protocols for Commission Forms (Docket No. AD15-11-000).
April 16, 2015 - FERC Order No. 676-H Order on Rehearing (Docket No. RM05-5-024).
April 16, 2015 - FERC Final Rule Coordinating of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities (Docket No. RM14-2-000; Order No. 809).
April 16, 2015 - FERC Order Instituting Proceeding to Develop Electronic Filing Protocols for Commission Forms (Docket No. AD15-11-000).
March 25, 2015 - NAESB Status Report on the Parallel Flow Visualization Project (Docket No. EL14-82-000).
January 28, 2015 - NAESB Status Report on the Parallel Flow Visualization Project (Docket No. EL14-82-000).
January 15, 2015 - FERC Notice Granting Limited Time Extension, Standards for Business Practices and Communication Protocols for Public Utilities, Ordert No. 676-H (Docket No. RM05-5-024)
December 18, 2014 - NAESB Letter to ANSI Request to Consider the Development of Additional Energy Efficiency Standards
December 18, 2014 - NAESB Status Report to FERC on Modifications to Support FERC Order No. 676-H, Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-022)
December 18, 2014 - NAESB Status Report on the Development of Modeling, Data, and Analysis Business Practice Standards (Docket Nos. RM05-5-000 and RM14-7-000)
November 26, 2014 - NAESB Report to FERC in response to the Gas Electric Harmonization NOPR on Coordination of the Scheduling Process of Interstate Natural Gas Pipelines and Public Utilities issued by the Commission on March 20, 2014 (Docket No. RM14-2-000).
November 14, 2014 - NAESB Report to FERC on WGQ Standards for Business Practices of Interstate Natural Gas Pipelines, Version 3.0 (Docket No. RM96-1 et al.)
October 15, 2014 - FERC Notice of filing (NAESB GEH Report 9/29/2014) re Coordination of the Scheduling Processes for Interstate Natural Gas Pipelines and Public Utilities under Docket No. RM14-2-000 issued by the Commission on March 20, 2014.
October 3, 2014 - FERC Errata to Final Rule (WEQ Version 003) Standards for Business Practices and Communications Protocols for Public Utilities (Docket No. RM05-5-022; Order No. 676-H).
September 30, 2014 - Correspondence from Michael Desselle regarding FERC Order 676-H action on WEQ Version 003 Standards
September 29, 2014 - NAESB Report to FERC in response to the Gas Electric Harmonization NOPR on Coordination of the Scheduling Process of Interstate Natural Gas Pipelines and Public Utilities in Docket No. RM14-2-000 issued by the Commission on March 20, 2014.
September 18, 2014 - FERC Final Rule (WEQ Version 003) Standards for Business Practices and Communications Protocols for Public Utilities (Docket No. RM05-5-022; Order No. 676-H).
August 25, 2014 - NAESB Comments in response to the Commission's NOPR on Modeling, Data, and Analysis Reliability Standards (Docket No. RM14-7-000).
July 17, 2014 - FERC NOPR on Natural Gas Act Pipeline Maps (Docket No. RM14-21-000).
July 11, 2014 - NAESB Status Report on the Parallel Flow Visualization Project (Docket No. EL14-82-000).
June 19, 2014 - FERC NOPR on Modeling, Data, and Analysis Reliability Standards (Docket No. RM14-7-000).
June 18, 2014 - NAESB Report to FERC in response to the NOPR on Coordination of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities issued on March 20, 2014 (Docket No. RM14-2-000).
April 29, 2014 - NAESB Comments in Response to OMB NOPR - “Federal Participation in the Development and Use of Voluntary Consensus Standards and in Conformity Assessment Activities”
March 20, 2014 - FERC Notice of Proposed Rulemaking, Coordination of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities, (Docket No. RM14-2-000).
March 20, 2014 - FERC Order initiating investigation into ISO and RTO scheduling practices and establishing paper hearing procedures, California Independent System Operator Corporation, et. al., (Docket Nos. EL14-22-000, et. al).
March 20, 2014 - FERC Order to show cause, Posting of Offers to Purchase Capacity, (Docket No. RP14-442-000).
February 11, 2014 - FERC Order Denying Rehearing (Docket No. RM05-5-023).
January 29, 2014 - Comments of the North American Energy Standards Board regarding the Notice of Proposed Rulemaking issued by the Office of the Federal Register, National Archives and Records Administration on October 2, 2013 [OFR-2013-0001].
November 27, 2013 - FERC Filing: Standards for Business Practices of Interstate Natural Gas Pipelines - WGQ errata to Versions 2.0 and 2.1 (Docket Nos. RM 96-1 et al).
November 27, 2013 - FERC Filing: Standards for Business Practices and Communication Protocols for Public Utilities - WEQ errata to Version 003 (Docket Nos. RM05-5-000, RM05-5-022).
November 15, 2013 - FERC Order No. 787 Final Rule - Communication of Operational Information Between Natural Gas Pipelines and Electric Transmission Operators (Docket No. RM13-17-000; Order No. 787).
July 24, 2013 - Errata Notice - Corrected NAESB Report to FERC Concerning the WGQ Version 2.1 Standards (Docket No. RM96-1 et al).
July 23, 2013 - Corrected NAESB Report to FERC Concerning the WGQ Version 2.1 Standards (Docket No. RM96-1 et al).
July 23, 2013 - NAESB Report to FERC Concerning the WGQ Version 2.1 Standards (Docket No. RM96-1 et al).
July 18, 2013 - FERC NOPR - Communication of Operational Information Between Natural Gas Pipelines and Electric Transmission Operators - (Docket No. RM13-17-000).
July 18, 2013 (WEQ-V003) - FERC NOPR on Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-022).
April 18, 2013 - NAESB Report to FERC regarding NAESB Copyright Procedure Regarding Member and Purchaser Self-Executing Waiver (Filed in Docket Nos. RM05-05-000 and RM96-1-000).
April 8, 2013 - NAESB Comments in response to the National Institute of Standards and Technology (NIST) Request for Information on "Developing a Framework to Improve Critical Infrastructure Cybersecurity."
March 8, 2013 - FERC Order on Rehearing and Clarification (Order No. 771-A) - Availability of E-Tag Information to Commission Staff (Docket No. RM11-12-001; Order No. 771-A).
March 8, 2013 - FERC Notice of Technical Conference (Docket Nos. RM07-16-000 Filing via the Internet, RM01-5-000 Electronic Tariff Filings, RM12-3-000 Revisions to Electric Quarterly Report Filing Process).
March 5, 2013 - FERC Notice of Technical Conference (Docket No. AD12-12-000).
February 21, 2013 - FERC Final Rule - NAESB Standards for Business Practices and Communication Protocols for Public Utilities (Demand Response and Energy Efficiency Measurement and Verification Standards)-(Docket No. 05-5-020, Order No. 676-G).
February 7, 2013 - FERC Order describing a change to the company registration system used for eTariff filings (Docket Nos. RM07-16-000, RM01-5-000).
January 29, 2013 - NAESB Report to FERC regarding Modifications to the NAESB Public Key Infrastructure Standards and other Standards to support the Public Key Infrastructure (Docket Nos. RM05-5-000 and RM05-5-022).
December 20, 2012 - NAESB filing regarding errata to Version 003 of the NAESB WEQ business practice standards - Docket Nos. RM05-5-000, RM05-5-022).
November 30, 2012 - NAESB Status Report to FERC regarding NAESB Public Key Infrastructure (WEQ-012) - Docket Nos. RM05-05-000 and RM05-05-022.
November 14, 2012 - NARUC Resolution on NAESB Gas-Electric Harmonization Committee Report.
November 20, 2012 - NAESB Report to FERC regarding the NAESB Copyright Policy
October 18, 2012 - NAESB Electric Industry Registry (EIR) Expected to Replace NERC TSIN Registry on November 13, 2012.
September 18, 2012 - FERC Filing: Standards for Business Practices of Public Utilities (Docket No. RM 05-5 et al), NAESB WEQ Version 003
July 20, 2012 - FERC Order Requiring Reporting on North American Energy Standards Board Public Key Infrastructure Standards (Docket No. EL12-86-000)
July 19, 2012 - NAESB Response to Senator Reid Letter.
July 18, 2012 - Letter Received from Senator Reid.
July 19, 2012 - FERC Final Rule: Standards for Business Practices of Interstate Natural Gas Pipelines (WGQ, Version 2.0), (Docket No. RM96-1-037; Order No.587-V).
July 17, 2012 - FERC Filing: Standards for Business Practices and Communication Protocols for Public Utilities - WEQ Minor Correction for WEQ-021, Measurement and Verification of Energy Efficiency Products (Docket Nos. RM05-5-000, RM05-5-020).
July 5, 2012 - FERC Notice of Technical Conferences on Coordination between Natural Gas Electricity Markets (Docket No. AD12-12-000).
June 22, 2012 - FERC Final Rule: Integration of Variable Energy Resources (Docket No. RM10-11-000; Order No. 764).
June 22, 2012 - NAESB Comments to the Federal Energy Regulatory Commission on Coordination Between the Natural Gas and Electricity Markets, (Docket No. AD12-12-000).
June 18, 2012 - FERC Notice Extending Comment Period: Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-020) - WEQ measurement and verification of demand response and energy efficiency resources participating in organized wholesale electricity markets.
June 14, 2012 - FERC Filing: Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-020) - WEQ Minor Corrections Measurement and Verification of Energy Efficiency Products (WEQ-021) business practice standards and one related Abbreviation and Acronym (WEQ-000).
May 31, 2012 - Comments of the North American Energy Standards Board regarding the request for comments issued by the Office of the Federal Register, National Archives and Records Administration on February 27, 2012 [NARA 12-0002].
May 4, 2012 - FERC Filing: Standards for Business Practices of Interstate Natural Gas Pipelines - WGQ Minor Corrections for Version 2.0 (Docket Nos. RM 96-1 et al)
April 25, 2012 - FERC Errata Notice - Notice of Proposed Rulemaking for the Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-020).
April 24, 2012 - Federal Register posting, Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05–5–020).
April 19, 2012 - FERC Notice of Proposed Rulemaking in Docket No. RM05-5-020 regarding the NAESB WEQ standards for the measurement and verification of demand response and energy efficiency resources participating in organized wholesale electricity markets.
March 30, 2012 - FERC Filing: Comments of NAESB in response to the Request for Comments on the Coordination between Natural Gas and Electricity Markets (Docket No. AD12-12-000)
March 26, 2012 - Comments of NAESB in response to the Notice Providing for Reply Comments on the Availability of e-Tag Information (Docket No. RM11-12-000)
March 23, 2012 - FERC Filing: Standards for Business Practices of Interstate Natural Gas Pipelines - WGQ Minor Corrections for Version 2.0 (Docket No. RM96-1-037)
March 2, 2012 - Availability of E-Tag Information to Commission Staff - Notice Providing For Reply Comments, Docket No. RM11-12-000
February 22, 2012 - Federal Register posting, Standards for Business Practices for Interstate Natural Gas Pipelines (WGQ Version 2.0) (Docket No. RM96-1-037)
February 16, 2012 - FERC NOPR - Standards for Business Practices for Interstate Natural Gas Pipelines (WGQ Version 2.0) (Docket No. RM96-1-037)
February 15, 2012 - FERC Notice Assigning Docket No. and Requesting Comments - Coordination between Natural Gas and Electricity Markets (Docket No. AD12-12-000)
Due Date Extended to March 30, 2012 - FERC Request for Comments of Commissioner Moeller on Coordination between the Natural Gas and Electricity Markets
February 3, 2012 - FERC Request for Comments of Commissioner Moeller on Coordination between the Natural Gas and Electricity Markets
January 25, 2012 - NAESB WEQ Minor Corrections on SAMTS Filing: Submittal for NAESB Standards Development to Support Coordination of Requests for Transmission Service Across Multiple Transmission Systems (Docket No. RM05-5-013, Order No. 676-E)
December 21, 2011 - FERC Filing: Standards for Business Practices of Interstate Natural Gas Pipelines - WGQ Minor Corrections for Versions 1.9 and 2.0 (Docket Nos. RM 96-1-et al)
October 11, 2011 - FERC Filing: Standards for Business Practices of Interstate Natural Gas Pipelines - WGQ Minor Corrections for Version 2.0 (Docket Nos. RM 96-1-et al)
October 7, 2011 - NAESB WEQ SAMTS Filing - Submittal for NAESB Standards Development to Support Coordination of Requests for Transmission Service Across Multiple Transmission Systems (Docket No. RM05-5-013, Order No. 676-E)
August 15, 2011 - NAESB Comments on ZigBee Alliance - Smart Energy 2.0
July 21, 2011 - FERC Final Rule - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (Docket No. RM10-23-000); Order No. 1000
July 7, 2011 - FERC Filing: Submittal of Smart Grid Related Standards (Docket No. RM05-5-000,et-al)
2011 Report to Congress on the Benefits and Costs of Federal Regulations and Unfunded Mandates on State, Local, and Tribal Entities - Office of Management and Budget (Office of Information and Regulatory Affairs)
June 28, 2011 - FERC Filing: Standards for Business Practices of Interstate Natural Gas Pipelines - WGQ Minor Corrections for Versions 1.9 and 2.0 (Docket No. RM96-1-et-al)
June 20, 2011 - FERC Filing: NAESB Supplemental/Additional Information - WEQ Minor Corrections for Version 002.1 (Docket No. RM05-5-000)
May 16, 2011 - NAESB Nomination to the Commodity Futures Trading Commission (CFTC) for the Subcommittee on Data Standardization under the Technology Advisory Committee
April 30, 2011 - FERC Filing: NAESB Submittal for Measurement and Verification of Demand Response Products (Docket No. RM05-5-000)
April 21, 2011 - News Release: FERC Seeks Data to Enhance Market Monitoring Capabilities (FERC Notice of Proposed Rulemaking on Availability of E-Tag Information to Commission Staff (Docket No. RM11-12-000))
April 21, 2011 - FERC Notice of Proposed Rulemaking on Availability of E-Tag Information to Commission Staff (Docket No. RM11-12-000)
March 9, 2011 - NAESB Progress Report on Standards Development to Support Coordination of Requests for Transmission Service Across Multiple Transmission Systems (Docket No. RM05-5-013, Order No. 676-E)
March 4, 2011 - NAESB Wholesale Gas Quadrant (WGQ) Version 2.0 Report to FERC: Standards for Business Practices of Interstate Natural Gas Pipelines (Docket No. RM 96-1 et al)
March 2, 2011 - NAESB Comments in response to the Notice of Proposed Rulemaking on “Integration of Variable Energy Resources” (Docket No. RM10-11-000), issued by FERC on November 18, 2010.
March 2, 2011 - NAESB Comments in response to the FERC Technical Conference, RE: Smart Grid Interoperability Standards (Docket No. RM11-2-000)
February 7, 2011 - North American Energy Standards Board in response to the National Institute of Standards and Technology request for information on Effectiveness of Federal Agency Participation in Standardization in Select Technology Sectors for National Science and Technology Council’s Sub-Committee on Standardization, [Docket Number 0909100442-0563-02]
December 8, 2010 - Effectiveness of Federal Agency Participation in Standardization in Select Technology Sectors for National Science and Technology Council's Sub-Committee on Standardization - Request for Information - [Docket No. 0909100442-0563-02]
November 18, 2010 - FERC NOPR - Integration of Variable Energy Resources (VERs) - Docket No. RM10-11-000
October 21, 2010 - FERC Notice of Inquiry - Capacity Transfers on Intrastate Natural Gas Pipelines
October 7, 2010 - FERC NEWS - FERC takes first step in smart grid rulemaking process
October 6, 2010 - NIST Correspondence to FERC regarding Smart Grid Standards
July 15, 2010 - FERC Order 729-B - Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability Margins, Total Transfer Capability, and Existing Transmission Commitments; Mandatory Reliability Standards for the Bulk-Power System; and Standards for Business Practices and Communications Protocols for Public Utilities (Docket Nos. RM08-19-003, RM05-5-019)
July 8, 2010 - NAESB Progress Report on Standards Development to Support Coordination of Requests for Tranmission Service Across Multiple Transmission Systems (Docket No. RM05-5-013, Order No. 676-E)
May 5, 2010 - FERC Order 729-A - Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability Margins, Total Transfer Capability, and Existing Transmission Commitments and Mandatory Reliability Standards for the Bulk-Power System (Docket No. RM08-19-002; Order No. 729-A)
April 28, 2010 - NAESB Comments on "Time Error Correction Reliability Standard" (Docket No. RM09-13-000) WEQ-006 Business Practice Standards - Version 002.1
April 15, 2010 - FERC Final Rule - WEQ Phase 1 DR M&V - Standards for Business Practices and Communication Protocols for Public Utilities - (Docket No. RM05-5-017; Order No. 676-F).
April 8, 2010 - NAESB Comments on “Draft National Action Plan on Demand Response” (Docket No. AD09-10-000)
March 26, 2010 - NAESB Comments to the FERC Notice of Inquiry - Transmission Loading Relief Reliability Standard and Curtailment Priorities (Docket No. RM10-9-000)
March 23, 2010 - Testimony of Commissioner John Norris, FERC, Before the Subcommittee on Energy and the Environment Of the Committee on Energy and Commerce United States House of Representatives Oversight Hearing for the Federal Energy Regulatory Commission
March 24, 2010 - FERC Final Rule - Standards for Business Practices for Interstate Natural Gas Pipelines (WGQ Version 1.9) (Docket Nos. RM96-1-030 and RM96-1-036; Order No. 587-U)
March 18, 2010 - FERC NOPR - Time Error Correction Reliability Standard (Docket No. RM09-13-000)
March 11, 2010 - FERC Draft for Comment of the National Action Plan on Demand Response (Docket No. AD09-10)
January 21, 2010 - FERC Order No. 713-B - Order Denying Request for Rehearing and Clarification (Docket No. RM08-7-002)
January 21, 2010 - FERC Notice of Inquiry - Transmission Loading Relief Reliability Standard and Curtailment Priorities (Docket No. RM10-9-000)
January 21, 2010 - FERC Order Establishing Procedures Relating to Tariffs Filed Electronically – (Docket No. RM01-5-000)
January 19, 2010 - NIST Framework and Roadmap for Smart Grid Interoperability Standards, Release 1.0
December 16, 2009 - NAESB Report to FERC on WEQ Version 2.1 Errata Filing - (Docket No. RM05-5 et al)
November 24, 2009 - FERC Final Rule Docket No. RM08-19-000, et al.; Order No. 729.
November 24, 2009 - FERC Final Rule Docket No. RM05-5-013; Order No. 676-E - FERC Action on NAESB WEQ version 002.1 standards.
November 19, 2009 - FERC Order on Clarification - Docket Nos. RM05-17-005 and RM05-25-005; Order No. 890-D.
November 19, 2009 - FERC NOPR on NAESB WGQ version 1.9 standards (Docket No. RM96-1-036).
November 9, 2009 - NAESB Comments to NIST on the Framework Document.
November 6, 2009 - NAESB Comments to NIST on the Draft Smart Grid Interoperability Panel and Governing Board Charter.
October 20, 2009 - NAESB Report to the FERC regarding errata to WGQ Standards, Version 1.9 (Docket No. RM96-1 et al).
October 9, 2009 - NAESB Report to the FERC regarding errata to WEQ Standards, Versions 001, 002.0 and 002.1 (Docket No. RM05-5 et al).
October 2, 2009 - NAESB Filing to the FCC - Comments – NBP Public Notice #2, GN Docket Nos. 09-47, 09-51 and 09-137
September 2009 - FERC Strategic Plan FY 2009-2014
September 30, 2009 - NAESB Report to FERC on WGQ Version 1.9 Standards (Docket No. RM96-1 et al)
September 24, 2009 - NIST Framework and Roadmap for Smart Grid Interoperability Standards Release 1.0 (Draft).
September 17, 2009 - FERC NOPR on NAESB WEQ DR M&V Standards (Docket No. RM05-5-017).
September 17, 2009 - FERC Press Release - FERC Acts to Expand Demand Response with New Measurement Standards (Docket No. RM05-5-017).
September 10, 2009 - FERC Assessment of Demand Response & Advanced Metering Staff Report
July 30, 2009 - NAESB Comments to "Report to NIST on the Smart Grid Interoperability Standards Roadmap" (Contract No. SB1341-09-CN-0031--Deliverable 7) prepared by EPRI.
July 16, 2009 - FERC Policy Statement - Smart Grid Policy - (Docket No. PL09-4-000).
July 16, 2009 - FERC NOPR - Standards for Business Practices for Interstate Natural Gas Pipelines - (Docket No. RM96-1-030).
July 16, 2009 - FERC NOPR - Contract Reporting Requirements of Intrastate Natural Gas Companies - (Docket No. RM09-2-000).
July 9, 2009 - NAESB Report to NIST.
July 7, 2009 - NAESB Report to FERC on WEQ Version 2.1 Errata Filing - (Docket No. RM05-5 et al)
June 18, 2009 - FERC Demand Response Presentation - A National Assessment of Demand Response Potential
June 18, 2009 - FERC Demand Response Report - A National Assessment of Demand Response Potential
June 17, 2009 - Interim Smart Grid Roadmap NIST Restructure
May 20, 2009 - FERC Order granting rehearing for further consideration re Preventing Undue Discrimination and Preference in Transmission Services under RM05-17 et al.
April 17, 2009 - NAESB Report on Wholesale Electric Market Measurement and Verification Standards for Demand Response Products and Services (Docket No. RM05-5-000).
March 30, 2009 - FERC Order on Requests for Waiver - Standards for Business Practices and Communication Protocols for Public Utilities; Duke Energy Carolinas, LLC (Docket Nos. RM05-5-000; OA08-50-002).
March 19, 2009 - FERC NOPR - Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability Margins, Total Transfer Capability, and Existing Transmission Commitments and Mandatory Reliability Standards for the Bulk-Power System (Docket Nos. RM08-19-000, RM08-19-001, RM09-5-000, RM06-16-005).
March 19, 2009 - Statement of Commissioner Philip D. Moeller on Reliability of our Nation’s Bulk Power System (Docket Nos. RM05-17-004, RM05-25-004, RM05-5-013, RM08-19-000, RM09-5-000, and RM06-16-005).
March 19, 2009 - FERC Proposed Policy Statement and Action Plan - Smart Grid Policy (Docket No. PL09-4-000).
March 19, 2009 - FERC Order No. 890-C (Docket Nos. RM05-17-004 and RM05-25-004).
March 19, 2009 - FERC Notice of Proposed Rulemaking on NAESB WEQ Version 2.1 (Docket No. RM05-5-013).
March 12, 2009 - NAESB WEQ Version 002.1 Supplemental Filing (Docket No. RM05-5 et al).
March 11, 2009 - FERC Notice Clarifying Implementation Date and Compliance Date (Docket No. RM96-1-029).
March 10, 2009 - FERC Notice of Technical Conference regarding Electronic Tariff Filing (Docket No. RM01-5-000.
February 24, 2009 - FERC Final Rule - Standards for Business Practices for Interstate Natural Gas Pipelines (Docket No. RM96-1-029; Order No. 587-T) - FERC Adopts Version 1.8 of the NAESB WGQ Standards.
February 19, 2009 - NAESB Report Re: Standards for Business Practices of Public Utilities (Docket No. RM 05-5 et al) - WEQ Version 002.1 - without Appendices
February 19, 2009 - NAESB Report Re: Standards for Business Practices of Public Utilities (Docket No. RM 05-5 et al) - WEQ Version 002.1 - with Appendices
November 21, 2008 - FERC Order 712-A Promotion of a More Efficient Capacity Release Market (Docket No. RM08-1-001).
November 20, 2008 - FERC Order 720 - Pipeline Posting Requirements under Section 23 of the Natural Gas Act (Docket No. RM08-2-000).
November 14, 2008 - NAESB Report to the FERC to Supplement the August 29, 2008 Version 002 WEQ Standards Filing: "Standards for Business Practices of Public Utilities (Docket Nos. RM05-17-000 and RM05-5-000).
October 28, 2008 - Electronic Tariff Filings - Notice of Effectiveness of Regulations (Docket No. RM01-5-000).
October 24, 2008 - FERC Notice of Technical Conference regarding Electronic Tariff Filing (Docket No. RM01-5-000).
October 16, 2008 - FERC Final Rule on Docket No. RM07-1-000; Order 717, Standards of Conduct for Transmission Providers.
September 19, 2008 - FERC Final Rule on Docket No. RM01-5-000; Order 714, Electronic Tariff Filings.
September 18, 2008 - Federal Energy Regulatory Commission (FERC) issuance (Docket(s): RM01-5-000) - FERC Finalizes Electronic Filing of Tariffs under RM01-5.
September 18, 2008 - the Federal Energy Regulatory Commission (FERC) Notice of Proposed Rulemaking re Standards for Business Practices of Interstate Natural Gas Pipelines under RM96-1 (Docket(s): RM96-1-029).
September 3, 2008 - Standards for Business Practices for Interstate Natural Gas Pipelines (Docket No. RM96-1-027).
August 29, 2008 - NAESB Report to the FERC on Order Nos. 890, 890-A, WEQ Version 002 Filing - Standards for Business Practices of Public Utilities (Docket No. RM 05-5 et al) - without Appendices.
August 29, 2008 - NAESB Report to the FERC on Order Nos. 890, 890-A, WEQ Version 002 Filing - Standards for Business Practices of Public Utilities (Docket No. RM 05-5 et al) - with Appendices.
July 21, 2008 - Docket No. RM05-5-005; Order No. 676-C - Standards for Business Practices and Communication Protocols for Public Utilities
July 8, 2008 - Preventing Undue Discrimination and Preference in Transmission Service (Docket Nos. RM05-17-001 and RM05-25-001) - FERC Grants NAESB's Request for Extension of Time for Compliance Filing in response to Paragraph 592 of Order No. 890-A.
July 3, 2008 - Preventing Undue Discrimination and Preference in Transmission Service (Docket Nos. RM05-17-001 and RM05-25-001) - Request of NAESB for an Extension of Time for Compliance Filing in response to Paragraph 592 of Order No. 890-A.
June 23, 2008 - FERC Docket Nos. RM05-17-003 and RM05-25-003; Order No. 890-B - Preventing Undue Discrimination and Preference in Transmission Service
June 19, 2008 - FERC Docket No. RM08-1-000; Order No. 712 - Promotion of a More Efficient Capacity Release Market
April 29, 2008 - Notice of Extension of Time - Preventing Undue Discrimination and Preference in Transmission Service - Docket Nos. RM05-25-000 and RM05-17-000).
April 21, 2008 - Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-005) - acting on WEQ Version 1 Standards.
April 17, 2008 - Supplemental Notice of Proposed Rulemaking re Electronic Tariff Filings under RM01-5.
April 17, 2008 - Request of the North American Electric Reliability Corporation (NERC) for an additional extension of time for compliance filing in response to paragraph 223 of Order No. 890.
April 16, 2008 - Correspondence Regarding the Joint Interface Committee of the IRC, NERC and NAESB.
April 15, 2008 - NAESB eTariff Submittal for "Electronic Tariff Filings" (Docket No. RM01-5-000).
April 11, 2008 - Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-000) - NAESB report regarding errata to Version 1.0 of the NAESB WEQ Standards provided to the Commission on 12/21/07.
March 21, 2008 - FERC Notice of Proposed Rulemaking - Standards of Conduct for Transmission Providers, Docket No. RM07-1-000.
December 28, 2007 - Preventing Undue Discrimination and Preference in Transmission Service (Docket Nos. RM05-17-001, 002 and RM05-25-001, 002; Order No. 890-A) (Rehearing on Order 890)
December 21, 2007 - Petition of the North American Electric Reliability Corp. for Approval of Proposed Reliability Standard in Docket RM08-7 - File 1 of 2 (TLR Filing)
December 21, 2007 - Petition of the North American Electric Reliability Corp. for Approval of Proposed Reliability Standard in Docket RM08-7 - File 2 of 2 (TLR Filing)
December 21, 2007 - NAESB Report on Standards for Business Practices of Public Utilities (Docket No. RM 05-5 et al)
December 20, 2007 - Order 698-A (Docket Nos. RM96-1-028 and RM05-5-004: Order No. 698-A)
December 6, 2007 - Notice of Extension of Time - Preventing Undue Discrimination and Preference in Transmission Service - Docket Nos. RM05-25-000 and RM05-17-000)
November 15, 2007 - Commission Order on Gas Quality Involving NAESB (Docket No. RP07-504-000)
September 14, 2007 - NAESB Report on Standards for Business Practices of Interstate Natural Gas Pipelines (Docket No. RM 96-1 et al) and Regulation of Short-Term Natural Gas Transportation Services and Regulation of Interstate Natural Gas Transportation Services (Docket No. RM 98-10 et al)
August 2, 2007 - FERC – Notice of White Paper to assist transmission providers in their development of planning processes consistent with the requirements of Order No. 890. (Docket Nos. RM05-17-000, RM05-25-000)
July 27, 2007 - FERC Order Preventing Undue Discrimination and Preference in Transmission Service. (Docket Nos. RM05-17-000 and RM05-25-000)
June 26, 2007 - FERC Order Establishing Technical conference and Providing Guidance.
June 25, 2007 - FERC Final Rule - Order 698 re FERC's amendment to its open access regulations governing standards for business practices and electronic communications with interstate natural gas pipelines and public utilities under RM96-1.
June 13, 2007 - NAESB Status Report and Work Plan in Response to FERC Order 890 "Preventing Undue Discrimination and Preference in Transmission Service; Docket Nos. RM05-17-000 and RM05-25-000
April 19, 2007 - Standards for Business Practices and Communication Protocols for Public Utilities; Docket No. RM05-5-003.
April 11, 2007 - Preventing Undue Discrimination and Preference in Transmission Service (Docket Nos. RM05-17-000 and RM05-25-000; Order No. 890)
April 9, 2007 - NAESB WEQ Filing with FERC: Minor Correction to Coordinate Interchange Business Practice Standards in Docket No. RM05-5-000, "Standards for Business Practices and Communication Protocols for Public Utilities"
March 8, 2007 - Revision of Regulations to Require Reporting of Damage to Natural Gas Pipeline Facilities (Docket No. RM06-18-001; Order No. 682-A)
February 20, 2007 - FERC Notice of Proposed Rulemaking on Standards of Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5-003)
February 16, 2007 - FERC Final Rule, Docket Nos. RM05-17-000 and RM05-25-000; Order No. 890, Preventing Undue Discrimination and Preference in Transmission Service.
February 5, 2007 - NAESB Filing with FERC - WEQ "Standards of Business Practices and Communicaiton Protocols for Public Utilities" (Docket Nos. RM05-5-000)
January 18, 2007 - FERC Notice of Proposed Rulemaking on Standards of Conduct (Docket No. RM07-1-000)
January 9, 2007 - Interim Rule on Standards of Conduct for Transmission Providers Issued (Docket No. RM07-6-000; Order No. 690)
November 17, 2006 - The D.C. Circuit Vacates and Remands Order No. 2004
November 16, 2006 - NAESB WEQ Filing with FERC: Update to Coordinate Interchange Business Practice Standards (Docket RM05-5)
November 15, 2006 - FERC Notice of Request for Supplemental Comments on RM05-17-000 and RM05-25-000 - Due December 15, 2006
November 3, 2006 - Federal Register posting, NAESB Communication Standards NOPR
November 2, 2006 - NAESB Filing with FERC - Addendum to the Testimony of Ronald M. Mucci on Behalf of the North American Energy Standards Board the Notice of Proposed Rulemaking. Voluntarily submitted by NAESB in response to Docket Nos. RM05-25-000 and RM05-17-000.
October 30, 2006 - NAESB WEQ Filing with FERC on Minor Correction - Standards for Business Practices and Communication Protocols for Public Utilities (Docket No. RM05-5)
October 23, 2006 - Department of Energy Surety Assessment Reports.
October 25, 2006 - FERC Notice of Proposed Rulemaking (Docket Nos. RM96-1-027, RM05-5-001) Standards for business practices for Interstate Natural Gas Pipelines, Standards for Business Practices for Public Utilities
October 19, 2006 - FERC Order Instituting Inquiries into Gas-Electric Coordination Issues
October 12, 2006 - Ron Mucci on behalf of NAESB, Speaker Notes - FERC Order 888 Technical Conference
September 21, 2006 - FERC Order 676-A Order Denying Rehearing
August 23, 2006 - Revision of Regulations to Require Reporting of Damage to Natural Gas Pipeline Facilities (Docket No. RM06-18-000; Order No. 682)
August 7, 2006 - NAESB Comments on Docket Nos. RM05-25-000 and RM05-17-000: Preventing Undue Discrimination and Preference in Transmission Services
July 2006 - The National Regulatory Research Institute (NRRI), Briefing Paper - Efforts to Harmonize gas Pipeline Operations With the Demands of the Electricity Sector
June 28, 2006 - Docket No. RM05-28-000: Standards for the Coordination of Business Practices Between Public Utilities and Interstate Natural Gas Pipelines
June 22, 2006 - Summary of NAESB Gas and Electric Interdependency Final Report to the FERC in Docket No. RM05-28-000 "NAESB Report on the Efforts of the Gas-Electric Interdependency Committee".
May 19, 2006 - Docket No. RM05-25-000 and RM05-17-000 - NOPR on Preventing Undue Discrimination and Preference in Transmission Service.
May 18, 2006 - Docket No. RM05-25-000; Order No. 888, FERC Fact Sheet.
April 25, 2006 - Docket No. RM05-5-000; Order No. 676, FERC Final Rule on Standards for Business Practices and Communication Protocols for Public Utilities.
February 24, 2006 - Docket No. RM05-28-000, NAESB Final Report on the Efforts of the Gas-Electric Interdependency Committee
February 17, 2006 - Statement of the North American Electric Reliability Council (NERC) in Support of Comments and Progress Report by NAESB.
February 17, 2006 - Progress Report on NAESB Activities impacting Docket No. RM05-5-000, "Standards for Business Practices and Communication Protocols for Public Utilities."
December 22, 2005 - Comments of NAESB on Second Technical Conference, Docket No. RM05-30-000
December 9, 2005 - Testimony of Michael D. Desselle on behalf of the North American Energy Standards Board at the December 9, 2005 FERC Technical Conference - Docket No. RM05-30-000
November 16, 2005 - Report for NAESB Wholesale Electric Business Practices, Docket No. RM05-5-000, Renumbering of Standards.
July 20, 2005 - Analysis of ANOPR RM00-10-000 Against NAESB OASIS Activities and Planned Activities
July 15, 2005 - NAESB Report to FERC Regarding Errata to Version 1.7 NAESB WGQ Standards, RM96-1 et al and RM98-10 et al
July 1, 2005 - NAESB Comments on Docket No. RM05-5-000 "Standards for Business Practices and Communication Protocols for Public Utilities"
June 27, 2005 - NAESB Report on the Efforts of the NAESB Gas-Electric Interdependency Committee and the Business Practices on Pipeline-Gas-Fired Generation Facility, RM05-28-000 (Cover Letter and Report)
June 27, 2005 - NAESB Report on the Efforts of the NAESB Gas-Electric Interdependency Committee and the Business Practices on Pipeline-Gas-Fired Generation Facility, RM05-28-000 (Cover Letter, Report, and Appendices)
May 27, 2005 - FERC Information Requirements for Available Transfer Capacity, RM05-17-000
May 9, 2005 - FERC Notice of Final Rule on Docket No. RM96-1-026, Order No. 587-S
May 9, 2005 - FERC Notice of Proposed Rulemaking on Docket No. RM05-5-000
May 4, 2005 - NAESB Notification to the FERC of Ratification Results for the WGQ Standards in Response to Paragraph 10 of the Commission's Notice of Proposed Rulemaking and Termination Order in Docket Nos. RM96-1-026 and RM96-1-015
April 22, 2005 - NAESB Report to the FERC Regarding NAESB WGQ Standards in Response to Paragraph 10 of the Commission's Notice of Proposed Rulemaking and Termination Order in Docket Nos. RM96-1-026 and RM96-1-015
April 18, 2005 - NAESB Supplemental Report to the January 18, 2005 WEQ Standards to FERC Under Docket No. RM05-5-000.
April 12, 2005 - NAESB WGQ Version 1.7 Errata Submission to FERC.
March 18, 2005 - NAESB Report to the FERC Regarding the Permanent Numbers Assigned to the NAESB WGQ Standards to Implement Gas Quality Reporting Requirements
February 28, 2005 - NGC Submission of Technical White Papers under Docket No. PL04-3-000
January 18, 2005 - NAESB Submission of WEQ Standards to FERC Under Docket No. RM05-5-000 (Cover Letter)
January 18, 2005 - NAESB Submission of WEQ Standards to FERC Under Docket No. RM05-5-000 (Report)
January 18, 2005 - NAESB Submission of WEQ Standards to FERC Under Docket No. RM05-5-000 (Appendices)
December 21, 2004 - FERC Order 2004-C
December 21, 2004 - FERC NOPR on Version 1.7, Gas Quality Standards and Standards of Conduct for WGQ Federally Jurisdictional Entities
December 14, 2004 - Correspondence from FERC Chairman Patrick Wood.
November 30, 2004 - NAESB Gas Electric Coordination Task Force Final Report to FERC.
November 1, 2004 - NAESB WGQ Gas Quality Standards Submission to FERC.
October 1, 2004 - Version 1.7 Errata Report to the FERC.
September 17, 2004 - NAESB Notification Under the Standards Developing Organizations Advancement Act of 2004.
August 6, 2004 - NAESB Order 2004 Standards Submission to FERC.
June 15, 2004 - NAESB Seams Catalog Submission to FERC.
April 16, 2004 - NAESB Gas Electric Coordination Task Force Interim Report to FERC.
April 14, 2004 - NAESB Submission of WGQ Version 1.7 Standards to FERC Under Docket Nos RM96-1-000, and RM98-1-000, et al.,
February 12, 2004 - NOPR RM04-4-000 - Creditworthiness Standards for Interstate Natural Gas Pipelines.
November 14, 2003 - Comments from FERC Chairman Wood.
September 25, 2003 - Balancing Natural Gas Policy, Fueling the Demands of a Growing Economy - A Report of the National Petroleum Council
September 11, 2003 - NAESB Companion Filing to the North American Electric Reliability Council Final Report on Market Redispatch Program (Docket No. ER02-933-000)
June 25, 2003 - NAESB Supplemental Progress Report on Pipeline Capacity Creditworthiness Standards Development (Docket Nos. GT02-35-000, GT02-38-000)
June 16, 2003 - NAESB Progress Report on Pipeline Capacity Creditworthiness Standards Development (Docket Nos. GT02-35-000, GT02-38-000)
May 23, 2003 - NAESB Progress Report on Pipeline Capacity Creditworthiness Standards Development (Docket Nos. GT02-35-000, GT02-38-000)
December 16, 2002 - NERC and NAESB Report to FERC Regarding Coordination of the Development of Reliability Standards by NERC and of Business Practice Standards and Communications Protocols by NAESB
October 4, 2002 - NAESB Report to FERC Regarding Activities with Respect to the Adoption of Version 1.6 of the NAESB WGQ Standards
October 1, 2002 - NAESB Progress Report to FERC on Partial Day Recalls
NAESB Status Report to FERC on Recent Activities Relating to the Formation of the WEQ - dated September 3, 2002.
NAESB Status Report to FERC Regarding Electric Market Design and Structure, Docket No. RM01-12-000 - dated July 1, 2002.
Order on a Standards Development Organization for the Wholesale Electric Industry - issued May 16, 2002.
Order Providing Guidance on the Formation of a Standards Development Organization for the Wholesale Electric Industry - issued December 19, 2001.
Accompaniment to February 1, 2001 Periodic Report to the FERC RE: Standards for Business Practices of Interstate Natural Gas Pipelines - Order No. 637.
February 1, 2001 Periodic Report to the FERC RE: Standards for Business Practices of Interstate Natural Gas Pipelines - Order No. 637.
January 29, 1999 Periodic Report to the FERC RE: Standards for Business Practices of Interstate Natural Gas Pipelines - Order No. 587-G (RM96-1-007) and Order No. 587-I (RM96-1-009).
GISB Version 1.4 Standards Filing with the Federal Energy Regulatory Commission on February 16, 2000.
June 15, 2000 Report to the FERC with respect to confirmations and cross contract ranking.
Order No. 637-B issued July 26, 2000.
Notice of Availability of Instruction Manual for Electronic Filing of Index of Customers issued June 29, 2000.
FERC Docket Nos. RM98-10-001, RM98-10-004, RM98-12-001, RM98-12-004; Order No. 637-A Regulation of Short-Term Natural Gas Transportation Services, and Regulation of Inerstate Natural Gas Transportation Services issued May 19, 2000.
Final Rule, FERC Docket Nos. RM98-10-000 & RM98-12-000; Order No. 637 Regulation of Short-Term Natural Gas Transportation Services, and Regulation of Inerstate Natural Gas Transportation Services issued February 9, 2000.
November 30, 1998 Letter to FERC RE: Notice of Proposed Rulemaking in Docket No. RM98-10-000.
Docket No. RM98-10-000 NOPR on Regulation of Short Term Natural Gas Transportation Services dated July 29, 1998. FERC requests industry comment on GISB involvement.
Testimony of Rae McQuade before the Subcommittee on Energy and Power U.S. House of Representatives Commerce Committee on "Electronic Commerce: The Energy Industry in the Electronic Age" - July 15, 1998.
Notes from DOE Meeting on April 17, 1998 Presidents Commission on Critical Infrastructure Protection.
Notes from Sandia Labs Meeting on April 17, 1998 Presidents Commission on Critical Infrastructure Protection.
Industry Report to the Federal Energy Regulatory Commission on the Future of OASIS Prepared by Commercial Practices Working Group and the OASIS How Working Group dated October 31, 1997.
August 9, 1996 - GISB Copy Permission to FERC
 
FERC Docket No. RM96-1 Order 587 Series
 
Order No. 587-R issued March 12, 2003.
Order No. 587-Q issued July 23, 2002.
Order No. 587-P issued June 26, 2002.
Order No. 587-O issued May 1, 2002.
Order No. 587-N issued March 11, 2002.
Order No. 587-M issued November 30, 2000.
NOPR - Docket No. RM96-1-015 issued June 30, 2000.
Order No. 587-L issued June 30, 2000.
Order No. 587-K issued April 2, 1999.
Order No. 587-K as listed in the Federal Register.
FERC Docket No. RM96-1-012 Standards for Business Practices of Interstate Natural Gas Pipelines - issued December 17, 1998.
FERC Docket No. RM96-1-011 Standards for Business Practices of Interstate Natural Gas Pipelines - issued December 17, 1998.< /td>
November 3, 1998 Periodic Report to the FERC RE: Standards for Business Practices of Interstate Natural Gas Pipelines Docket No. RM96-1-007.
October 13, 1998 Letter to FERC RE: Use of D-U-N-S Numbers for Common Codes for Business Parties - FERC Order No. 587-G, Docket No. RM96-1-007.
July 14, 1998 Periodic Report to the FERC RE: Standards for Business Practices of Interstate Natural Gas Pipelines - Notice of Docket No. RM96-1-007.
Federal Energy Regulatory Commission Press Release issued April 15, 1998 - Commission Approves New Standards for Gas Industry, Issues Proposals for Key Technical Criteria.
GISB Comments and Report to be Submitted March 20, 1998 to the Commission regarding RM96-1-007 and Accompanying Transmittal Letter.
New Standards Cross-Reference Index to Executive Committee Meeting Transcripts from August 1997 to February 1998.
Order No. 587-I - issued September 29, 1998 as listed in the Federal Register.
Order No. 587-H issued July 15, 1998.
Docket No. RM96-1-008 Notice of Proposed Rulemaking issued April 16, 1998.
Docket No. RM96-1-008 Notice of Proposed Rulemaking as listed in the Federal Register.
Order No. 587-G issued April 16, 1998.
Order No. 587-G as listed in the Federal Register.
Order No. 587-F issued November 12, 1997.
Order No. 587-E issued May 6, 1997.
Order No. 587-D issued April 18, 1997.
Order No. 587-C issued March 4, 1997.
Order No. 587-B issued January 30, 1997.
Order No. 587-A issued October 21, 1996.
Docket No. RM96-1-000 Order 587 Final Rule and Order Establishing Compliance Schedule issued July 17, 1996.
Docket No. RM96-1-000 Notice of Proposed Rulemaking issued April 24, 1996.
FERC NOPR Docket No. RM96-1-003 - Dated November 13, 1996 - Notice of Technical Conference.
GISB filed Comments with the FERC on upcoming December 12 and 13, 1996 Technical Conference.
Docket No. RM96-1-000 report of the Gas Industry Standards Board on Docket No. RM96-1-000 filed September 30, 1996. This document contains Volume 1 of 4 of the Filing. The contents of Vol 2 are available in the Executive Committee (EC) meeting materials for the August meeting. The contents of Vol 3 are available in the EC meeting materials for the September meeting. Volume 4 contains the transcripts from the September 12 and 13 EC meeting. The transcripts can be purchased from Jane Copeland, Ak/Ret Reporting & Records, Inc., 1-800-388-9037.
Docket No.RM96-14-001 FERC NOPR on Secondary Market Transactions on Interstate Natural Gas Pipelines specific to the Proposed Experiment Pilot Program - issued July 31, 1996.
FERC NOPR on Secondary Market Transactions on Interstate Natural Gas Pipelines. Docket No.RM96-14-000 - issued July 31, 1996. RM96-14-000 as listed in the Federal Register.
Comments made to FERC on RM96-1-000 on questions directed to GISB concerning implementation schedule, future standard development and minimum standards.
Supplemental filing for data elements and related standards. Membership ratified all standards on May 17, 1996.
GISB Standards filed with FERC on Advanced Notice of Proposed Rulemaking RM96-1-000 concerning Nominations, Flowing Gas, Invoicing, Electronic Delivery Mechanisms, and Capacity Release as of March 15, 1996.
Docket No. RM93-4-011 (Order 563-A) - issued May 2, 1994

If you should encounter any problems or need further information, please call (713) 356-0060.
Privacy Policy | About NAESB | Contact NAESB | Email: naesb@naesb.org | Home Page

Copyright © 2024 North American Energy Standards Board, Inc. All Rights Reserved.
This material may not be reproduced in any form without permission.